Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17292B415 + (ML17292B415)
- GO2-98-110, Responds to NRC Re Violations Noted in Insp Rept 50-397/98-07.Corrective Actions:Plan Was Established & Implemented to Reduce Potential for Airborne Radioactivity & Surveys Were Conducted of Adjacent Areas Outside Wetwell + (ML17292B417)
- GO2-98-118, Forwards Rev 20 to WNP-2 Emergency Plan IAW 10CFR50.4(b), 50.54(q) & 10CFR50,App E.Detailed Synopsis of Changes,Encl. Changes Do Not Reduce Effectiveness of Plan + (ML17292B420)
- GO2-98-124, Responds to NRC Re Violations Noted in Insp Rept 50-397/98-10.Corrective Actions:Individual Has Been Designated W/Responsibility for Assuring Ssac Meeting Minutes Are Maintained Per Procedure + (ML17292B426)
- GO2-98-141, Forwards Response to Violations Noted in Insp Rept 50-397/98-09.Corrective Actions:Conducted Briefing with Mechanical Shop Personnel on Event,Stressing Need to Review & Comply W/All Procedural Prerequisites + (ML17292B427)
- ML17292B428 + (ML17292B428)
- IR 05000397/1998012 + (ML17292B430)
- ML17292B431 + (ML17292B431)
- ML17292B433 + (ML17292B433)
- IR 05000397/1998014 + (ML17292B434)
- ML17292B435 + (ML17292B435)
- GO2-98-154, Forwards Response to Violations Noted in Insp Rept 50-397/98-14.Corrective Actions:Individuals Involved in Emergency Plan Rev Process Counseled Re Need to Ensure Emergency Plan Meets Requirements of 10CFR50 App E + (ML17292B437)
- IR 05000397/1998001 + (ML17292B441)
- 05000397/LER-1998-012, :on 980715,failure to Comply with Requirements of TS SR 3.8.4.7 Was Noted.Caused by Inadequate Work Practices.Training Session Was Held with Personnel.With + (ML17292B445)
- ML17292B449 + (ML17292B449)
- ML17292B452 + (ML17292B452)
- ML17292B453 + (ML17292B453)
- GO2-98-208, Submits Guarantee of Payment of Deferred Premium in Compliance with 10CFR140.21 + (ML17292B471)
- GO2-98-207, Provides Supplemental Info & Clarification of Proposed Rev 29 to Operational QA Program Description Submitted in + (ML17292B476)
- GO2-98-213, Forwards Addl Info Re Weld Examination Including Analytical Evaluation of Examination Results for Indication as Required by Subsection IWB-3134(b) of ASME Section XI,1989 Edition + (ML17292B478)
- GO2-98-211, Washington Public Power Supply Sys 1998 Annual Rept. with + (ML17292B479)
- ML17292B480 + (ML17292B480)
- ML17292B482 + (ML17292B482)
- ML17292B484 + (ML17292B484)
- GO2-98-215, Application for Amend to License NPF-21,revising TS SR 3.8.1.8 to Allow for Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 + (ML17292B486)
- ML17292B487 + (ML17292B487)
- ML17292B488 + (ML17292B488)
- ML17292B489 + (ML17292B489)
- ML17292B491 + (ML17292B491)
- ML17292B492 + (ML17292B492)
- ML17292B494 + (ML17292B494)
- IR 05000397/1998022 + (ML17292B495)
- GO2-98-216, Responds to NRC Re Violations Noted in Insp Rept 50-397/98-20.Corrective Actions:Implemented Interim Actions to Assure That Significant Pressure Surges Do Not Occur in Plant Fire Protection Sys + (ML17292B496)
- GO2-98-214, Forwards Plant Simulation Facility Four Year Rept,Per 10CFR55.45(b)(5)(ii) + (ML17292B497)
- IR 05000397/1998099 + (ML17292B498)
- ML17292B500 + (ML17292B500)
- IR 05000397/1998015 + (ML17292B502)
- ML17292B504 + (ML17292B504)
- ML17292B506 + (ML17292B506)
- ML17292B507 + (ML17292B507)
- ML17292B509 + (ML17292B509)
- ML17292B511 + (ML17292B511)
- GO2-98-219, Requests Change to Confirmatory Order Which Modified WNP-2 OL to Reflect Schedule for Implementing Thermo-Lag 330-1 Fire Barrier Corrective Actions,Per GL 92-08 + (ML17292B518)
- ML17292B525 + (ML17292B525)
- ML17292B528 + (ML17292B528)
- ML17292B530 + (ML17292B530)
- ML17292B531 + (ML17292B531)
- LD-99-003, Part 21 Rept Re XL-S96 CPR Correlation for SVEA-96 Fuel. Defect Applies Only to WNP-2,during Cycles 12,13 & 14 Operation.Evaluations of Defect Performed by ABB-CE + (ML17292B533)
- LD-99-002, Part 21 Rept Re Incorrect Modeling of BWR Lower Plenum Vol in Bison.Defect Applies Only to Reload Fuel Assemblies Currently in Operation at WNP-2.BISON Code Model for WNP-2 Has Been Revised to Correct Error + (ML17292B534)
- GO2-99-006, Monthly Operating Rept for Dec 1998 for WNP-2.With + (ML17292B535)
- GO2-99-012, Informs That Go Smith Has Been Appointed Vice President, Generation/Plant General Manager.Updated Distribution List for NRC Correspondence,Encl + (ML17292B536)