Forwards Insp Repts 50-280/89-18 & 50-281/89-18 on 890523-26.No Violations or Deviations Noted.Nrc Should Be Informed If Understanding of Oral Commitment Discussed in Rept Differs from Rept Statements
ML18153B806
Person / Time
Site: Surry  Dominion icon.png
Issue date: 07/05/1989
From: Gibson A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18153B807 List:
References
NUDOCS 8907140176
Download: ML18153B806 (2)


See also: IR 05000280/1989018

Text

.

. *

Docket Nos. 50-280, 50-281

License Nos. DPR-32, DPR-37

July 5, 1989

Virginia Electric and Power Company

ATTN:

Mr; W. R. Cartwright, Vice President,

Nuclear Operations

5000 Dominion Boulevard

Glen A11en, VA

23060

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50:280/89-18 AND 50-281/89-18

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by.

G. A. Belisle on May 23-26, 1989.

The inspection included a review of

activities .authorized for your Surry facility.

At the conclusion of the

inspection; the findings were discusse.d with those members of your staff

identified in the enclosed Inspection Report.

Areas. examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities i~ progre~s.

-

Within the scope of the inspection, no violations or deviations were

identified.

The *enclosed Inspection Report documents an.oral commitment (see paragraph 3)

made by a licensee representative and discussed in the exit interview. If your

understanding of this commitment differs from the report *statements, pl ease

. inform this office promptly.

This oral commitment involves the licensee

providing to the NRC an action plan resolving licensee acti~ns to contain a

thermal barrier leak from the reactor coolant pumps into the component cooling

water system.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,.

Title 10, Code of Federal Regulations, a copy of this letter and .its enclosure

will be placed in the'NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Enclosure:

(See page 2)

Sincerely,

original signed by

Albert F. Gibson

Albert F. Gibson, Director

Division of Reactor Safety

8907140176 890705 :--

PDR

ADOCK 05000280

O

, PNU *

  • -**-- .. ----*-----~ .-

1 \\

.

.

0/

Virginia Electric and Power Company*

Enclosure:

Inspection Report

cc w/encl:

M. R. Kansler, Station Manager

R. F. Saunders, Manager - Nuclear

Programs and Licensing

Commonwealth of Virginia

bee w/encl:

NRC Resident Inspector

Document Control Desk

RI! :Dfi~

?<f/:')

A Ire 1 is 1 e: td

06!JJ /89

~I~S

CJulian

06/l{i/89

2

July 5, 1989