ML17292B428

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/98-12 on 980713-17.No Violations Noted.Insp Included Portions of Physical Security Program
ML17292B428
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/31/1998
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17292B429 List:
References
50-397-98-12, NUDOCS 9808060017
Download: ML17292B428 (8)


See also: IR 05000397/1998012

Text

CATEGORY

2

REGULATORY INFORMATION DISTRIBUTION SYSTEM

(RIDS)

ACCESSION NBR:9808060017

DOC.DATE: 98/07/31

NOTARIZED: NO

DOCKET I

FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public

Powe

05000397

AUTH.NAME

AUTHOR AFFILIATION

MURRAY,B.

Region

4

(Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

PARRISH,J.V.

Washington Public Power Supply System

SUBJECT:

Forwards insp rept 50-397/98-12

on 980713-17.No, violations

noted.Insp

included p'ortions of physical security program.

DISTRIBUTION CODE'EOSF

COPIES

RECEIVED'LTR

~ ENCL 2

SIZE'

TITLE: Safeguards

Inspection

Rpt/NOV Response

0 DKT)-Publicly Avaz a

e

E

NOTES:

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

NRR/DRPM/PERB

NUDOCS-ABSTRACT

RGN4

FILE

01

EXTERNAL: NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

PO

ILE CE

OCS

FULLTEXT

OE DIR

NRC .PDR

" COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

0

M

E

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROI

DESK

(DCD)

ON EXTENSION 415-2083

OTAL NUMBER OF COPIES

REQUIRED:

LTTR

11

ENCL ll

0-

tp

~C

~PR RfgI

Wp0

o'<<*0<<

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE <00

ARLINGTON TEXAS 76011 8064

duly 31,

1998

Mr. J. V. Parrish (Mail Drop 1023)

Chief Executive Officer

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

SUBJECT:

NRC INSPECTION REPORT 50-397/98-12

Dear Mr. Parrish:

From July 13-17, 1998, an NRC inspection was conducted at your Washington Nuclear

Project-2 reactor facility. The enclosed report presents the scope and results of that inspection.

Areas examined during this inspection included portions of your physical security program.

We

determined that those areas inspected were being effectively implemented.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we willbe pleased to discuss them

with you.

Sincerely,

pig~~

Blaine Murray, Chief

Plant Support Branch

Division of Reactor Safety

Docket No.: 50-397

License No.: NPF-21

Enclosure:

NRC Inspection Report

50-397/98-12

98080600i7 98073i

PDR

ADQCK 05000397

8

PDR

Washington Public Power Supply System

-2-

CC:

Chairman

Energy Facility Site Evaluation Council

P.O. Box 43172

Olympia, Washington

98504-3172

Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support/PIO

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Greg O. Smith (Mail Drop 927M)

WNP-2 Plant General Manager

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. D. W. Coleman (Mail Drop PE20)

Manager, Regulatory Affairs

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Albert E. Mouncer (Mail Drop 396)

Chief Counsel

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Paul Inserra (Mail Drop PE20)

Manager, Licensing

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Perry D. Robinson, Esq.

Winston 8 Strawn

1400 L Street, N.W.

Washington, D.C. 20005-3502

Washington Public Power Supply System

-3-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

0

bcc to DCD (IE04)

Regional Administrator

WNP-2 Resident Inspector

DRS Director

DRS Deputy Director

DRP Director

DRS-PSB

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

Elaine Koup NRR/DRPM/SGB (MS: OWFN 11E-22)

Ellen Poteat, OCFO/LFARB, (MS: TWFN 9E-10)

WCFO File

MIS System

RIV File

RIV:PSB

E

C:DRP)E

C:DRS>PSB

DOCUMENT NAME: R:5

N2 REPORTS)WN812RP.TWD

o receive copy of document, indicate in box: "C" = Copy without enctosures

"E" = Copy with enctosures "N" "- No cop

g1

TWDexter:nh

/g /98

HJWong

/98

BMurray

/ W/98

OFFICIAL RECORD COPY

Washington Public Power Supply System

-3-

E-Mail report to T.,Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

tl'cc

to DCD (IE04)

Regional Administrator

WNP-2 Resident Inspector

DRS Director

DRS Deputy Director

DRP Director

DRS-PSB

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

Elaine Koup NRR/DRPM/SGB (MS: OWFN 11E-22)

Ellen Poteat, OCFO/LFARB, (MS: TWFN 9E-10)

WCFO File

MIS System

RIV File

C:DRPtE

RIV:PSB

C:DRSiPSB

DOCUMENT NAME: R:5

N2 REPORTS(WN812RP.TWD

o receive co y of document, Indicate in box: "C"-"Cop without enclosures

"E" = Cop

with enclosures

"N"= No copy

E

TWDexter:nh

/

/98

HJWong

8Murray

/98

/

/98

OFFICIALRECORD COPY