Text
North Atlantic North Atlantic Energy Service Corporation P.O. Box 300 Seabrook, NH 03874 (603) 474-9521 The Northeast Utilities System April 12, 2002 Docket No. 50-443 NYN-02040 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station March 2002 Monthly Operating Report Enclosed please find Monthly Operating Report 02-03. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of March, 2002 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
Should you require further information regarding this
- matter, please contact Mr. James M. Peschel, Manager - Regulatory Programs, at (603) 773-7194.
Very truly yours, NORTH ATLANTIC ENERGY SERVICE CORP.
Gene F. St. Pierre Station Director y/1
cc:
H. J. Miller, NRC Region I Administrator R. D. Starkey, NRC Project Manager, Project Directorate 1-2 G.T. Dentel, NRC Senior Resident Inspector
OPERATING DATA REPORT DOCKET NO.
50-443 UNIT Seabrook I DATE April 1,2002 COMPLETED BY J. L. Dalton TELEPHONE (603) 773-7025 OPERATING STATUS
- 1.
Unit Name:
Seabrook Station Unit 1
- 2.
Reporting Period:
MARCH 2002
- 3.
Licensed Thermal Power (MWt):
3411.0
- 4.
Design Electrical Rating (Net MWe):
1148.0
- 5.
Maximum Dependable Capacity (Net MWe):
1155.3
- 6.
If Changes Occur in Capacity Ratings (Items Number 3 through 5)
Not Applicable Since Last Report, Give Reasons:
This Month Yr-to-Date Cumulative
- 7.
Number of Hours Reactor Was Critical 744.0 2160.0 88663.9
- 8.
Hours Generator On-Line 744.0 2160.0 85868.7
- 9.
Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 10.
Net Electrical Energy Generated (MWH) 861616 2501401 96386933 I of 2 OPERATING
SUMMARY
The unit operated at 100% Rated Thermal Power (RTP) except for eight hours this month. Power was reduced to 97.5% RTP to facilitate testing on a Reactor Protection Temperature Channel. This yielded an availability factor of 100% and a capacity factor of 100.2% based on the MDC value of 1155.3 Net MWe.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-443 UNIT Seabrook I DATE April 1, 2002 COMPLETED BY J. L. Dalton TELEPHONE (603) 773-7025 MONTH: MARCH 2002 2 of 2 NO.
DATE TYPE' DURATION REASON 2 METHOD OF SHUTTING CAUSE / CORRECTIVE ACTIONS (HOURS)
DOWN REACTOR COMMENTS 02-01 03/2/02 S
0.0 B/F 5
Reduced power to 97.5% RTP to complete a response time testing calibration on Loop 3 Reactor Protection Temperature channel.
Operations procedures required a 2% RTP power reduction with Loops 1, 3 or 4 temperature channels in a tripped condition. This action provides margin against an inadvertent OPAT/OTAT reactor trip due to the Upper Plenum Flow Anomaly. Unit returned to full power operation the same day.
2 3
F:
Forced Reason:
Method:
S:
Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D - Regulatory Restriction 4 - Continued from previous month E - Operator Training / License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)