Other: L-PI-03-016, Response to Opportunity for Comment on Task Interface Agreement (TIA) 2001-10, Design Basis Assumptions for Ability of Prairie Island, Unit 2, Emergency Diesel Generators to Meet Single-Failure Criteria for External Events, ML013480323, ML020020074, ML020020108, ML020030002, ML020410002, ML020570514, ML021060641, ML021070317, ML021140405, ML021140426, ML021610096, ML021990405, ML022140006, ML022600292, ML023290377, ML023640310, ML031010026, ML032040412, ML050900176, ML051030051
|
MONTHYEARML0134803232002-01-0404 January 2002 Task Interface Agreement 2000-18, Design-Basis Assumptions for Non-Seismic Piping Failures at the Perry Plant Project stage: Other ML0200201082002-01-16016 January 2002 Opportunity for Comment on TIA 2001-04, Design-Basis Reliance on Non-Seismic and Non-Safety Related Equipment Project stage: Other ML0200300022002-01-16016 January 2002 Opportunity for Comment on TIA 2001-10, Design Basis Assumptions for Ability of Prairie Island, Units 2, Emergency Diesel Generators to Meet Single Failure Criteria for External Events Project stage: Other ML0200200742002-01-18018 January 2002 Opportunity for Comment on TIA 2001-02, Design Basis Assumptions for Non-Seismic Piping Failure Project stage: Other ML0204100022002-02-11011 February 2002 Report on the Status of Open TIAs Assigned to NRR Project stage: Other ML0208702382002-03-13013 March 2002 Response to Request for Additional Information (RAI) Regarding Technical Specification (TS) Change 01-10, One-Time Frequency Extension for Type a Test (Containment Integrated Leak Rate Test (Cilrt)) Project stage: Response to RAI ML0208003112002-03-18018 March 2002 Day Response to Order for Interim Safeguards Security Compensatory Measures Project stage: Request ML0210100662002-04-0909 April 2002 TSC 01-10 - TVA Response to RAI Project stage: Request ML0211404052002-04-11011 April 2002 Additional Information for Technical Specification (TS) Change 01-10, One-Time Frequency Extension for Type a Test (Containment Integrated Leak Rate Test (Cilrt)) Project stage: Other ML0210703172002-04-17017 April 2002 Memo to Raghavan from Manoly, Response to Task Interface Agreement (TIA 2001-15) for D. C. Cook, Units 1 and 2 Project stage: Other ML0210606412002-05-0101 May 2002 Task Interface Agreement (TIA) 2001-07 from Region III Regarding Quad Cities Maintenance Rule (MR) Issues Project stage: Other ML0205705142002-05-0606 May 2002 Response to Task Interface Agreement - TIA 2001-12, Licensing Bases for the Standby Liquid Control System Project stage: Other ML0212904652002-05-10010 May 2002 Meeting with Nuclear Management Company, LLC to Discuss the Aspects of Security Orders Project stage: Request ML0215504192002-05-10010 May 2002 Response to Draft NRR Position on TIA 2001-04, Design Basis Reliance on Non-Seismic and Non-Safety Related Equipment Project stage: Draft Other ML0215504132002-05-10010 May 2002 Response to Draft NRR Position on TIA 2001-02, Design Basis Assumptions for Non-Seismic Piping Failure Project stage: Draft Other ML0211404262002-05-24024 May 2002 Memo Re Response to Task Interface Agreement 2001-009 Regarding Potential Unisolable Reactor Coolant Leak Outside Containment Project stage: Other ML0509001762002-05-28028 May 2002 Fire Hazard Analysis for Fire Zone 98-J, Emergency Diesel Generator Corridor and Fire Zone 99-M, North Electrical Switchgear Room, Arkansas Nuclear One, Unit 1 Project stage: Other ML0214800332002-05-31031 May 2002 DC Cook, Units 1 & 2 - Request for Additional Information Regarding Containment Structure Conformance to Design-Basis Requirements Project stage: RAI ML0216100962002-06-11011 June 2002 Information Sent & Received by Electronic Mail Concerning Heavy Loads Request for Additional Infomration Project stage: Other 05000237/LER-2002-003, Manual Valve Failures Prevent the Cooling Water Flow to Control Room Refrigeration Condensing Unit2002-07-0808 July 2002 Manual Valve Failures Prevent the Cooling Water Flow to Control Room Refrigeration Condensing Unit Project stage: Request ML0220301902002-07-16016 July 2002 Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements Project stage: Response to RAI ML0220303702002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Verification Manual, Pages A30.1 - A56.4 Project stage: Response to RAI ML0220304002002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Verification Manual, Pages A57.1 - A80.10 Project stage: Response to RAI ML0220304152002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Engineering Report SE 99-5, Attachment 6 to AEP:NRC:2520, Pages 1 - B29.6 Project stage: Response to RAI ML0220304172002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Verification Manual, Pages A81.1 - 1.2 Project stage: Response to RAI ML0220304462002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Verification Manual, Pages B30.1 - B67.6 Project stage: Response to RAI ML0220304482002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Verification Manual, Attachment 6, Pages B68.1 - Attachment 7 Project stage: Response to RAI ML0220303342002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Attachment 5, Solvia Engineering Report SE 99-4 Project stage: Response to RAI ML0219904052002-07-18018 July 2002 Supplemental Fire Modeling for Fire Zone 98-J, Emergency Diesel Generator Corridor & Fire Zone 99-M, North Electrical Switchgear Room, Arkansas Nuclear