ML17292B428
| ML17292B428 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 07/31/1998 |
| From: | Murray B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17292B429 | List: |
| References | |
| 50-397-98-12, NUDOCS 9808060017 | |
| Download: ML17292B428 (8) | |
See also: IR 05000397/1998012
Text
CATEGORY
2
REGULATORY INFORMATION DISTRIBUTION SYSTEM
(RIDS)
ACCESSION NBR:9808060017
DOC.DATE: 98/07/31
NOTARIZED: NO
DOCKET I
FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public
Powe
05000397
AUTH.NAME
AUTHOR AFFILIATION
MURRAY,B.
Region
4
(Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
PARRISH,J.V.
Washington Public Power Supply System
SUBJECT:
Forwards insp rept 50-397/98-12
on 980713-17.No, violations
noted.Insp
included p'ortions of physical security program.
DISTRIBUTION CODE'EOSF
COPIES
RECEIVED'LTR
~ ENCL 2
SIZE'
TITLE: Safeguards
Inspection
Rpt/NOV Response
0 DKT)-Publicly Avaz a
e
E
NOTES:
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
NRR/DRPM/PERB
NUDOCS-ABSTRACT
RGN4
FILE
01
EXTERNAL: NOAC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
PO
ILE CE
OCS
FULLTEXT
OE DIR
NRC .PDR
" COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
0
M
E
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROI
DESK
(DCD)
ON EXTENSION 415-2083
OTAL NUMBER OF COPIES
REQUIRED:
LTTR
11
ENCL ll
0-
tp
~C
~PR RfgI
Wp0
o'<<*0<<
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE <00
ARLINGTON TEXAS 76011 8064
duly 31,
1998
Mr. J. V. Parrish (Mail Drop 1023)
Chief Executive Officer
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
SUBJECT:
NRC INSPECTION REPORT 50-397/98-12
Dear Mr. Parrish:
From July 13-17, 1998, an NRC inspection was conducted at your Washington Nuclear
Project-2 reactor facility. The enclosed report presents the scope and results of that inspection.
Areas examined during this inspection included portions of your physical security program.
We
determined that those areas inspected were being effectively implemented.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we willbe pleased to discuss them
with you.
Sincerely,
pig~~
Blaine Murray, Chief
Plant Support Branch
Division of Reactor Safety
Docket No.: 50-397
License No.: NPF-21
Enclosure:
NRC Inspection Report
50-397/98-12
98080600i7 98073i
ADQCK 05000397
8
Washington Public Power Supply System
-2-
CC:
Chairman
Energy Facility Site Evaluation Council
P.O. Box 43172
Olympia, Washington
98504-3172
Mr. Rodney L. Webring (Mail Drop PE08)
Vice President, Operations Support/PIO
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Greg O. Smith (Mail Drop 927M)
WNP-2 Plant General Manager
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. D. W. Coleman (Mail Drop PE20)
Manager, Regulatory Affairs
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Albert E. Mouncer (Mail Drop 396)
Chief Counsel
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Paul Inserra (Mail Drop PE20)
Manager, Licensing
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Perry D. Robinson, Esq.
Winston 8 Strawn
1400 L Street, N.W.
Washington, D.C. 20005-3502
Washington Public Power Supply System
-3-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
0
bcc to DCD (IE04)
Regional Administrator
WNP-2 Resident Inspector
DRS Director
DRS Deputy Director
DRP Director
DRS-PSB
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
Elaine Koup NRR/DRPM/SGB (MS: OWFN 11E-22)
Ellen Poteat, OCFO/LFARB, (MS: TWFN 9E-10)
WCFO File
MIS System
RIV File
RIV:PSB
E
C:DRP)E
C:DRS>PSB
DOCUMENT NAME: R:5
N2 REPORTS)WN812RP.TWD
o receive copy of document, indicate in box: "C" = Copy without enctosures
"E" = Copy with enctosures "N" "- No cop
g1
TWDexter:nh
/g /98
HJWong
/98
BMurray
/ W/98
OFFICIAL RECORD COPY
Washington Public Power Supply System
-3-
E-Mail report to T.,Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
tl'cc
to DCD (IE04)
Regional Administrator
WNP-2 Resident Inspector
DRS Director
DRS Deputy Director
DRP Director
DRS-PSB
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
Elaine Koup NRR/DRPM/SGB (MS: OWFN 11E-22)
Ellen Poteat, OCFO/LFARB, (MS: TWFN 9E-10)
WCFO File
MIS System
RIV File
C:DRPtE
RIV:PSB
C:DRSiPSB
DOCUMENT NAME: R:5
N2 REPORTS(WN812RP.TWD
o receive co y of document, Indicate in box: "C"-"Cop without enclosures
"E" = Cop
with enclosures
"N"= No copy
E
TWDexter:nh
/
/98
HJWong
8Murray
/98
/
/98
OFFICIALRECORD COPY