ML19209C898

From kanterella
Jump to navigation Jump to search
Forwards Div of Responsibility for Human Factors Research within Ofc of Nuclear Regulatory Research
ML19209C898
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/30/1979
From: Bennett G
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To:
Office of Nuclear Reactor Regulation
Shared Package
ML19209C834 List:
References
TASK-TF, TASK-TMR NUDOCS 7910180452
Download: ML19209C898 (2)


Text

Date 7.:r.,.

ROUTING AND TRANSMITIAL SLIP 7/30/79 o.............

~,m.n,.

He

  • noutmo sier TO: Name off;ce symbol, room number, initials Date Ilding, Agency / Post)

=an s v o, J--

... s o.--

Leo Beltracchi so ma.

3.

L. S. Tong 2.

C. Johnson W. Farmer R. DiSalvo M. Cullingford t'

Action Flie Note and Return W. veseiy Approvai ro< c> ear ace rer coaversatioa As Requested For Correction P_repare Reply W. Beach

_circuiate For Your Information '

See Me Comment invesgate Signature J. Pittman coord: nation Justify REMARKS S. Sturges Per our telecon of July 27, 1979. This is the division of responsibility for human factors research within RES as approved by Saul Levine.

HEMARK$

' Attached is the division of responsibilities on human factors research in RES.

This was agreed to by Mr. Levine, Dr. Budnitz and Dr. Rowsome on July 15, 1979.

m 45 CC

- \\

s sY DO hot use this form as a RECORD of approvals. concurrences, disposats, r

gj clearances, and similar actions

$.'.Y O '~.1,s.

(('C'[~'

FROMHName. ora. symbor. Agency / Post)

Hoom No.-Bldg.

c a

o.---..-.

o.,-. -~

O"~~~'"

U~~~""'""~'

" " ~ " ' - - - - -

Gary Bennett

?

f ftOM IMean.l Of fICE DAIE Gary Bennett 54 W2 0FTioNAL FORM 41 (Rev. 7-76) el40NE Pf98 Crit >0d tt Gs4 h

[( 3 a.eu sae g en-041 8II 3354 FM MI CI 1101-11 3 x

L) 7 01018 0 +0 2 -

s

,J f

,JUL161919 IlullAN FACTORS RESEARCil PAS RSR o Analyze experience data to detennine o Research on adequacy of simulators for human error rates operator training

  • operators
  • scope of accidents
  • test and maintenance personnel
  • realism of feedback on plant response o Develop models to predict human error o Research with which 1&E and NRR can develop rates criteria for plant operating and maintenance procedures o Evaluate significance of human errors
  • completeness from risk standpoint
  • consistency with high hunan reliability
  • provisions for alterations o Determine maintenance and human error contributions for system unavailability Ergononic studies of control rooms and auxiliary o

control panels I

  • research on operator saturation by numerous alarms, eye movenent, attention span, hand movements, etc.
  • guidance for alarm suppression, layout criteria, improvements in man-machine interface CD t%

Ln

.s

.?w sJ

.