ML17292B528
| ML17292B528 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 01/04/1999 |
| From: | Pellet J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17292B529 | List: |
| References | |
| 50-397-98-24, NUDOCS 9901120018 | |
| Download: ML17292B528 (10) | |
See also: IR 05000397/1998024
Text
CATEGORY 2
I
V
REGULATORY INFORMATION DISTRIBUTION SYSTEM
(RIDS)
~
~
ACCESSION NBR:9901120018
DOC.DATE: 99/01/04
NOTARIZED: NO
DOCKET I
ACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public
Powe
05000397
AUTH.NAME
AUTHOR AFFILIATION
PELLET,J.L.
Region
4 (Post
820201)
,RECIP.NAME
RECIPIENT AFFILIATION
PARRISH,J.V.
Washington Public Powe- Supply System
SUBJECT: Forwards insp rept 50-397/98-24
on 981204-10.No violations
noted.Insp
was to evaluate effectiveness
of licensed
operator requalification program.
DISTRIBUTION CODE: IE42F
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: Operator Licensing Examination Reports
NOTES:
E
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
NRR/DRCH/HOHB
EXTERNAL: NOAC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
POSLUSNY,C
I=&~
R
RGN4
FILE
01
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
0
D
0
N
NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATIONS CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
8
ENCL
8
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGIOII Iv
-;; I RYAIIPLAZAOPIV
SUITE ~00
ARLINGTON TEXAS 76011 8064
JAN -4 m99
Mr. J. V. Parrish (Mail Drop 1023)
Chief Executive Officer
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
SUBJECT:
NRC INSPECTION REPORT 50-397/98-24
Dear Mr. Parrish:
From December 4-10, 1998, an NRC inspection was conducted at your Washington Nuclear
Project-2 reactor facility. The enclosed report presents the scope and results of that inspection.
The purpose of this inspection was primarily to evaluate the effectiveness of the licensed operator
requalification program. The-inspection used the annual licensed operator requalification
examinations to assess
licensed operator performance.
The inspection also evaluated the
operations training staff in the development, administration, and evaluation of the biennial
requalification examination.
Overall, we observed good licensed operator communications during
the examination.
However, we are concerned with the generic weakness observed related to
operator control board awareness.
This issue, involving failure in monitoring key plant parameters
and systems alignment status, has been a recurring theme since the March 1998 main steam
isolation valve closure event and corrective actions taken to date appear to have been ineffective
in precluding recurrence.
We suggest that your staff review management
expectations, training,
and tools provided the operators to strengthen this area.
The operations training staff developed, administered, and evaluated the requalification
examinations professionally and accurately.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we willbe pleased to discuss them.
with you.
Sincerely,
t'ohn
L. Pellet, Chief
Operations Branch
Division of Reactor Safety
990ii200i8 990i04
ADQCK 050003'P7
8
Washington Public Power Supply System
-2-
Docket No.:
50-397
License No.:
N.F.-21
Enclosure:
NRC Inspection Report
50-397/98-24
cc w/enclosure:
Chairman
Energy Facility Site Evaluation Council
P..O. Box 43172
Olympia, Washington
98504-3172
Mr. Rodney L. Webring (Mail Drop PE08)
Vice President, Operations Support/PIO
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Greg O. Smith (Mail Drop 927M)
WNP-2 Plant General Manager
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
I'r.
D. W. Coleman (Mail Drop PE20)
Manager, Regulatory Affairs
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Albert E. Mouncer (Mail Drop 396)
Chief Counsel
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Paul Inserra (Mail Drop PE20)
Manager, Licensing
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Perry D. Robinson, Esq.
Winston & Strawn
1400 L Street, N.W.
Washington, D.C. 20005-3502
Washington Public Power Supply System
-3-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
'I
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc to DCDPR~
bcc distrib. by RIV:
Regional Administrator
DRS Director
DRP Director
Branch Chief (DRP/E)
Senior Project Inspector (DRP/E)
Branch Chief (DRP/TSS)
Resident Inspector
DRS Deputy Director
DRS-PSB
MIS System
RIV File
V~~Iaft
DOCUMENT NAME: R:5 WN2
N824RP.TOM
To receive co
of document, Indicate
box: "C" = Co
without enclosures
"E" = Co
with enclosures "N" = No co
RIV:RE:OB
E
RE:
E
C:OB
E ':DRPtE
E
C:OB ~
TOMcKern
/9
RELantz
12/ /98
12/ 98
12K/98
OFFICIAL RECORD COPY
JLPellet,'APick
. (g
JLPe e
/98
Washington Public Power Supply System
-3-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc to DCD (IE01)
bcc distrib. by RIV
Regional Administrator
DRS Director
DRP Director
Branch Chief (DRP/E)
Senior Project Inspector (DRP/E)
Branch Chief (DRP/TSS)
Resident Inspector
DRS Deputy Director
DRS-PSB
MIS System
RIV File
P ~iltk
DOCUMENT NAME: RA WN2
N824RP.TOM
To receive co
of document, indicate
box: "C" ~ Co
without enclosures
"E ~ Co
with enclosures
N ~ No co
RIV:RE:OB
E
RE:
E
C:OB
E
C:DRP'tE
E
C:OB
TOMcKern
/9
RELantz
12/'98
GAPick
Ih
1
/98
JLPellet
1
98
OFFICIALRECORD COPY
JLPe
e
98