Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18153B792 + (ML18153B792)
- IR 05000280/1989008 + (ML18153B793)
- ML18153B794 + (ML18153B794)
- ML18153B797 + (ML18153B797)
- 05000280/LER-1989-022, :on 890605,unplanned Initiation of ESF Occurred During Preparations to Commence Special Test.Caused by Personnel Error.Testing Suspended & Simulated 50% Level Signals Removed from Channel III + (ML18153B798)
- 05000280/LER-1989-021, :on 890603,one of Three Control Room/Relay Room Chillers Tripped on High Condenser Discharge Pressure.Caused by Insufficient Flow to Condenser Due to Clogged Y Type Suction Strainer for Condenser a + (ML18153B799)
- ML18153B801 + (ML18153B801)
- IR 05000280/1989017 + (ML18153B803)
- ML18153B804 + (ML18153B804)
- ML18153B805 + (ML18153B805)
- ML18153B806 + (ML18153B806)
- IR 05000280/1989018 + (ML18153B808)
- PNO-II-89-053, on 890707,zero Power Physics & turbine-driven Auxiliary Feedwater Pump Tests Satisfactorily Completed & Unit Connected to Grid.Current Reactor Power Level Approx 30%.Unit 2 Currently Scheduled for Restart on 890811 + (ML18153B811)
- ML18153B812 + (ML18153B812)
- ML18153B813 + (ML18153B813)
- ML18153B814 + (ML18153B814)
- IR 05000280/1989009 + (ML18153B815)
- 05000280/LER-1989-023, :on 890613,main Control Room/Emergency Switchgear Room Chiller Found Inoperable Due to Degraded Performance.Caused by Low Refrigerant Charge.Chiller B Recharged & Administrative Control Established + (ML18153B816)
- ML18153B817 + (ML18153B817)
- ML18153B819 + (ML18153B819)
- IR 05000280/1989019 + (ML18153B821)
- 05000280/LER-1989-025, :on 890622,fault Occurred on 120 Volt Vital Bus I-1,circuit 19 During Performance of Special Test.Caused by Personnel Error.Individual Reminded of Need to Exercise Caution When Installing Jumpers + (ML18153B823)
- 05000280/LER-1989-024, :on 890624,one of Three Control Room/Relay Room chillers,1-VS-E-1C,tripped on High Discharge Pressure.Caused by Inadequate Supply of Svc Water.Chiller B Stopped,Svc Water Supply Unisolated & Pumps Vented + (ML18153B824)
- ML18153B825 + (ML18153B825)
- ML18153B827 + (ML18153B827)
- ML18153B828 + (ML18153B828)
- ML18153B830 + (ML18153B830)
- IR 05000280/1989020 + (ML18153B831)
- ML18153B832 + (ML18153B832)
- ML18153B834 + (ML18153B834)
- ML18153B835 + (ML18153B835)
- ML18153B836 + (ML18153B836)
- ML18153B837 + (ML18153B837)
- ML18153B838 + (ML18153B838)
- ML18153B839 + (ML18153B839)
- IR 05000280/1989012 + (ML18153B840)
- ML18153B841 + (ML18153B841)
- ML18153B842 + (ML18153B842)
- ML18153B843 + (ML18153B843)
- ML18153B844 + (ML18153B844)
- ML18153B845 + (ML18153B845)
- ML18153B847 + (ML18153B847)
- ML18153B848 + (ML18153B848)
- ML18153B849 + (ML18153B849)
- ML18153B850 + (ML18153B850)
- ML18153B851 + (ML18153B851)
- 05000280/LER-1989-026, :on 890709,nuclear Instrumentation (Ni) Failed Resulting in Spurious Ni Dropped Rod Signal & Automatic Initiation of 30% Power Turbine Runback.Turbine Trip/Reactor Trip Occurred Due to hi-hi Level Condition + (ML18153B852)
- ML18153B854 + (ML18153B854)
- ML18153B856 + (ML18153B856)
- 05000280/LER-1989-029, :on 890714,intake Canal Level Sensor Channel Not Placed in Trip within 1 H of Inoperability.Caused by Operator Personnel Error.Procedures Developed for Stop Log Installation + (ML18153B857)
- 05000280/LER-1989-028, :on 890713,access Plugs from Entrance to Two Underground Fuel Oil Tanks Discovered Removed.Caused by Lack of Administrative Control Guidance in Sample Procedure.Plugs Reinstalled & Sample Procedure Revised + (ML18153B858)