Forwards Insp Rept 50-397/98-22 on 981011-1121 & Notice of Violation
ML17292B492
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/21/1998
From: Greg Pick
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17292B493 List:
References
50-397-98-22, NUDOCS 9812300031
Download: ML17292B492 (10)


See also: IR 05000397/1998022

Text

mTEGoRY

2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

i ESSXON NBR:9812300031

DOC.DATE: 98/12/21

NOTARIZED: NO

DOCKET ¹

FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe

05000397

AUTH.NAME

AUTHOR AFFILIATION

PICK,G.A.

Region

4 (Post

820201)

RECXP.NAME

RECIPIENT AFFILIATION

PARRISH,J.V.

Washington Public Power Supply System

SUBJECT: Forwards insp rept 50-397/98-22

on 981011-1121

6 notice of

violation.

...,.........., ...,...........,. /..../

...., Kr

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

E

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

AEO

LE CE

ER

R DRPM PECB

NUDOCS-ABSTRACT

OGC/HDS3

ERNAL: LITCO BRYCE,J H

NRC PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

'1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

XD CODE/NAME

POSLUSNY,C

AEOD/SPD/RAB

DEDRO

NRR/DRCH/HOHB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

NOAC

NUDOCS, FULLTEXT

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

R

D

0

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES

RECE1VED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED-

LTTR

19

ENCL

19

~ \\

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

6I: RYAN PLAZA DRIVE. SUITE 400

ARLINGTON,TEXAS 760I I 6064

u"L'

t

Mr. J. V. Parrish (Mail Drop 1023)

Chief Executive Officer

Washington Public Power Supply System

P.O. Box 968

'Richland, Washington

99352-0968

SUBJECT: NRC INSPECTION REPORT 50-397/98-22 AND NOTICE OF VIOLATION

Dear Mr. Parrish:

From October 11 through November 21, 1998, an inspection was conducted at your

Washington Nuclear Project-2 reactor facility. The enclosed report presents the scope and

results of that inspection.

During this period, three violations of NRC requirements were identified. Two of the violations

w'ere for the failure to followprocedures and one violation for inadequate procedure.

The first

violation resulted from a failure by control room operators to log the specific out of service times

for both trains of standby gas treatment system during testing, as required by plant procedures.

The second violation had two examples of a failure of maintenance personnel to perform testing

of standby gas treatment charcoal filters as required by procedures.

The third violation resulted

because your test procedure failed to ensure that an effective functional test of the charcoal

was conducted to demonstrate the system performed as designed.

The NRC has concluded that information regarding the reason for the violations and the

corrective actions taken and planned to correct the violations and prevent recurrence is already

adequately addressed

on the docket in the enclosed inspection report. Therefore, you are not

required to respond to this letter unless the description therein does not accurately reflect your

corrective actions or your position.

In that case, or if you choose to provide additional

information, you should followthe instructions specified in the enclosed Notice.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosures,

and your response willbe placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we willbe pleased to discuss them

.with you.

Sincerely,

0--Lc. P~,

G. A. ', Acting Chief

Project Branch E

Division of Reactor Projects

98i230003i 98i22i

PDR

ADOCK 05000397

8

PDR

0

Washington Public Power Supply System

-2-

Docket No.:

50;397

License No.:

NPF-21

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

50-397/98-22

cc w/enclosures:

Chairman

Energy Facility Site Evaluation Council

P.O. Box 43172

Olympia, Washington

98504-3172

Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support/PIO

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr, Greg O. Smith (Mail Drop 927M)

WNP-2 Plant General Manager

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. D. W. Coleman (Mail Drop PE20)

Manager, Regulatory Affairs

Washington Public Power Supply, System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Albert E. Mouncer (Mail Drop 396)

Chief Counsel

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968,

Mr. Paul Inserra (Mail Drop PE20)

Manager, Licensing

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

0

Washington Public Power Supply System

-3-

Perry D. Robinson, Esq.

Winston & Strawn

1400 L Street, N.W.

Washington, D.C. 20005-3502

,8

'

Washington Public Power Supply System -3-'C('

I

r'"-~6

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: R:i WN25WN822RP.SAB

To receive co

of document. Indicate In box: "C" ~ Co

without enclosures

E" ~ Co

with enclosures "N" ~ No co

RIV:RI

SRI

AC:DRP

JES

ts

12/ i

/98

SABo nto 'APick

12/! 7/98

12/

/98

OFFICIALRECORD COPY

Washington Public Power Supply System

-3-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK),

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: R:QWN25WN822RP.SAB

To receive co

of document, Indicate ln box: "C" = Co

without enclosures

"E" = Co

with enclosures "N ~ No co

RIV:RI

JES

ts

12/ I

/98

SRI

SABo nto

12/ /7/98

AC:DRP

GAPick

12/

/98

OFFICIALRECORD COPY