ML18153B854

From kanterella
Jump to navigation Jump to search
Ack Receipt of & Payment of Civil Penalties in Amount of $500,000 Proposed in NRC .Understands That Parts in Valve 01-SW-PCV-10B Overhauled & Replaced & Svc Water Pump 02-SW-P-018 Replaced
ML18153B854
Person / Time
Site: Surry  
Issue date: 08/10/1989
From: Wong H
NRC OFFICE OF ENFORCEMENT (OE)
To: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
EA-88-296, NUDOCS 8908160214
Download: ML18153B854 (1)


Text

AUS 1 o 1989 Docket Nos.

50-280 and 50-281 License Nos.

DPR-32 and DPR-37 EA 88-296 Virginia Electric and Power Company ATTN:

Mr. W. R. Cartwright, Vice President, Nuclear Operations 500 Dominion* Bou 'te.vard Glen Allen, Virginia 23060 Gentlemen:

_De.)

This will acknowledge receipt of your letter dated June 14, 1989 and your check for $500,000 in payment for the civil penalties proposed by NRC in a letter dated May 18, 1989.

Based on a conversation between E. Grecheck of your staff and P. Fredrickson of the Region II staff, regarding Violation V.D, WE understand that you overhauled and replaced the parts under question in valve Ol-SW-PCV-108, replaced service water pump 02-SW-P-lOB and located the material control tags for the replacement parts in heat exchanger 02-SW-E-lA.

This and your remaining corrective actions will be examined during future inspections.

cc:

S. 0. Ebneter, RII DISTRIBUTION:

Jlieberman, OE HWong, OE WTroskoski, OE GJenkins, RII Day File EA File DCS OE (l,.,f WTroskoski 8/1() /89 Dt(J;'

HWong 8//" /89 Sincerely, Original signed by Howard J. Wong Howard J. Wong, Deputy Director Office of Enforcement