UNITEDSTATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZADRIVE, SUITE 400 ARLINGTON,TEXAS 7601141064 June 26, 1998 NOTICE OF LICENSEE MEETING Name of Licensee:
Name of Facility:
Docket:
Date and Time of Meeting:
Location of Meeting:
Purpose of Meeting:
NRC Attendees:
Licensee Attendees:
Washington Public Power Supply System Washington Nuclear Project, Unit 2 50-397 July 1, 1998 8:30 a.m. (CDT)
~ Region IVoffice, Training Conference Room, Arlington, Texas Discussion of Plant Restart Following June 17, 1998, Fire Main Break and ECCS Pump Room Flooding E. W. Merschoff, Regional Administrator.
T. P. Gwynn, Director, Division of Reactor Projects (DRP)
A. T. Howell, III, Director, Division of Reactor Safety (DRS)
W. H. Bateman, Director, Project Directorate PD-IV-2, NRR D. F. Kirsch, Acting Director, Walnut Creek Field Office J. L. Shackelford, Senior Reactor Analyst, DRS S. A. Boynton, Senior Resident Inspector J. W. Clifford, Senior Project Manager, NRR J. V. Parrish, Chief Executive Officer P. R. Bemis, Vice President, Nuclear Operations R. L. Webring, Vice President, Operations Support/PIO J. P. Kane, Engineering General Manager D. K. Atkinson, Manager, Quality Assurance J. D. MacDonald, Planning, Scheduling and Outage Manager D. W. Coleman, Manager Regulatory Affairs S. D. Wood, System Engineering Supervisor NOTE:
(1)
This meeting is open to attendance by members of the general public.
(2)
NRC personnel, not listed above, that desire to attend this meeting should notify Gary Johnston at (925) 975-0304, by COB on June 29, 1998.
I Approved By; omas P.
wynn, Director Division of Reactor Projects 9807020359 980626 PDR ADCICK 05000397 P
i
Washington Public Power Supply System 'CC:
Mr. J. V. Parrish (Mail Drop 1023)
Chief Executive Officer Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, Washington 98504-3172 Mr. Rodney L. Webring (Mail Drop PE08)
Vice President, Operations Support/PIO Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Greg O. Smith (Mail Drop 927M)
WNP-2 Plant General Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. D. W. Coleman (Mail Drop PE20)
Manager, Regulatory Affairs Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Albert E. Mouncer (Mail Drop 396)
Chief Counsel Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Paul Inserra (Mail Drop PE20)
Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968
Washington Public Power Supply System Perry D. Robinson, Esq.
Winston 8 Strawn 1400 L Street, N.W.
Washington, D.C. 20005-3502
Washington Public Power Supply System JUN 26 l998
~E-il To'
)
PMNS JKR PAB FJM BWS BAB2 CXP1 OE MAIL LJC SXB1 CAH DMK1 GFS BWH KEP JAC1, CJG LAT, DLF, JES4 CLG, LMB, NLH CMS, CAM3, WSW LSO LPL
~O NRC Attendees Mtg Announcement Coordinator DEDE DEDR A/D/NRR Acting, ADT/NRR Acting ADP/NRR Project Manager, NRR D/OE OGC Senior Resident Inspector C. A. Hackney, RSLO D. M. Kunihiro, WCFO G. F. Sanborn, EO'.
Henderson, PAO K. Perkins, Director, WCFO RA Secretaries DRP Division DRS Division DNMS Division L. Ousley P. Longdo cc:
DMB (IE 45)
OEDO RIV Coordinator (16E15)
ORA File RIV File DOCUMENT NAME: R:7 WN2(WNP7-1MN.DRP To receive copy of document, indicate fn box: "C"-"Copy without enctosures "E" = Copy with enctosures "N" = No cop RIV:C:DRP/E HJWong tt'4>
06/If/98 D:DR AT 06 98 PAO RSLO D:DRP 0
98
/98 OFFICIALRECORD COPY 06/<498 BWHe n
CAHa y M TPGwynn
Washington Public Power Supply System JUN 26 l998
~Mail T
(
)
PMNS JKR PAB FJM
, BWS BAB2 CXP1 OEMAIL LJC SXB1 CAH DMKI GFS BWH KEP JAC1
~ CJG LAT, DLF, JES4 CLG, LMB, NLH CMS, CAM3, WSW LSO LPL
~FO NRC Attendees Mtg Announcement Coordinator DEDE DEDR A/D/NRR Acting, ADT/NRR Acting ADP/NRR Project Manager, NRR D/OE OGC Senior Resident Inspector C. A. Hackney, RSLO D. M. Kunihiro, WCFO G. F. Sanborn, EO B. Henderson, PAO K. Perkins, Director, WCFO RA Secretaries DRP Division DRS Division DNMS Division L. Ousley P. Longdo cc:
DMB (IE 45)
OEDO RIV Coordinator (16E15)
ORA File RIV File DOCUMENT NAME: R:3 WN2ttWNP7-1MN.DRP To receive copy of document, indicate in box: "C" = Copy without enctosures "6" = Copy with enciosures "N" = No copy RIV:C:DRP/E D:DR 06 98 06/Ir/98 HJWong
~ l/4>
AT PAO BWHe n
/98 RSLO CAHa y M 0
98 D:DRP TPGwynn
/~
06/zf/98 OFFICIALRECORD COPY pg'
~,
F