One, Unit 1 Project stage: Other ML0224100432002-08-23023 August 2002 Supplement to Nuclear Regulatory Commission Request for Additional Information Regarding Containment Structure Conformance to Design Basis Requirements Project stage: Supplement ML0223805242002-08-23023 August 2002 License Amendment Request for One-Time Extension of Essential Service Water System Allowed Outage Time-Additional Information Project stage: Request ML0221400062002-08-29029 August 2002 Response to Task Interface Agreement (TIA 2001-02) &Tia 2001-04 Evaluation of Service Water System Design Basis Requirements Project stage: Other ML0224201372002-09-11011 September 2002 Cover Letter - Draft Response to Task Interface Agreement 2001-13 Concerning the Reactor Building Crane and Heavy Loads Project stage: Draft Other ML0226002922002-09-17017 September 2002 Memorandum Regarding Report on the Status of Open TIAs Assigned to NRR Project stage: Other ML0231000392002-11-11011 November 2002 Examples of Risk-Informed Licensing Actions for Acrs/Acnw Project stage: Request ML0236403102002-12-30030 December 2002 Opportunity for Comment on Task Interface Agreement (TIA) 2001-10, Design-Basis Assumptions for Ability of Prairie Island, Unit 2, Emergency Diesel Generators to Meet Single-Failure Criteria for External Events Project stage: Other ML0510300512003-01-13013 January 2003 Response to Task Interface Agreement (TIA 2001 -15) Regarding Evaluation of Containment Structure Conformance to Design-basis Requirements Project stage: Other ML0232903772003-01-13013 January 2003 Task Interface Agreement (TIA 2001-15) Evaluation of Containment Structure Conformance to Design-Basis Requirement Project stage: Other ML0224200972003-02-21021 February 2003 Draft - NRR Response to TIA 2001-13, Backfitting Requirements for Dresden Units 2 & 3 Reactor Building Crane Project stage: Draft Other ML0310100262003-02-21021 February 2003 NRC Response to TIA 2001-13, Backfitting Requirements for Dresden Units 2 & 3 Reactor Building Crane Project stage: Other L-PI-03-016, Response to Opportunity for Comment on Task Interface Agreement (TIA) 2001-10, Design Basis Assumptions for Ability of Prairie Island, Unit 2, Emergency Diesel Generators to Meet Single-Failure Criteria for External Events2003-04-21021 April 2003 Response to Opportunity for Comment on Task Interface Agreement (TIA) 2001-10, Design Basis Assumptions for Ability of Prairie Island, Unit 2, Emergency Diesel Generators to Meet Single-Failure Criteria for External Events Project stage: Other ML0320404122003-09-0404 September 2003 Response to TIA 2001-10, Design Basis Assumptions for Ability of Emergency Diesel Generators to Meet Single Failure Criteria for External Events Project stage: Other ML0411204872004-04-13013 April 2004 License Amendment Request to Use Yield Strength Determined from Measured Material Properties for Reinforcing Bar in Structural Calculations for Control Rod Drive Missile Shields Project stage: Request 2002-05-28
[Table View] |
Text
Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000 April 11, 2002 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN:
Document Control. Desk Washington, D.C.
20555 Gentlemen:
In the Matter of
)
Docket No.
50-328 Tennessee Valley Authority SEQUOYAH NUCLEAR PLANT (SQN)
-.. ADDITIONAL INFORMATION FOR TECHNICAL SPECIFICATION (TS)
CHANGE 01-10, "ONE-TIME FREQUENCY EXTENSION FOR TYPE A TEST (CONTAINMENT INTEGRATED LEAK RATE TESTý [CILRT])"
Reference:
- 1. _ettaer from TVA to NRC dated October 9,
- 2003, "Sequoyah Nuclear Plant
{SQN)
Unit 2 - Technical Specification (TS)
Change No.
01--0,
'One-Time Frequency Extension for Type A Test (Containment Integrated Leak Rate Test [CILRTj)'"
- 2.
Letter from TVA to the NRC dated August 31,
- 2001, "Sequoyah Nuclear Plant (SQN)
Response to Request for Additional information (RAI) Regarding Risk Informed Inservj..ce Inspection (RI-ISI) Program" This letter provides information to support NRC review and approval of the subject TS change for SQN-Unit.2.
By Reference 1, TVA requested a TS amendment.that proposed a 5--ye.ar extension to the current 1I0-year test:intervaL] for the SQN Unit 2 CILRT.
Additional information was provided by TVA's Referenced-.2.letter.
TVA's TS amendment for SQN was the. first ice.-condense.r. plant. to. submit.- {suh-Wa,reques.-
st Based o6n 'dikus's1'onb between. TVA and NRC, -t is, our.
unders*ahding thaitthe NRC°.is not ready to, approve a Printed on recycled paper
Nuclear Regulatory Commission Page 2 April 11, 2002 five-year extension for ice condenser plant design until more time is available to fully address the unique design characteristics of an ice condenser plant.
These issues are also being addressed as part of ongoing Nuclear Energy Institute efforts regarding plant CILRT interval extensions.
Based on the above discussion, TVA is requesting NRC approval to defer performance of the Unit 2 CILRT for one operating cycle (until Fall 2003).
This letter is being sent in accordance with NRC RIS 2001-05.
Please direct questions concerning this issue to me at (423) 843-7170 or J.
D.
Smith at (423) 843-6672.
Sir el Lic ng and Industry Affairs Manager scribed 4nd sworn bef *.e me on-his /
day of Nota ublic My Commission Expires:
October 9, 2002 cc: Mr.
Lawrence E.
Nanney, Director Division of Radiological Health Third Floor L&C Annex 401 Church Street Nashville, Tennessee 37243-1532