DCL-02-039, Emergency Plan Implementing Procedure Update

From kanterella
Jump to navigation Jump to search
Emergency Plan Implementing Procedure Update
ML021140569
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/12/2002
From: Becker J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
DCL-02-039, GL-81-027
Download: ML021140569 (4)


Text

Pacific Gas and Electric Company James R. Becker Diablo Canyon Power Plant Station Director Mail Code 104/5/504 P0. Box 56 Avila Beach, CA 93424 April 12, 2002 805.545.3462 Fax: 805.545.4234 PG&E Letter DCL-02-039 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Emergencv Plan Implementing Procedure Update

Dear Commissioners and Staff:

in accordance with Section V, "Implementing Procedures," of 10 CFR 50, Appendix E, enclosed is an update to the emergency plan (EP) implementing procedures for Diablo Canyon Power Plant, Units I and 2.

As provided under 10 CFR 50.54(q), the changes have been made without prior NRC approval since they do not decrease the effectiveness of the EP. The EP, as changed, continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E.

This update contains privacy/proprietary information that has been bracketed in accordance with NRC Generic Letter 81-27.

Ifthere are any questions regarding this update, please contact Mr. Mark Lemke of my staff at (805) 545-4787.

Sincerel James R. Becker A member of the STARS (Strategic Teaming and Resource Shatring) Altiance 1& 6 Cattaway

  • Comanche Peak D&ab.o Canyon
  • Palo Verde
  • South Texas Project aWolf Creek .**-

Document Control Desk PG&E Letter DCL-02-039 April 12, 2002 Page 2 kya/1345 Enclosures cc: David L. Proulx Girija S. Shukla cclenc: Ellis W. Merschoff (2)

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Cattaway e Comanche Peak o Diablo Canyon

  • Palo Verde
  • South Texas Project o WoLf Creek

Enclosure 1 PG&E Letter DCL-02-039 LOCATION OF PRIVACY/PROPRIETARY INFORMATION IN EMERGENCY PLAN IMPLEMENTING PROCEDURES FOR DIABLO CANYON POWER PLANT, UNITS I AND 2 Privacy/

Procedure Proprietary Number Information Title/Location of Privacy/Proprietary Information EP G-4 Yes Personnel Assembly, Accountability and Site Revision 18 Access Control During Emergencies Page 6 of 8 Page 1 of Attachment 7.2 EP RB-14 None Core Damage Assessment Procedure Revision 7 EP RB-15 Yes Post Accident Sampling System Revision 11 Pages 2, 8, and 10 of 12 EP EF-2 None Activation and Operation of the Operational Revision 26 Support Center

Enclosure 2 PG&E Letter DCL-02-039 DIABLO CANYON POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES Table of Contents - Emergency Plan Implementing Procedures Volume 1A (OM10.1D3 only), Volume 1B (OMI0.DC1 only), and Volume 3B Proc. No. Rev. Title OM10.1D3 6 Emergency Plan Training OM10.DC1 2 Emergency Preparedness Drills and Exercises EP G-1 30A Emergency Classification and Emergency Plan Activation EP G-2 24 Activation and Operation of the Interim Site Emergency Organization (Control Room)

EP G-3 36 Notification of Off-Site Agencies and Emergency Response Organization Personnel EP G-4* 18 Personnel Assembly, Accountability and Site Access Control During Emergencies EP G-5 9A Evacuation of Nonessential Site Personnel EP R-2 19C Release of Airborne Radioactive Materials Initial Assessment EP R-3 8C Release of Radioactive Liquids EP R-7 13 Off-Site Transportation Accidents EP OR-3 6A Emergency Recovery EP RB-1 5B Personnel Dosimetry EP RB-2 4B Emergency Exposure Guides EP RB-3 4 Stable Iodine Thyroid Blocking EP RB-4 4A Access to and Establishment of Controlled Areas Under Emergency Conditions EP RB-5 4C Personnel Decontamination EP RB-8 14 Instructions for Field Monitoring Teams EP RB-9 11 Calculation of Release Rate EP RB-10 7A Protective Action Recommendations EP RB-11 12 Emergency Offsite Dose Calculations EP RB-12 6 Plant Vent Iodine and Particulate Sampling During Accident Conditions EP RB-14* 7 Core Damage Assessment Procedure EP RB-15* 11 Post Accident Sampling System EP EF-1 27 Activation and Operation of the Technical Support Center EP EF-2* 26 Activation and Operation of the Operational Support Center EP EF-3 20 Activation and Operation of the Emergency Operations Facility EP EF-4 13A Activation of the Mobile Environmental Monitoring Laboratory EP EF-9 8 Backup Emergency Response Facilities EP EF-10 4 Joint Media Center Activation and Operation

  • Procedure included in this submittal