ML19209C924

From kanterella
Jump to navigation Jump to search
Forwards Final Deficiency Rept Re Failure to Obtain Required Design Pressure at Outlet of Containment Air Coolers
ML19209C924
Person / Time
Site: Midland
Issue date: 10/15/1979
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19209C925 List:
References
HOWE-269-79, NUDOCS 7910180480
Download: ML19209C924 (1)


Text

'

i N D,

CODSU m 8fS p:'

POW 8r NM O

ggagy Stephen H. Howell 0

r 4

Senior Vice President General Offices: 1945 West Parnell Road, Jackson, Michigan 49201 * (5171 788 0453 October 15, 1979 Hove-269-79 Mr J G Keppler, Regional Director Office of Inspection and Enforcement US Nuclear Regulatory Co-ission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAI;D UUCLEAR PLANT UNIT NO 1, DOCITT I'O 50-329 UNIT NO 2, DOCEar ::0 50-330 SERVICE WATER SUPPLY PRESSURE FOR T'-IE COIfi.GIME :T AIR COOLERS

Reference:

S H Howell letter to J G Keppler; Midland Nuclear Plant; Unit No 1, Docket No 50-329; Unit No 2, Docket No 50-330; Service Vater Supply Pressure for the Centain:ent Air Coolers; Serial Hove-219-79, dated August 7,1979 The referenced letter va,s an interi: 50 55(e) report regarding the failure to obtain the required design pressure at the outlet of the centainment air coolers. This letter is the final report. Corrective actions and their implementation dates are provided in the attachment.

s wRa/lr

Attachment:

MCAR-30, Final Report, dated Septe=ber 26, 1979 CC: Director of Office of Inspection and Enforcement Att: Mr Victor Stello, USIIRC (15)

V Director of Office of Management Informaticn and Pregra: Control, USNRC (1) 1176

?42 Bh(

V 9101804 % O

~^

S

.