Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18101B157 + (ML18101B157)
- ML18101B158 + (ML18101B158)
- ML18101B159 + (ML18101B159)
- ML18101B160 + (ML18101B160)
- ML18101B162 + (ML18101B162)
- IR 05000272/1995017 + (ML18101B163)
- IR 05000272/1995002 + (ML18101B164)
- ML18101B166 + (ML18101B166)
- ML18101B167 + (ML18101B167)
- ML18101B168 + (ML18101B168)
- ML18101B169 + (ML18101B169)
- ML18101B171 + (ML18101B171)
- ML18101B172 + (ML18101B172)
- ML18101B173 + (ML18101B173)
- ML18101B174 + (ML18101B174)
- ML18101B175 + (ML18101B175)
- ML18101B176 + (ML18101B176)
- RAIO-0418-59505, LLC Response to NRC Request for Additional Information No. 381 (Erai No. 9397) on the NuScale Design Certification Application + (ML18101B177)
- ML18101B178 + (ML18101B178)
- 05000311/LER-1995-008-02, :on 951215,Tech Spec 4.9.9 Missed Isolation Testing Discovered.Caused by Lack of Adequate Controls to Ensure All Testing Requirements Addressed.Procedure S2.IC-FT.RM--0088(Q) Revised + (ML18101B179)
- ML18101B185 + (ML18101B185)
- 05000272/LER-1995-029-01, :on 951219,4 Kv Vital Buses Declared Inoperable.Caused by Inadequate Initial Design of GE Type SBM Switches by Mfg.All Suspect Switches in 4 Kv Switchgear, Vital & Group Busses Replaced + (ML18101B186)
- ML18101B187 + (ML18101B187)
- ML18101B188 + (ML18101B188)
- ML18101B190 + (ML18101B190)
- ML18101B191 + (ML18101B191)
- ML18101B193 + (ML18101B193)
- ML18101B194 + (ML18101B194)
- ML18101B195 + (ML18101B195)
- 05000272/LER-1995-027-01, :on 761211,doses During LOCA Exceeded Plant Licensing Basis Due to Inaccurate Assumptions in Dose Calculations.Revised Procedures in August 1994.W/forwarding Ltr + (ML18101B200)
- ML18101B201 + (ML18101B201)
- ML18101B202 + (ML18101B202)
- ML18101B204 + (ML18101B204)
- ML18101B205 + (ML18101B205)
- 05000272/LER-1996-001, :on 960103,discovered Insufficent Thermal Overload Relay Heater Margin.Caused by Inadequate Design of TOLs in 1970s.Issued Calculation ES-18.007 for Sizing of Thermal Overload Heaters for SR Rotating Loads + (ML18101B206)
- ML18101B209 + (ML18101B209)
- IR 05000272/1995021 + (ML18101B211)
- 05000311/LER-1996-001-01, :on 960109,TS Violation Occurred Re Failure to Perform Chemistry Sampling within Required Timeframe.Caused by Personnel Error.Personnel Counseled & Chemistry Dept Shift Turnover Process Improved + (ML18101B213)
- ML18101B214 + (ML18101B214)
- ML18101B216 + (ML18101B216)
- ML18101B217 + (ML18101B217)
- ML18101B218 + (ML18101B218)
- ML18101B220 + (ML18101B220)
- ML18101B221 + (ML18101B221)
- ML18101B222 + (ML18101B222)
- ML18101B224 + (ML18101B224)
- ML18101B225 + (ML18101B225)
- ML18101B226 + (ML18101B226)
- ML18101B227 + (ML18101B227)
- ML18101B228 + (ML18101B228)
- ML18101B230 + (ML18101B230)