Forwards Addl Info Re Shift Manning & Operator Retraining. for one-unit Operation,Each Shift Will Include Two Senior Reactor Operators & Two Reactor Operators.Util Conducts Annual Requalification Training
ML19296C564
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/21/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Rubenstein L
Office of Nuclear Reactor Regulation
References
NUDOCS 8002260649
Download: ML19296C564 (3)


Text

7 I

TENNESSEE VALLEY AUTHORITY C H A T T A N CW. A . TENNF53rE 374,1 400 Chestnut Street Tower II February 21, 1980 Director of Nuclear Reactor Regulation Attention: Bir. L. S. Rubenstein, Acting Chief Light Water Reactors Branch No. 4 Division of Project >!anagement U.S. Nuclear Regulatory Coctaission

.is hin s to n , DC .'0535

Dear Mr. Rubenstein:

In the Matter of the Application of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 Enclosed is additional information on Sequoyah Nuclear Plant shift manning and operator retraining.

Very truly yours, TESNESSEE VALLEY AUTHORITY

\ O. 'T M

'id M. Mills, [anager Nuclear Regulation and Safety Enclosure An Ec a: cen m ty E~eove b22h

ENCLOSURE SHIFT MANNING For one-unit operation, each shift crew at Sequoyah Nuclear Plant will include at least two Senior Reactor Operators (SRO) and two Reactor Operators (RO). One SRO and one RO will be stationed in and restricted to the control room area at all times unless relieved by a similarly qualified operator. One RO will be stationed in the control room to provide relief and operational assistance to the licensed unit operator but will not be restricted to the control room area. The remaining SRO has overall responsibility for the plant but is not restricted to any specific area.

S

i OPERA 10R RETRAINING To ensure continuing qualification of reactor operators, TVA conducts annual requalification training. The employees who had their license examinations in January - March 1979 have been through requalification training, and the annual retraining written exams are currently scheduled so that testing for the last gro'ip of operators will be completed by April 16, 1980. All grading will be completed by April 30, 1980, and those not meeting the passing criteria of a minimum of 80 percent overall and 70 percent in each category will be placed in an accelerated requali-ficiation program.

,