Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML021140310 + (ML021140310)
- IR 05000259/2001005 + (ML021140311)
- ML021140316 + (ML021140316)
- ML021140317 + (ML021140317)
- ML021140320 + (ML021140320)
- ML021140321 + (ML021140321)
- ML021140324 + (ML021140324)
- ML021140326 + (ML021140326)
- DCL-02-041, Annual Technical Specification 5.6.1 Report for 2001 + (ML021140329)
- ML021140333 + (ML021140333)
- B18632, March 2002 Monthly Operating Report for Millstone Units 2 & 3 + (ML021140342)
- CPSES-200200828, Transmittal of CPSES Physical Security Plan Revision 34 + (ML021140345)
- DCL-02-040, March 2002 Monthly Operating Report for Diablo Canyon Units 1 & 2 + (ML021140347)
- L-2002-084, NEI 97-06 Steam Generator Report + (ML021140361)
- ML021140362 + (ML021140362)
- NRC-02-0013, Annual Report for 2001 + (ML021140363)
- RS-02-082, Stations Response to Request for Additional Information Re Heavy Loads Handling + (ML021140365)
- ML021140367 + (ML021140367)
- ML021140372 + (ML021140372)
- CPSES-200201164, Comanche Response to Request for Additional Information to License Amendment Request (LAR) 01-008: Revision to Technical Specification (TS) 3.3.2, ESFAS Instrumentation and 3.3.6, Containment Ventilation Isolation Instrumentation + (ML021140385)
- ML021140389 + (ML021140389)
- ML021140391 + (ML021140391)
- ML021140397 + (ML021140397)
- NG-02-0284, March 2002 Monthly Operating Report for Duane Arnold Energy Center + (ML021140399)
- ML021140400 + (ML021140400)
- ML021140405 + (ML021140405)
- ML021140413 + (ML021140413)
- ML021140423 + (ML021140423)
- ML021140425 + (ML021140425)
- ML021140426 + (ML021140426)
- ML021140431 + (ML021140431)
- ML021140435 + (ML021140435)
- ML021140439 + (ML021140439)
- ML021140484 + (ML021140484)
- ML021140504 + (ML021140504)
- ML021140558 + (ML021140558)
- DCL-02-039, Emergency Plan Implementing Procedure Update + (ML021140569)
- ML021140574 + (ML021140574)
- 05000483/LER-2002-005, Re Inaccurate Steam Generator Low-Low Level Setpoints Due to Westinghouse Design Calculation Error + (ML021140579)
- ML021140583 + (ML021140583)
- 05000483/LER-2002-004, Re Reactor Protection System Actuation While Performing Main Turbine Shell Warming in Mode 4 + (ML021140584)
- ML021140590 + (ML021140590)
- ML021140638 + (ML021140638)
- L-2002-052, 2001 Annual Radiological Environmental Operating Report + (ML021140661)
- ML021140666 + (ML021140666)
- ML021140687 + (ML021140687)
- ML021150024 + (ML021150024)
- ML021150025 + (ML021150025)
- ML021150047 + (ML021150047)
- DCL-02-042, Submittal of Proposed Changes to the DCPP Physical Security Program to Incorporate the Diablo Canyon ISFSI and Associated Request for Exemption to Four 10 CFR 73.55 Requirements + (ML021150090)
- OI 2-2001-001, EA-01-308 - NRC Office of Investigations Report 2-2001-001 Conducted on October 17, 2001. OI Investigation Was to Determine Whether Former FPC Employee at Crystal River Subjected to Discrimination + (ML021150091)