Revised Notification of Meeting on 980702 W/Wppss in Arlington,Texas to Discuss Plant Restart Following 980617, Fire Main Break & ECCS Pump Room Flooding.Date & Time Changed from 980701 & List of Meeting Attendees Revised
ML17284A670
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/30/1998
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9807070091
Download: ML17284A670 (8)


Text

V

+p,S

AEQUI, Mp.

p 0

Cy 4t O

I 0

Iill0 cT Yg pX

+**++

UNITEDSTATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON,TEXAS 760114064 REVISION 1: TO CHANGE DATE ANDTIME OF MEETING FROM JULY 1 ANDTO REVISE LIST OF LICENSEE ATTENDEES June 30, 1998 NOTICE OF LICENSEE MEETING Name of Licensee:

Name of Facility:

Docket:

Date and Time of Meeting:

Location of Meeting:

Purpose of Meeting:

NRC Attendees:

Licensee Attendees:

Washington Public Power Supply System Washington Nuclear Project, Unit 2 50-397 July 2, 1998 8 a.m. (CDT)

Region IV office, Arlington, Texas 4th Floor Training Conference Room Discussion of Plant Restart Following June 17, 1998, Fire Main Break and ECCS Pump Room Flooding E. W. Merschoff, Regional Administrator T. P. Gwynn, Director, Division of Reactor Projects (DRP)

A. T. Howell, III, Director,'Division of Reactor Safety (DRS)

W. H. Bateman, Director, Project Directorate PD-IV-2, NRR D. F. Kirsch, Acting Director, Walnut Creek Field Office J. L. Shackelford, Senior Reactor Analyst, DRS S. A. Boynton, Senior Resident Inspector J. W. Clifford, Senior Project Manager, NRR J. V. Parrish, Chief Executive Officer P. R. Bemis, Vice President, Nuclear Operations R. L. Webring, Vice President, Operations Support/PIO J. P. Kane, Engineering General Manager D. K. Atkinson, Manager, Quality Assurance D. W. Coleman, Manager Regulatory Affairs S. D. Wood, System Engineering Supervisor D. B. Kobus, Fire Protection Supervisor T. L. Meade, Assistant to Plant General Manager 980707009%

'F80680 pop soocx osooosvr P

PDR

Washington Public Power Supply System NOTE:

(1)

This meeting is open to attendance by members of the general public.

(2)

NRC personnel, not listed above, that desire to attend this meeting should notify Gary Johnston at (925) 975-0304 by COB on June 29, 1998.

Approved y

Thomas P. Gwy n, Dir or Division of Reac r P j

ts CC:

Mr. J. V. Parrish (Mail Drop 1023)

Chief Executive Officer Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, Washington 98504-3172 Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support/PIO Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Greg O. Smith (Mail Drop 927M)

WNP-2 Plant General Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. D. W. Coleman (Mail Drop PE20)

Manager, Regulatory Affairs Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968

Washington Public Power Supply System Mr. Albert E. Mouncer (Mail Drop 396)

Chief Counsel Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Paul Inserra (Mail Drop PE20)

Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Perry D. Robinson, Esq.

Winston 8 Strawn 1400 L Street, N.W.

Washington, D.C. 20005-3502

Washington Public Power Supply System JN 30

)998 gJgajQo

(

)

PMNS JKR PAB FJM BWS BAB2 CXP1 OEMAIL LJC SXB1 CAH DMK1 GFS BWH JAC1, CJG LAT, DLF, JES4 CLG, LMB, NLH CMS, CAM3, WSW LSO LPL

FOIO, NRC Attendees Mtg Announcement Coordinator DEDE DEDR A/D/NRR Acting, ADT/NRR Acting ADP/NRR Project Manager, NRR D/OE OGC Senior Resident Inspector C. A. Hackney, RSLO D. M. Kunihiro, WCFO G. F. Sanborn, EO B. Henderson, PAO RA Secretaries DRP Division DRS Division DNMS Division L. Ousley P. Longdo cc:

DMB (IE 45)

OEDO RIV Coordinator (16E15)

ORA File RIV File DOCUMENT NAME: R:h WN2(WN7-2MN.DRP To receive cop of document, Indicate in box: "C" = Cop without enciosures,"E" = Cop with enciosures "N"= No cop RIV:C:DRP/E HJWong;df 6/30/98 (GWJ)

D:D TH e

6/ 0/98 RSLO PAO BWHenderson 6

/98'AHackney 6/

/98 OFFICIALRECORD COPY D:DRP TP wynn 6

/98

Washington PUblic Power Supply System JUN 30 l998 F~ail To'

)

PMNS JKR PAB FJM BWS BAB2 CXP1

'EMAIL LJC SXB1 CAH DMK1 GFS BWH JAC1, CJG LAT, DLF, JES4 CLG, LMB, NLH CMS, CAM3, WSW LSO LPL

~FO NRC Attendees Mtg Announcement Coordinator DEDE DEDR A/D/NRR Acting, ADT/NRR Acting ADP/NRR Project Manager, NRR D/OE OGC Senior Resident Inspector C. A. Hackney, RSLO D. M. Kunihiro, WCFO G. F. Sanborn, EO B. Henderson, PAO RA Secretaries DRP Division DRS Division DNMS Division L. Ousley P. Longdo cc:

OEDO RIVCoordinator (16E15)

ORA File RIV File DOCUMENT NAME: R:i WN2iWN7-2MN.DRP To receive copy of document, indicate in box: "C" = Cop without enciosures "E" = Copy with enciosures "N"= No copy RIV:C:DRP/E HJWong;df 6/30/98 (GWJ)

D:D TH e

6/ 0/98 PAO RSLO 6/5'98 6

/98 OFFICIAL RECORD COPY BWHenderson CAHackney D:DRP TP wynn 6/

/98 4