Forwards Insp Rept 50-397/98-09 on 980426-0606 & NOV Re Failure to Verify Temp Requirements Prior to Lifting Heavy Loads W/Reactor Bldg Overhead Crane
ML17284A676
Person / Time
Site: Columbia 
Issue date: 07/02/1998
From: Wong H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17284A677 List:
References
50-397-98-09, 50-397-98-9, NUDOCS 9807130342
Download: ML17284A676 (7)


See also: IR 05000397/1998009

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM

(RXDS)

ACCESSION NBR:9807130342

DOC.DATE:'98/07/02

NOTARIZED: NO

FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe

~

~

~

~

UTH.NAME

AUTHOR AFFILIATION

NG,H.J.

Region

4 (Post

820201)

RECIP.NAME

RECXPIENT AFFILIATION

PARRISH,J.V.

Washington Public Power Supply System

SUBJECT: Forwards insp rept 50-397/98-09

on 980426-0606

&, NOV.

Violation re failure to verify temp requirements prior to

lifting heavy loads w/reactor bldg overhead

crane.

DISTRIBUTION CODE: IE01F

COPIES

RECEXVED:LTR J

ENCL +

SIZE:

TITLE: General

.(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

DOCKET I

05000397

C

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

AEOD/TTC

NT

NRR

NUDOCS -ABSTRACT

OGC/HDS3

EXTERNAL: LITCO BRYCE, J H

NRC PDR

COPXES

LTTR ENCL

1

1

2

-

2

1

1

1

1

1

1

1

1

1

1'

1

1

1

RECIPIENT

ID CODE/NAME

POSLUSNY,C

I

AEOD/SPD/RAB

DEDRO

NRR/DRCH/HOHB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

1

1

1

1

1

1

1,1

1

'1

1

1

1

1

1

1

1

1

';G

0

E

NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED.BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED: LTTR

19

ENCL

19

~y,S RECy~

+

O

C

O

0

Cy

~I+

0

0 +**++

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 76011.8064

July 2,

1998

Mr. J. V. Parrish (Mail Drop 1023)

Chief Executive Officer

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

i

SUBJECT: NRC INSPECTION REPORT 50-397/98-09 AND NOTICE OF VIOLATION

Dear Mr. Parrish:

From April26 through June 6, 1998, an inspection was conducted at your Washington Nuclear

Project-2 reactor facility. The'inspection period captured a significant portion of activities

associated with Refueling Outage R13 and, as such, focused upon the conduct and control of

maintenance.

'The enclosed report presents the scope and results of that inspection.

Overall, outage activities.were well coordinated with generally strong safety performance in

plant operations.

However, weak procedure quality and adherence to procedures during

maintenance resulted in three separate violations of NRC requirenients.

The procedure

adherence violations included: 1) failure to verify temperature requirements prior to liftingheavy

loads with the reactor building overhead crane; 2) failure to isolate a reactor protection system

pressure switch during testing of excess flow check valves; and 3) failure to obtain an

independent verification during testing of excess flowcheck valves. A separate violation for

procedure inadequacies was also identified during testing of excess flow check valves and was

related to the establishment of and restoration from test conditions.

A fourth violation was identified when the condition of a partially elevated fuel assembly was

accepted without an adequate review of the plant's design basis.

The review would have

identified the requirement for the full insertion of the assembly in the spent fuel pool storage box

to meet the assumptions of the spent fuel pool criticality analysis. Afifthviolation was identified

when it was determined that you had decreased

the effectiveness of the WNP-2 emergency

plan by reducing the number of on-shift health physics technicians and overburdening the

l

onshift chemistry technician with health physics responsibilities in an emergency.

The violations are cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding these violations are described in detail in the enclosed report.

Please note that you

are required to respond to this letter and should followthe instructions specified in the enclosed

Notice when preparing your response.

The NRC willuse your response,

in part, to determine

whether further enforcement action is necessary to ensure compliance with regulatory

requirements.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosures,

and your response willbe placed in the NRC Public Document Room.'.

r

9807i30342 980702

PDR

ADOCK 05000897

8

POR,

Washington Public Power Supply System

-2-

Should you have any questions concerning this inspection, we willbe pleased to discuss them

with you.

Sincerely,

Docket No.:

50-397

License No.:

NPF-21

Enclosures:

Notice of Violation

2.

NRC Inspection Report

50-397/98-09

cc w/enclosures:

Chairman

Energy Facility Site Evaluation Council

P.O. Box 43172

Olympia, Washington

98504-3172

Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support/PIO

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Greg O. Smith (Mail Drop 927M)

WNP-2 Plant General Manager

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. D. W. Coleman (Mail Drop PE20)

Manager, Regulatory Affairs

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

H. J. Wong, Chief

Reactor Projects Branch E

Division of Reactor Projects

Washington Public Power Supp1y System

-3-

Mr. Albert E. Mouncer (Mail Drop 396)

Chief Counsel

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Paul Inserra (Mail Drop PE20)

Manager, Licensing

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Perry D. Robinson, Esq.

Winston 8,Strawn

1400 L Street, N.W.

Washington, D.C. 20005-3502

)

)I

0

Washington Public Power Supply System

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

'cc.to'CD (IE01):,

bcc distrib. by RIV:

. Regional Administrator

DRP Director

Branch Chief (DRP/E, WCFO)

.

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: R:5 WN2>WN809RP.SAB

To receive copy of document, indicate in box: "C" = Cop

without enciosures

"E" ~ Copy with enciosures "N"~ No

py

RIV:SRI:DRP/E

RI:DRP/E

C:DRS/PS

SABoynton

SBurton

BMurray

S PE/DRP/E

GWJohnston

C:DRP/

HJWong

07/ /98

07/ /98

07/ /98

07/ /98

OFFICIALRECORD COPY

07~8