ML17284A671
| ML17284A671 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 06/30/1998 |
| From: | Howell A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 9807070194 | |
| Download: ML17284A671 (5) | |
Text
Ep+ ~~Cu (4
0 An
+o
+**++
UNITEDSTATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZADRIVE, SUITE 400 ARLINGTON,TEXAS 760114064 3une 30, 1998 NOTICE OF LICENSEE MEETING Name of Licensee:
Name of Facility:
Docket{s):
. License No.(s):
EA No.:
Date and Time of Meeting:
Washington Public Power Supply System Washington Nuclear Project, Unit 2 50-397 NP.F-21 n/a July 8 at 9:30 a.m. (PDT)
Location of Meeting Purpose of Meeting NRC Attendees Licensee Attendees:
WNP-2 Site, Plant Support Facility Auditorium Exit meeting for the Augmented Inspection Team (AIT) inspection associated with the June 17, 1998, fire main break and ECCS pump room flooding E. W. Merschoff, Regional Administrator J. L. Shackelford, Senior Reactor Analyst, Division of Reactor Safety S. A. Boynton, Senior Resident Inspector V. L. Dricks, Public Affairs Officer, OPA J. V. Parrish, Chief Executive Officer P. R. Bemis, Vice President, Nuclear Operations R. L. Webring, Vice President, Operations Support/PIO G.O. Smith, Plant General Manager J. P. Kane, Engineeri'ng General Manager D. K. Atkinson, Manager, Quality Assurance J. D. MacDonald, Planning, Scheduling and Outage Manager D. W. Coleman, Manager Regulatory Affairs S. D. Wood, System Engineering Supervisor NOTE:
(1)
This meeting is open to attendance by members of the general public.
{2)
The NRC willconduct a press conference immediately following the meeting.
(3)
NRC personnel, not listed above, that desire to attend this meeting should notify Jeffrey Shackelford by COB on July 2, 1998.
'II807070i94 9S0630 PDR ADOCK 05000397 8
PDR Approved By:
Arth T. Howell III, Director Division of Reactor Safety
Notice of Licensee Meeting CC:
Mr. J. V. Parrish (Mail Drop 1023)
Chief Executive Officer Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, Washington 98504-3172 Mr. Rodney L. Webring (Mail Drop PE08)
Vice President, Operations Support/PIO Washington Public Power Supply System P.O. Box 968 Richland, Washington 993524968 Mr. Greg O. Smith (Mail Drop 927M)
WNP-2 Plant General Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. D. W. Coleman (Mail Drop PE20)
- Manager, Regulatory Affairs Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Albert E. Mouncer (Mail Drop 396)
Chief Counsel Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Paul lnserra (Mail Drop PE20)
Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Perry D. Robinson, Esq.
Winston & Strawn 1400 L Street, N.W.
Washington, D.C. 20005-3502
Notice of Licensee Meeting E-Mail To EWM JLS2 SVB1 VLD PMNS JKR PAB FJM ACT RPZ CXP1 OEMAIL LJC SXB1 CAH DMK1 GFS BWH MFH2 KEP JAC1, CJG LAT, DLF, JES4 CLG, LMB, NLH LSO
~FO Regional Administrator Senior Reactor Analyst, DRS
'enior Resident Inspector Public Affairs Officer, OPA Mtg Announcement Coordinator DEDE DEDR A/D/NRR Acting, ADT/NRR ADP/NRR Project Manager, NRR D/OE OGC'enior Resident Inspector C. A. Hackney, RSLO D. M. Kunihiro, WCFO G. F. Sanborn, EO B. Henderson, PAO M. Hammond, PAO Ken Perkins, Director, WCFO RA Secretaries DRP Division DRS Division Linda Ousley CC:
DMB (IE 45)
OEDO RIVCoordinator (17G21)
Receptionist ORA File RIV File DOCUMENT NAME: R:tt WN2IWNSM0708.JLS To receive copy of document, indicate In box: "C" = Copy without enclosures "E" = Copy with enclosures "N"= No copy RIV SRA E
RSLO 04 i PAO D:DRS ATHo ell III 06
/98 BHenderson 06 98 06M98 06/ /98 OFFICIAL RECORD COPY JLShackelford:nh CAHackney
Notice of Licensee Meeting E-MailTo'OR EWM JLS2 SVB1 VLD PMNS JKR PAB FJM ACT RPZ CXP1 OEMAIL LJC SXB1 CAH DMK1 GFS BWH MFH2 KEP JAC1, CJG LAT, DLF, JES4 CLG, LMB, NLH LSO Regional Administrator Senior Reactor Analyst, DRS Senior Resident Inspector Public Affairs Officer, OPA Mtg Announcement Coordinator DEDE DEDR A/D/NRR Acting, ADT/NRR ADP/NRR Project Manager, NRR D/OE OGC Senior Resident inspector C. A. Hackney, RSLO D. M. Kunihiro, WCFO G. F. Sanborn, EO B. Henderson, PAO M. Hammond, PAO Ken Perkins, Director, WCFO RA Secretaries DRP Division DRS Division Linda Ousfey DMB (IE 45)
OEDO RIVCoordinator (17G21)
Receptionist ORA File RIV File DOCUMENT NAME: R:5 WN2(WNSM0708.JLS To receive copy of document, indicate in box: "C" = Copy without enctosures "E" = Copy with enciosures "N"= No copy RIV:SRA JLShackelford:nh 06/ /98 E
PAO RSLO D'DRS BHend erson 06 98 CAHackney 06M98 ATHo ell III 06
/98 OFFICIAL RECORD COPY
.4A