ML19209C925

From kanterella
Jump to navigation Jump to search
Forwards Final Deficiency Rept Re Failure to Obtain Required Design Pressure at Outlet of Containment Air Coolers
Date released: 08/11/2019 Download: ML19209C925


Final Deficiency Rept Re Failure to Obtain Required Design Pressure at Outlet of Containment Air Coolers.Corrective Action:Pump Provided in Each Svc Water Supply Line to Boost Svc Water Pressure
ML19209C927
Person / Time
Site: Midland
Issue date: 10/15/1979
From: Brian Anderson
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
REF-PT21-79-150-003
Download: ML19209C927 (4)
Forwards Final Deficiency Rept Re Failure to Obtain Required Design Pressure at Outlet of Containment Air Coolers
ML19209C924
Person / Time
Site: Midland
Issue date: 10/15/1979
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19209C924 (1)