Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000219/LER-1979-033, Forwards LER 79-033/03L-0 + (ML19209C886)
- ML19209C887 + (ML19209C887)
- ML19209C888 + (ML19209C888)
- ML19209C889 + (ML19209C889)
- ML19209C890 + (ML19209C890)
- 05000219/LER-1979-033-03, /03L-0:on 790917,electromatic Relief Valve Pressure Switch 1A83A Tripped at Pressure in Excess of Limit.Caused by Defective High Pressure Microswitch. Replacement Switch Installed + (ML19209C893)
- ML19209C894 + (ML19209C894)
- ML19209C895 + (ML19209C895)
- ML19209C896 + (ML19209C896)
- ML19209C897 + (ML19209C897)
- ML19209C898 + (ML19209C898)
- ML19209C899 + (ML19209C899)
- ML19209C900 + (ML19209C900)
- ML19209C901 + (ML19209C901)
- ML19209C902 + (ML19209C902)
- 05000259/LER-1979-023, Forwards LER 79-023/03L-0 + (ML19209C904)
- ML19209C905 + (ML19209C905)
- ML19209C906 + (ML19209C906)
- ML19209C907 + (ML19209C907)
- 05000277/LER-1979-041-03, /03L-0:on 790905,inadvertently Opened 440-volt Breaker Switch Made RHR Loop Injection Valve Inoperable. Caused by Breaker Switch Being Hit by Scaffolding Transported Through Area.Breaker Switch Reclosed + (ML19209C908)
- 05000259/LER-1979-023-03, /03L-0:on 790917,daily Source Checks on Various Continuous Air Monitors Were Missed Due to Airborne Contamination on Refuel Floor.Caused by Personnel Failure to Realize That Checks Are Tech Spec Requirement + (ML19209C909)
- IR 05000339/1979040 + (ML19209C910)
- ML19209C911 + (ML19209C911)
- 05000302/LER-1979-086, Forwards LER 79-086/03L-0 + (ML19209C912)
- ML19209C913 + (ML19209C913)
- ML19209C914 + (ML19209C914)
- 05000302/LER-1979-086-03, /03L-0:on 790916,channel D Reactor Bldg High Pressure Bistable Tripped.Caused by Buildup of Dust on Shaft of Reactor Bldg Switch BS-62-PS.Switch Was Disassembled, Cleaned,Reassembled & Returned to Svc + (ML19209C916)
- ML19209C917 + (ML19209C917)
- ML19209C918 + (ML19209C918)
- ML19209C919 + (ML19209C919)
- ML19209C920 + (ML19209C920)
- ML19209C921 + (ML19209C921)
- ML19209C923 + (ML19209C923)
- ML19209C924 + (ML19209C924)
- ML19209C925 + (ML19209C925)
- ML19209C926 + (ML19209C926)
- ML19209C927 + (ML19209C927)
- IR 05000321/1979017 + (ML19209C928)
- ML19209C929 + (ML19209C929)
- ML19209C931 + (ML19209C931)
- ML19209C934 + (ML19209C934)
- ML19209C935 + (ML19209C935)
- ML19209C939 + (ML19209C939)
- ML19209C941 + (ML19209C941)
- ML19209C942 + (ML19209C942)
- PNO-III-79-010, local Intervenors Issued Press Releases Stating Util Has Bypassed Requirements Re Setting of Reactor Vessel.Const Problems Have Prevented Shield Wall from Reaching Elevation Estimated for Vessel Placement + (ML19209C943)
- ML19209C945 + (ML19209C945)
- ML19209C946 + (ML19209C946)
- ML19209C950 + (ML19209C950)
- ML19209C953 + (ML19209C953)
- ML19209C954 + (ML19209C954)