Emergency Operating Procedures
ML021140389
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/11/2002
From: Widay J
Rochester Gas & Electric Corp
To: Clark R
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML021140389 (3)


Text

R E Dff A Subsidiary of RGS Energy Group, Inc.

ROCHESTER GAS AND ELECTRIC CORPORATION - 89 EAST AVENUE, ROCHESTER, N.Y 14649-0001

  • 716-771-3250 www.rge.com JOSEPH A. WIDAY VICEPRESIDENT & PLANTMANAGER GINNA STATION April 11, 2002 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate I Washington, D.C. 20555

Subject:

Emergency Operating Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

As requested, enclosed are Ginna Station Emergency Operating Procedures.

Very truly yours, Widay JAW/jdw xc: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Ginna USNRC Senior Resident Inspector Enclosure(s):

FIG Index FIG-2.0, Rev 3

REPORT NO. 01 GINNA NUCLEAR POWER PLANT 04/12/02 PAGE: 1 REPORT: NPSP0200 PROCEDURES INDEX DOC TYPE: PRFIG EOP FIGURE PROCEDURES PARAMETERS: DOC TYPES - PRFIG STATUS: EF QU 5 YEARS ONLY:

EFFECT LAST NEXT PROCEDURE REV DATE REVIEW REVIEW ST NUMBER PROCEDURE TITLE 000 05/01/98 05/01/98 05/01/03 EF FIG-I 0 FIGURE MIN SUBCOOLING 003 04/11/102 05/01/98 05/01/03 EF FIG-2 .0 FIGURE SDM 000 05/01/98 05/01/98 05/01/03 EF FIG-3 .0 FIGURE NAT CIRC C/D WITH SHROUD FANS 001 02/08/01 05/01/98 05/01/03 EF FIG-3 .1 FIGURE NAT CIRC C/D WITHOUT SHROUD FANS 000 05/01/98 05/01/98 05/01/03 EF FIG-3.2 FIGURE NC C/D WITH VOID IN UPPER HEAD 002 02/28/01 05/01/98 05/01/03 EF FIG-4 .0 FIGURE RCP SEAL LEAKOFF 000 05/01/98 05/01/98 05/01/03 EF FIG-5.0 FIGURE RHR INJECTION FIGURE MIN RCS INJECTION 000 05/01/98 05/01/98 05/01/03 EF FIG-6 .0 001 05/18/98 05/01/98 05/01/03 EF FIG-7 .0 FIGURE INTACT S/G PRESSURE 000 05/01/98 05/01/98 05/01/03 EF FIG-8.0 FIGURE TSAT 001 02/15/01 05/01/98 05/01/03 EF FIG- 9.0 FIGURE TECH SPEC C/D 000 05/01/98 05/01/98 05/01/03 EF FIG-9. 1 FIGURE C/D LIMITS 000 05/01/98 05/01/98 05/01/03 EF FIG-10.0 FIGURE LIMIT A 000 05/01/98 05/01/98 05/01/03 EF FIG- 11. 0 FIGURE SOAK LIMITS 000 05/01/98 05/01/98 05/01/03 EF FIG-12 .0 FIGURE CNMT HYDROGEN 000 05/01/98 05/01/98 05/01/03 EF FIG-13 .0 FIGURE BACK PRESSURE 001 06/14/01 05/01/98 05/01/03 EF FIG-14 .0 FIGURE IA ISOL TOTAL FOR PRFIG 17

Responsible Manager ________ ____ ____ ____ Date _ -________

3)

FIGURE SDM NOTE o Curve includes allowance for one stuck rod. Add 100 ppm for each additional stuck rod.

o To obtain core burnup, use PPCS point ID BURNUP.

BORON CONCENTRATION (PPM) 1800 1600 1400 1200 1000 800 600 400 200 -

0 I I I I I I 0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000 CYCLE 30 BURNUP (MWD/MTU)