R E Dff A Subsidiary of RGS Energy Group, Inc.
ROCHESTER GAS AND ELECTRIC CORPORATION - 89 EAST AVENUE, ROCHESTER, N.Y 14649-0001
- 716-771-3250 www.rge.com JOSEPH A. WIDAY VICE PRESIDENT & PLANT MANAGER GINNA STATION April 11, 2002 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate I Washington, D.C. 20555
Subject:
Emergency Operating Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
As requested, enclosed are Ginna Station Emergency Operating Procedures.
Very truly yours, Widay JAW/jdw xc:
U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Ginna USNRC Senior Resident Inspector Enclosure(s):
FIG Index FIG-2.0, Rev 3
REPORT NO.
01 REPORT:
NPSP0200 DOC TYPE: PRFIG PARAMETERS:
DOC TYPES PRFIG PROCEDURE NUMBER PROCEDURE TITLE FIG-I 0
FIGURE MIN SUBCOOLING 04/12/02 PAGE:
1 GINNA NUCLEAR POWER PLANT PROCEDURES INDEX EOP FIGURE PROCEDURES STATUS:
EF QU 5 YEARS ONLY:
FIG-2.0 FIG-3.0 FIG-3.1 FIG-3.2 FIG-4.0 FIG-5.0 FIG-6.0 FIG-7.0 FIG-8.0 FIG-9.0 FIG-9. 1 FIG-10.0 FIG-11. 0 FIG-12.0 FIG-13.0 FIG-14.0 TOTAL FOR PRFIG 17 FIGURE SDM FIGURE NAT CIRC C/D WITH SHROUD FANS FIGURE NAT CIRC C/D WITHOUT SHROUD FANS FIGURE NC C/D WITH VOID IN UPPER HEAD FIGURE RCP SEAL LEAKOFF FIGURE RHR INJECTION FIGURE MIN RCS INJECTION FIGURE INTACT S/G PRESSURE FIGURE TSAT FIGURE TECH SPEC C/D FIGURE C/D LIMITS FIGURE LIMIT A FIGURE SOAK LIMITS FIGURE CNMT HYDROGEN FIGURE BACK PRESSURE FIGURE IA ISOL REV 000 003 000 001 000 002 000 000 001 000 001 000 000 000 000 000 001 EFFECT DATE 05/01/98 04/11/102 05/01/98 02/08/01 05/01/98 02/28/01 05/01/98 05/01/98 05/18/98 05/01/98 02/15/01 05/01/98 05/01/98 05/01/98 05/01/98 05/01/98 06/14/01 LAST REVIEW 05/01/98 05/01/98 05/01/98 05/01/98 05/01/98 05/01/98 05/01/98 05/01/98 05/01/98 05/01/98 05/01/98 05/01/98 05/01/98 05/01/98 05/01/98 05/01/98 05/01/98 NEXT REVIEW 05/01/03 05/01/03 05/01/03 05/01/03 05/01/03 05/01/03 05/01/03 05/01/03 05/01/03 05/01/03 05/01/03 05/01/03 05/01/03 05/01/03 05/01/03 05/01/03 05/01/03 ST EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF
Responsible Manager FIGURE SDM Date 3)
NOTE o Curve includes allowance for one stuck rod.
Add 100 ppm for each additional stuck rod.
o To obtain core burnup, use PPCS point ID BURNUP.
BORON CONCENTRATION (PPM) 1800 1600 1400 1200 1000 800 600 400 200 -
2000 4000 6000 8000 CYCLE 30 I
I 10000 12000 BURNUP (MWD/MTU) 14000 16000 18000 20000 0
I 0
I I
I