Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18038B904 + (ML18038B904)
- ML18038B905 + (ML18038B905)
- ML18038B906 + (ML18038B906)
- ML18038B907 + (ML18038B907)
- ML18038B908 + (ML18038B908)
- ML18038B910 + (ML18038B910)
- ML18038B911 + (ML18038B911)
- ML18038B913 + (ML18038B913)
- ML18038B914 + (ML18038B914)
- ML18038B918 + (ML18038B918)
- ML18038B920 + (ML18038B920)
- IR 05000259/1997006 + (ML18038B922)
- 05000260/LER-1997-002-04, :on 970626,discovered That Four Surveillance Instructions (Sis) Did Not Fully Test All Relay Logic Combinations.Caused by Personnel Error.Verified Relay Contacts Operable & Revised Applicable SIs + (ML18038B923)
- ML18038B925 + (ML18038B925)
- ML18038B927 + (ML18038B927)
- ML18038B928 + (ML18038B928)
- ML18038B929 + (ML18038B929)
- 05000260/LER-1997-003, Forwards LER 97-003-00 Re Failure of HPCI Surveillance Instruction + (ML18038B930)
- ML18038B931 + (ML18038B931)
- 05000260/LER-1997-003-03, :on 970711,determined That HPCI Turbine Speed Lower than Indicated.Caused by Improper Evaluation of Valve Leak.Work Orders to Troubleshoot HPCI Initiated + (ML18038B932)
- ML18038B933 + (ML18038B933)
- ML18038B934 + (ML18038B934)
- ML18038B935 + (ML18038B935)
- ML18038B936 + (ML18038B936)
- ML18038B937 + (ML18038B937)
- ML18038B938 + (ML18038B938)
- ML18038B940 + (ML18038B940)
- ML18038B941 + (ML18038B941)
- ML18038B943 + (ML18038B943)
- ML18038B944 + (ML18038B944)
- ML18038B949 + (ML18038B949)
- ML18038B950 + (ML18038B950)
- ML18038B951 + (ML18038B951)
- ML18038B952 + (ML18038B952)
- ML18038B953 + (ML18038B953)
- ML18038B956 + (ML18038B956)
- ML18038B957 + (ML18038B957)
- ML18038B958 + (ML18038B958)
- ML18038B959 + (ML18038B959)
- ML18038B960 + (ML18038B960)
- ML18038B961 + (ML18038B961)
- ML18038B963 + (ML18038B963)
- 05000296/LER-1997-005, Forwards LER 97-005-00,providing Details Concerning Failure to Enter LCO When Unit 3 Primary Containment Isolation Flow Control Valve Was Declared Inoperable Due to Sticking Solenoid Valve.Rsos Developed Mindset Re Failure Mech + (ML18038B964)
- ML18038B965 + (ML18038B965)
- 05000296/LER-1997-005-02, :on 970824,LCO Was Not Entered When Valve Was Malfunctioning.Caused by Lack of Questioning Attitude by Operations Crew.Involved SROs Were Counseled & Problem Evaluation Rept Will Be Discussed + (ML18038B966)
- ML18038B967 + (ML18038B967)
- 05000260/LER-1997-004, Forwards LER 97-004-00,providing Details Re Failure to Perform Required Surveillances During Refueling Outage Time Frames as Required by TS + (ML18038B968)
- ML18038B969 + (ML18038B969)
- 05000260/LER-1997-004-03, :on 970909,TS Surveillances Were Not Performed During Refueling Outage Timeframe.Caused by Personnel Error. Incorporated Missed Snubber & Vacuum Breaker Surveillances Into Refueling Outage Schedule + (ML18038B970)
- ML18038B971 + (ML18038B971)
- ML18038B972 + (ML18038B972)