Other: 05000266/LER-1950-266-75, /75-4:on 750226,primary to Secondary Tube Failure Occurred in Steam Generator B & Went from Initial Point Leak to Max of 125 Gallons Per Minute.Extent of Incident & Radioactivity Below Point to Initiate Evacuation, 05000282/LER-1979-027-01, /01T-0:on 791002,tube Break Occurred in Steam Generator 11.Caused by Mechanical Wear.Two Defective Tubes Plugged, ML19209C950, ML19210C123, ML19259D260, ML19259D267, ML19259D273, ML19259D301, ML20031F203, ML20070J896
|
MONTHYEAR05000266/LER-1950-266-75, /75-4:on 750226,primary to Secondary Tube Failure Occurred in Steam Generator B & Went from Initial Point Leak to Max of 125 Gallons Per Minute.Extent of Incident & Radioactivity Below Point to Initiate Evacuation1975-02-27027 February 1975 /75-4:on 750226,primary to Secondary Tube Failure Occurred in Steam Generator B & Went from Initial Point Leak to Max of 125 Gallons Per Minute.Extent of Incident & Radioactivity Below Point to Initiate Evacuation Project stage: Other ML20070J8961976-09-29029 September 1976 RO 76-05:on 760915,pressurizer Level Fell Below 45% Level Setpoint,Resulting in Decreases of Pressurizer Pressure & Vol Control Tank Level.Caused by Leaking Tube in Steam Generator A.Cause of Tube Failure Will Be Evaluated Project stage: Other ML20031F2031978-12-15015 December 1978 Forwards Summary of Recent Adverse Steam Generator Operating Experience at Facilities.Assessment of Each Event & Safety Significance Provided Project stage: Other ML19259D2731979-09-25025 September 1979 PNO-II-79-01:on 790925,turbine Trip & Reactor Trip Occurred Because of High Feedwater Heater Level.Caused by Failure to Realign Charging Pump Suction from Refueling Water Storage Tank to Vol Control Tank Project stage: Other ML19259D3011979-09-25025 September 1979 PNO-II-79-01A:after Reactor Trip & Safety Injection,Max Plant Cooldown Rate in Hot Leg Exceeded Cooldown Limit by 10 F in 30 Minutes.Evaluation Underway.Supplements PNO-II-79-01 Project stage: Other ML19259D2601979-10-0202 October 1979 PNO-III-79-09:on 791002,steam Generator Tube Ruptured, Initiating Reactor & Turbine Trip & Safety Injection. Cause Not Stated.Release Occurred from Turbine Bldg. Steam Isolation Valves Are Closed Project stage: Other ML19259D2671979-10-0303 October 1979 PNO-III-79-09A:on 791002,tube Ruptured in Steam Generator A.Amount of Radioactive Matl Released to Containment Bldg Through Opened Rupture Disk Is Small.Cooldown Was Accomplished Satisfactorily.Plant Remains Shut Down Project stage: Other ML19209C9501979-10-0303 October 1979 PNO-III-79-09B:updates PNO-III-79-09A.On 791003,unit Reached Cold Shutdown.Caused by Tube Rupture in Steam Generator A. Plant Will Remain Shut Down Pending Completion of Generator Insp & Necessary Repairs Project stage: Other 05000282/LER-1979-027-01, /01T-0:on 791002,tube Break Occurred in Steam Generator 11.Caused by Mechanical Wear.Two Defective Tubes Plugged1979-10-16016 October 1979 /01T-0:on 791002,tube Break Occurred in Steam Generator 11.Caused by Mechanical Wear.Two Defective Tubes Plugged Project stage: Other ML19209D0791979-10-16016 October 1979 Confirms Commitment Made to NRC at 791012 Meeting Re Submittal of License Amend Request within 30 Days to Adopt Primary & Secondary Coolant Activity Tech Specs.Forwards Interim Limit on Primary Coolant Iodine Activity Project stage: Meeting ML19254E8741979-10-22022 October 1979 Summary of 791012 Meeting W/Util Re Steam Generator Tube Rupture on 791002 Project stage: Meeting ML19210C1231979-11-0606 November 1979 Forwards 10 Photographs Taken During Util Insp of 791002 Steam Generator Tube Rupture.Photographs Show Location of Springs & Eroded & Ruptured Tubes.Addl Photographs on File at Plant Project stage: Other 1979-10-02
[Table View] |
Text
..x 021t: es.a;s.., cv -
WANA.4
.w n.
- a..
.;.$m m ~.s-7.:
,L M;W- = -
PPILIMINARY NOTIFICATION Date:
+
ocyohar 3, 1979 PFILIMI}ARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-III-79-0Mi Bir Dreliminary notificat. ion constitutes EARLY notice of events of POSSIELE safety or public interest significance.
The infori::ation presented is as initially received without verification or evalustion and is basically all thet is known by IE staff on this date.
Facility:
Northern States Power Co=pany Prn1ric Island, Unit 1 (DN 50-282)
Sub $ e.r.t :
TUBE RUPTURE T.N S~
. GENERATOR A Th La L3,m update. ol PN-Il i-7').- O'! A At 11:!.5 s.:. on Octcher 3. -1979, the Unir reached the cold shutdow: condition (re :te: ceelent syste:: te=perature 1e,s than 200 F).
The plant will retain 0
shutccra pendi.g cc:pletica et the etcc: generator in0pection and cc pletica of the neces.ary repairs.
Inc duratio: of the shutdown in unkncen.
Cor :tM ear i ons (vin th e Red Thanc) 1.crween r' c licensen, Rec. inn TTT and TT.
hw/= 1:een dis tuulluued. Additicually, coatinuous caualu;. of the Re; tion III Sce gen:y Respense Csnt'er has been discontinued.
The Region ill site tcan has con:leted their minnton and han departed the nir.c.
The.cnident in,pneror niid RcI1cn 111 Stecialist inspectors will fcilow the licensce's acticns to rescive this proh: c.
int na".es ci Mi"n-set a and Wiscensin have bet.n notified ef this infer =4 tion-
edia tutetest wutinces Lu be high.
~'h:. - ini rna tio n i s c ur r e nt as of 2:00 p.c.,
Octcber 3, 1979.
r
/ I r7 b
,. -h'~'. f (L i
A 777T C.
C.
'CVd
. <._ _ y *j g
..sn.
P:ep ted 3y Actiu, 31sach Chief
- -.: : _ a.., ).,
,c
-vo_c.a~u,':
1
)
{
s
. l' * * " i '.. C '" ?
Y r.'4 n U. It*2d 3 St Ca _:x s hcdrie Ccmaissiencr Bradford S. J. Chilh, SECI Cc.ci>ri.ce: Z e:. net Cc=is sicner Ahea rne C. C. Kare:::er, CA Cc=ie ri: er Giliar,ky ACES (For Dist ribution)
Tran: it.cd: F2'23 P. Eldg IE:XCOS (IE: EQ Dist.
L. V. Go::ick, EDO H. R. Denten, NRR E. I..
Ornstein, EDO R. C. DeYoung, NRR J. J. Touchatd, PA R. J. Ma tt s o n, NE:<
Landow (6 min /page)
N. M. Es11ct, MPA D. Vassallo, NRR J. J. C=..i n p, 01 A E. G. Ryan, OSP Tj.Eisenhut, NRR E. L Shapar, ELD pS Eldg
(}D.IL)
W. J. Dircks. KMSS R. Minogue, SD S. Levine, PIS IE:X005 7910180 PFILIMINA?.i NOTIFICATION