ML16341E751
| ML16341E751 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 08/05/1988 |
| From: | Zimmerman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16341E752 | List: |
| References | |
| NUDOCS 8808190076 | |
| Download: ML16341E751 (6) | |
See also: IR 05000275/1988017
Text
4
> ~
ACCELEMTED
DISTRIBUTION
DEMONSTRATION
SYSTEM
RECIPIENT
ID CODE/NAME
PD5
INTERNAL: ACRS
DEDRO
NRR/DLPQ/PEB 11
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
0
IEB
,J
EG
X4E
02
S
SR
DEPY
EXTERNAL: LPDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
2
2
1
4
1
1
1
1
1
1
1
2
2
1
1
RECIPIENT
ID CODE/NAME
ROOD,H
NRR MORISSEAU,D
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRXS
DXR
" 9A
NUDOCS-ABSTRACT
OGC/HDS2
RES/DSIR
DEPY
RGN5
FILE
01
NRC PDR
COPIES
LTTR ENCL
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8808190076
DOC.DATE: 88/08/05
NOTARIZED: NO
FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga
50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga
AUTH.NAME
AUTHOR AFFILIATION
ZIMMERMAN,R.P.
Region 5, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
SHIFFER,J.D.
Pacific Gas
& Electric Co.
SUBJECT:
Forwards Insp Repts 50-275/88-17
& 50-323/88-16
on
880529-0716.No violations noted.
DXSTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vi ation Response
NOTES:
DOCKET
g
05000275,
05000323
R
D
8j
A
D
D
8
I
i
A
D
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
27
ENCL
27
PlJCi
0 5
1988
Docket Nos.
50-275
and 50-323
Pacific Gas
and Electric Company
77 Beale Street,
Room 1451
San Francisco,
California 94106
Attention:
Mr. J.
D. Shiffer, Vice President
Nuclear Power Generation
Gentlemen:
Subject:
NRC Inspection of Diablo Canyon Units 1 and
2
This refers to the
a routine inspection
conducted
by Messrs.
P.
P.
Narbut and
K.
E. Johnston
during the period of May 29 through July 16,
1988.
This
inspection
examined your activities
as authorized
by
NRC License
Nos.
and
Additionally, the area of Configuration Management
was examined
by Mr.
D.
F. Kirsch and Mr. J.
L.
Crews
and the area of guality Assurance
was
examined
by Mr.
M.
M. Mendonca.
At the conclusion of the inspection,
discussions
of their findings were held with Mr. J.
D. Townsend,
and other
members of your staff.
Areas
examined during this inspection
are described in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
No violations of NRC requirements
were identified within the scope of this
inspection.
In accordance
with 10 CFR 2. 790 (a),
a copy of this letter and the enclosures
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
9I i~8
R.
P.
Zs
erman,
Chief
Reactor Projects
Branch
Enclosures:
Inspection
Report Nos.
50-275/88-17
and 50-323/88-16
SSOS15'0076
SSOS05
ADOCK 050002~75
O
> i<1
AUG 05
~988
cc w/enclosure:
S.
D. Skidmore,
P98E
R.
F.
Locke,
PG8E
J.
D. Townsend,
PG&E (Diablo Canyon)
D.
A. Taggert,
PG8E (Diablo Canyon)
R.
S. Weinberg,
PG8E (Diablo Canyon)
T.
L. Grebel,
PG8E (Diablo Canyon)
State of California
Sandra Silver (Report Only)
bcc w/enclosure:
docket file
Project Inspector
Resident Inspector
G.
Cook
B. Faulkenberry
J. Martin
T. Foley,
bcc w/o enclosure:
M. Smith
J. Zollicoffer
REGION V
KEJohns
PPNarbut
MMMendonca
8/H /88
8/ -'88
8/3/88
RPZimmerman
8/< /88
R
EST
COPY
7
R
VEST COPY )
R
UEST
COPY ]
R
UEST
COPY ]
ES /
NO
ES) /
NO
ES /
NO
ES /
NO
S
TO
S /
NO
0