Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML16341E751 + (ML16341E751)
- IR 05000275/1988017 + (ML16341E753)
- ML16341E757 + (ML16341E757)
- ML16341E762 + (ML16341E762)
- ML16341E774 + (ML16341E774)
- ML16341E775 + (ML16341E775)
- ML16341E783 + (ML16341E783)
- PNO-V-88-056, on 880830,Unit 1 Experienced Reactor Trip from 99% Power Due to Main Feed Pump Trip.Also,On 880901,Unit 2 Experienced Reactor Trip from 100% Power Due to Seismic Trip Signal.Incidents Under Investigation + (ML16341E787)
- ML16341E793 + (ML16341E793)
- ML16341E795 + (ML16341E795)
- ML16341E796 + (ML16341E796)
- ML16341E799 + (ML16341E799)
- ML16341E801 + (ML16341E801)
- ML16341E807 + (ML16341E807)
- IR 05000275/1988023 + (ML16341E809)
- ML16341E816 + (ML16341E816)
- ML16341E826 + (ML16341E826)
- ML16341E828 + (ML16341E828)
- ML16341E829 + (ML16341E829)
- ML16341E831 + (ML16341E831)
- ML16341E833 + (ML16341E833)
- ML16341E834 + (ML16341E834)
- ML16341E836 + (ML16341E836)
- ML16341E837 + (ML16341E837)
- ML16341E844 + (ML16341E844)
- ML16341E845 + (ML16341E845)
- ML16341E849 + (ML16341E849)
- ML16341E852 + (ML16341E852)
- ML16341E853 + (ML16341E853)
- ML16341E870 + (ML16341E870)
- ML16341E872 + (ML16341E872)
- ML16341E873 + (ML16341E873)
- ML16341E876 + (ML16341E876)
- ML16341E878 + (ML16341E878)
- IR 05000275/1988030 + (ML16341E880)
- DCL-88-290, Forwards Proprietary WCAP-12064, Diablo Canyon 1 & 2 Evaluation for Tube Vibration Induced Fatigue. All Five Tubes Requiring Corrective Action Removed from Svc During Unit 2 Refueling Outage.Rept Withheld (Ref 10CFR2.790) + (ML16341E882)
- ML16341E894 + (ML16341E894)
- IR 05000275/1988026 + (ML16341E896)
- ML16341E897 + (ML16341E897)
- IR 05000275/1988025 + (ML16341E898)
- DCL-88-296, Forwards Proprietary WCAP-11594 & Nonproprietary WCAP-11595 Westinghouse Improved Thermal Design Procedure Instrument Uncertainity Calculations for Diablo Canyon Units 1 & 2 & Application for Withholding Proprietary Info + (ML16341E900)
- ML16341E902 + (ML16341E902)
- DCL-88-303, Forwards Proprietary WCAP-11312,Rev 1 & Nonproprietary WCAP-11966, Westinghouse Owners Group Tech Spec Subcommittee Reactor Trip Breaker Maint/Surveillance Optimization.... WCAP-1312,Rev 1 Withheld (Ref 10CFR2.790) + (ML16341E904)
- ML16341E906 + (ML16341E906)
- DCL-88-302, Forwards Proprietary WCAP-12064 & Nonproprietary WCAP-12065 Repts in Support of Util Review of Steam Generator Tubing at Plant for Susceptibility to Fatigue Induced Cracking + (ML16341E907)
- ML16341E909 + (ML16341E909)
- ML16341E913 + (ML16341E913)
- ML16341E914 + (ML16341E914)
- ML16341E916 + (ML16341E916)
- ML16341E922 + (ML16341E922)
- ML16341E923 + (ML16341E923)