Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17284A653 + (ML17284A653)
- GO2-98-092, Withdraws 970716 Request for Amend to TS Re Vessel Leak Testing,Based Upon Commitment Contained in Util Concerning Surveillance Matls Testing & Analysis Rept + (ML17284A654)
- 05000397/LER-1998-005, :on 980506,potential for Failure of RHR Sys Valve to Close on Isolation Signal Was Noted.Caused by Design Deficiency.Caution Tag Was Placed on RHR-V-40 Control Switch to Inform Plant Operators of Limitation + (ML17284A655)
- ML17284A656 + (ML17284A656)
- PNO-IV-98-026A, on 980617,update to Internal Flooding Caused by Fire Water Sys Valve Rupture & Arrival of Augmented Insp Team Made.Team Provided Charter Which Will Be Placed in Pdr. Licensee Completed Dewatering Each of ECC Pump Rooms + (ML17284A657)
- PNO-IV-98-026B, on 980617,AIT Activities for Internal Flooding Caused by Fire Water Sys Valve Rupture & Termination of NOUE Update Made.Operation of Pumps Resulted in Rapid Reflood of Reactor Bldg Risers & Water Hammer + (ML17284A658)
- GO2-98-101, Provides Requested 30 Day Rept Re Insp of Reactor Core Shroud Welds for Indications of Stress Corrosion Cracking. Shroud Insp Requested by Has Been Completed + (ML17284A659)
- ML17284A660 + (ML17284A660)
- ML17284A662 + (ML17284A662)
- 05000397/LER-1998-008, :on 980531,inadvertent Full Scram During RPV Leak Testing in Mode 4 Was Noted.Caused by Change in Mgt Techniques.Revised Procedures to Take Into Account Addl Water Head in Pressure Sensing Lines + (ML17284A664)
- 05000397/LER-1998-007, :on 980530,inadvertent Full Scram & Division 1 ECCS Injection Was Noted.Caused by Failure to Meet Mgt Work Practice Expectation When Encountering Deficient Procedure. Incident Review Board Convened to Review Event + (ML17284A665)
- ML17284A666 + (ML17284A666)
- GO2-98-107, Informs That DW Coleman Has Been Appointed Regulatory Affairs Manager & Records Should Be Corrected to Reflect Change + (ML17284A667)
- ML17284A668 + (ML17284A668)
- ML17284A669 + (ML17284A669)
- ML17284A670 + (ML17284A670)
- ML17284A671 + (ML17284A671)
- GO2-98-108, Submits Response to NRC Bulletin 96-03, Potential Plugging of ECC Suction Strainers by Debris in Bwrs. Vacuuming of Suppression Pool Scheduled During 1999 Refueling Outage. Licensee Maintains Foreign Matl Control Program + (ML17284A672)
- 05000397/LER-1998-009, :on 980606,nuclear Steam Supply Shutoff Sys Group 3 & 4 Isolations During Testing Was Noted.Caused by Procedural Deficiency.Counseled Individuals Involved in Preparation + (ML17284A673)
- GO2-98-111, Ro:On 980617,flooding of RB Northeast Stairwell with Consequential Flooding of Two ECCS Pump Rooms.Caused by Inadequate Fire Protection Sys Design.Pumped Out Water from Affected Areas to Point Below Berm Areas of Pump Rooms + (ML17284A675)
- ML17284A676 + (ML17284A676)
- ML17284A678 + (ML17284A678)
- ML17284A679 + (ML17284A679)
- GO2-98-117, Provides Addl Perspective on Apparent Violation Noted in Insp Rept 50-397/98-01.Clearer Understanding of Issue Has Been Provided by Addl Testing & Analysis by Siemens Power Corp + (ML17284A680)
- IR 05000597/1998007 + (ML17284A681)
- ML17284A682 + (ML17284A682)
- IR 05000397/1998017 + (ML17284A684)
- GO2-98-121, Provides Addl Info Concerning 9.5 Plate Section W/Regards to Current WNP-2 P/T Limit Curves + (ML17284A686)
- GO2-98-119, Monthly Operating Rept for June 1998 for WNP-2 + (ML17284A687)
- ML17284A688 + (ML17284A688)
- ML17284A689 + (ML17284A689)
- IR 05000397/1998008 + (ML17284A691)
- ML17284A692 + (ML17284A692)
- ML17284A694 + (ML17284A694)
- 05000397/LER-1998-011, :on 980617,ECCS Pump Room Flooding Was Noted Due to FP Sys Pipe Break.Caused by Inadequate Design of FP Sys.Detailed Review of FP Sys Design Was Conducted + (ML17284A695)
- 05000397/LER-1998-010, :on 980615,TS Required Shutdown Due to Inoperability of TIP Sys Isolation Valve Was Noted.Caused by Improper Installation of TIP Tubing.Reattached Affected Tubing & Inspected Other TIP Tubing + (ML17284A696)
- GO2-98-125, Requests Enforcement Discretion from TS Surveillance Requirement 3.8.4.7 for One Time Exemption for Completion of Battery Svc Test for Division 2,125 Vdc,Battery E-B1-2.TS Amend Request Is Being Submitted Under Separate Cover + (ML17284A697)
- GO2-98-122, Forwards Copy of Scenario Package for Supply Syss 1998 NRC Graded Exercise to Be Conducted on 980916.Util Requests That NRC Review & Provide Comments No Later than 45 Days Prior to Exercise + (ML17284A699)
- ML17284A700 + (ML17284A700)
- ML17284A702 + (ML17284A702)
- ML17284A704 + (ML17284A704)
- GO2-98-128, Application for Exigent Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc, Battery E-B1-2 + (ML17284A705)
- ML17284A706 + (ML17284A706)
- ML17284A707 + (ML17284A707)
- ML17284A708 + (ML17284A708)
- 05000397/LER-1998-006-01, Forwards LER 98-006-01,discussing Results of Root Cause Analysis & Addl Corrective Actions Taken to Rectify Deficiencies in Wnp,Unit 2,10CFR50,App R High Impedance Fault Calculations + (ML17284A710)
- ML17284A711 + (ML17284A711)
- 05000397/LER-1998-006, :on 980520,discovered Discrepancies in Low Voltage Bus Calculations During Review of 10CFR50,App R Calculations for High Impedance Faults.Caused by Inadequate Work Practices.Implemented Procedural Changes + (ML17284A712)
- ML17284A713 + (ML17284A713)
- GO2-98-140, Requests Review & Comments Re Scenario Package for 1998 NRC Graded Exercise to Be Conducted on 980916.Revs Were Made Following Discussion W/Good of NRC on 980622 + (ML17284A714)
- GO2-98-135, Requests That Subject TS Amend Be Processed in Exigent Fashion So as to Reasonably Minimize Time Period During Which WNP-2 Is Operating Outside of Literal Compliance W/Ts Associated W/Lco 3.8.4 + (ML17284A715)