Forwards Safety Evaluation Re Rev 29 to Operational Quality Assurance Program
ML17292B489
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/21/1998
From: Poslusny C
NRC (Affiliation Not Assigned)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17292B490 List:
References
TAC-MA3980, NUDOCS 9812300027
Download: ML17292B489 (4)


Text

~ P Mr. J. V. Parrish Chief Executive Officer Washington Public Power Supply System P.O. Box 968 (Mail Drop 1023)

Richland, Washington 99352-0968

SUBJECT:

REVISION 29 TO THE OPERATIONALQUALITYASSURANCE PROGRAM FOR WNP-2 (TAC NO. MA3980)

Dear Mr. Parrish By letter dated October 23, 1998, Washington. Public Power Supply System (WPPSS) submitted proposed Revision 29 to the Operational Quality Assurance Program Description (OQAPD) in accordance with 10 CFR 50.54(a).

Conference calls between the NRC and WPPSS staffs were held on November 19, 1998 and November 23, 1998, to discuss these changes.

By letter dated December 9, 1998, WPPSS submitted supplementary information

'nd revised OQAPD pages to address the NRC questions.

The NRC staff has reviewed the submittals in accordance with 10 CFR 50.54(a) and determined that the changes to the OQAPD are acceptable in that the quality assurance program continues to meet the requirements of Appendix B of 10 CFR Part 50. The staff's safety evaluation is provided as an enclosure to this letter. Ifthere are changes to other previously agreed to and docketed commitments outside the quality assurance program description, you are obligated to revise those commitments in accordance with the governing change control process and notify the NRC as appro'priate.

The effectiveness of your quality assurance program implementation'will continue to be the subject of routine NRC inspections.

Ifyou have any questions'egarding the quality assurance program review, please contact me at (301) 415-1341.

1 Sincerely, Original Signed By Chet Poslusny, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-397

Enclosure:

Safety Evaluation cc w/encl: See next page Document N e: WNPQA.WPD DISTR I BUTION FDocket.:

.8 PUBLIC PDIV-2 Reading E. Adensam W. Bateman C. Poslusny E. Peyton OGC ACRS P. Gwynn, Region IV P. Harrell, Region IV S. Black R. Smith I

Q> f>+'I /

OFC NAME DATE P

-2 CPoslusn 12 /

/98 PDIV-2 MeMtn 12 WI/98 t% Q g J

'~i/

OFFICIALRECORD COPY

'P8i2300027 98i22i PDR ADOCK 050003'P7 HC RK&5~NPV

fr I

l' H

~ ~ il Mr. J. V. Parrish December 21, 1998 cc w/encl:

Mr.'Greg O. Smith (Mail Drop 927M)

WNP-2 Plant General Manager Washington Public Power Supply System P. O. Box 968 Richland, Washington 99352-0968 Mr. Albert E. Mouncer (Mail Drop 1396)

Chief Counsel Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Ms. Deborah J. Ross, Chairman Energy Facility Site Evaluation Council P. O. Box 43172 Olympia, Washington 98504-3172 Mr. D. W. Coleman (Mail Drop PE20)

Regulatory Affairs Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Paul Inserra (Mail Drop PE20)

Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower 8 Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Chairman Benton County Board of Commissioners P.O. Box 69 Prosser, Washington 99350-0190 Mr. Scott Boynton, Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 69 Richland, Washington 99352-0968 Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support/PIO Washington Public Power Supply System P. O. Box 968 Richland, Washington 99352 Perry D. Robinson, Esq.

Winston 8 Strawn 1400 L Street, N.W.

Washington, DC 20005-3502

~

~

~ ~