Emergency Operating Procedures
ML021140400
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/10/2002
From: Widay J
Rochester Gas & Electric Corp
To: Clark R
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML021140400 (5)


Text

R M ff A Subsidiary of RGS Energy Group, Inc.

ROCHESTER GAS AND ELECTRIC CORPORATION - 89 EAST AVENUE, ROCHESTER, N.Y 14649-0001 - 716-771-3250 www.rge.com JOSEPH A. WIDAY VICEPRESIDENT

& PLANTMANAGER GINNA STATION April 10, 2002 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate I Washington, D.C. 20555

Subject:

Emergency Operating Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

As requested, enclosed are Ginna Station Emergency Operating Procedures.

Very truly yours, Lose .WiA.W JAW/jdw xc: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Ginna USNRC Senior Resident Inspector Enclosure(s):

ATT Index ATT-16.2, Rev 2

I / t , 01 REPORT NO. 01 GINNA NUCLEAR POWER PLANT 04/10/02 PAGE: 1 REPORT: NPSP0200 PROCEDURES INDEX DOC TYPE: PRATT EOP ATTACHMENTS PARAMETERS: DOC TYPES - PRATT STATUS: EF QU 5 YEARS ONLY:

PROCEDURE EFFECT LAST NEXT NUMBER PROCEDURI E TITLE REV DATE REVIEW REVIEW ATT-1.0 ATTACHMEZNT AT POWER CCW ALIGNMENT 001 07/26/94 02/10/98 02/10/03 ATT-1.1 ATTACHME!NT NORMAL CCW FLOW 000 05/18/00 05/18/00 05/18/05 ATT-2.1 ATTACHMEINT MIN SW 005 02/01/01 02/10/98 02/10/03 ATT-2.2 ATTACHMEINT SW ISOLATION 008 03/06/02 08/11/98 08/11/03 ATT-2.3 ATTACHMEINT SW LOADS IN CNMT 004 03/06/02 12/31/99 12/31/04 ATT-2.4 ATTACHMENT NO SW PUMPS 001 01/08/02 10/31/01 10/31/06 ATT- 3.0 ATTACHMENT CI/CVI 006 03/06/02 01/06/99 01/06/04 ATT-3.1 ATTACHMENT CNMT CLOSURE 004 03/06/02 01/25/99 01/25/04 ATT-4. 0 ATTACHMENT CNMT RECIRC FANS 003 07/26/94 05/13/98 05/13/03 ATT-5.0 ATTACHMENT COND TO S/G 005 03/06/02 12/31/99 12/31/04 ATT-5.1 ATTACHMENT SAFW 007 09/20/01 12/31/99 12/31/04 ATT-5.2 ATTACHMENT FIRE WATER COOLING TO TDAFW PUMP 003 01/14/99 01/14/99 01/14/04 ATT-6.0 ATTACHMENT COND VACUUM 003 12/18/96 02/10/98 02/10/03 ATT-7.0 ATTACHMENT CR EVAC 006 03/06/02 02/10/98 02/10/03 ATT- 8. 0 ATTACHMENT DC LOADS 006 03/22/99 01/14/99 01/14/04 ATT-8.1 ATTACHMENT D/G STOP 005 03/06/02 02/10/98 02/10/03 ATT -8.2 ATTACHMENT GEN DEGAS 007 03/06/02 08/17/99 08/17/04 ATT-8.3 ATTACHMENT NONVITAL 004 03/06/02 02/10/98 02/10/03 ATT-8.4 ATTACHMENT SI/UV 005 03/06/02 02/10/98 02/10/03 ATT- 9.0 ATTACHMENT LETDOWN 008 03/06/02 03/06/02 03/06/07 ATT- 9.1 ATTACHMENT EXCESS L/D 005 03/06/02 10/31/01 10/31/06 ATT- 10.0 ATTACHMENT FAULTED S/G 006 03/06/02 05/13/98 05/13/03 ATT- 11.0 ATTACHMENT IA CONCERNS 002 04/07/97 08/11/98 08/11/03 ATT-11.I ATTACHMENT IA SUPPLY 003 03/06/02 08/11/98 08/11/03

(. I /\

REPORT NO. 01 GINNA NUCLEAR POWER PLANT 04/10/02 PAGE: 2 REPORT: NPSP0200 PROCEDURES INDEX DOC TYPE: PRATT EOP ATTACHMENTS PARAMETERS: DOC TYPES - PRATT STATUS: EF QU 5 YEARS ONLY:

PROCEDURE EFFECT LAST NEXT NUMBER PROCEDURI E TITLE REV DATE REVIEW REVIEW ATT-11 .2 ATTACHMENT DIESEL AIR COMPRESSOR 002 05/11/01 04/03/98 04/03/03 ATT-12 .0 ATTACHMENT N2 PORVS 004 03/06/02 02/10/98 02/10/03 ATT-13 .0 ATTACHMENT NC 002 07/26/94 02/10/98 02/10/03 ATT- 14.0 ATTACHMENT NORMAL RHR COOLING 003 03/06/02 09/23/99 09/23/04 ATT -14. 1 ATTACHMENT RHR COOL 005 01/08/02 01/08/02 01/08/07 ATT- 14.2 ATTACHMENT RHR ISOL 002 03/06/02 02/10/98 02/10/03 ATT-14.3 ATTACHMENT RHR NPSH 003 03/06/02 01/06/99 01/06/04 ATT- 14.5 ATTACHMENT RHR SYSTEM 002 07/26/94 02/10/98 02/10/03 ATT- 14.6 ATTACHMENT RHR PRESS REDUCTION 002 03/06/02 01/14/99 01/14/04 ATT-15. 0 ATTACHMENT RCP START 009 03/06/02 03/17/00 03/17/05 ATT-15.1 ATTACHMENT RCP DIAGNOSTICS 003 04/24/97 02/10/98 02/10/03 ATT-15.2 ATTACHMENT SEAL COOLING 005 03/06/02 02/10/98 02/10/03 ATT-16 .0 ATTACHMENT RUPTURED S/G 011 07/18/01 01/11/010 01/11/05 ATT- 16.1 ATTACHMENT SGTL 002 03/06/02 09/08/00 09/08/05 ATT-16.2 ATTACHMENT RCS BORON FOR SGTL 002 04/09/02 09/08/00 09/08/05 ATT- 17.0 ATTACHMENT SD-1 012 03/06/02 02/29/00 02/28/05 ATT -17.1 ATTACHMENT SD-2 006 03/06/02 01/30/01 01/30/06 ATT-18 .0 ATTACHMENT SFP - RWST 005 03/06/02 02/10/98 02/10/03 ATT-20 .0 ATTACHMENT VENT TIME 003 07/26/94 02/10/98 02/10/03 ATT- 21.0 ATTACHMENT RCS ISOLATION 002 03/06/02 02/10/98 02/10/03 ATT -22.0 ATTACHMENT RESTORING FEED FLOW 002 09/20/01 01/22/02 01/22/07 ATT- 23.0 ATTACHMENT TRANSFER 4160V LOADS 000 02/26/99 02/26/99 02/26/04 ATT-24 .0 ATTACHMENT TRANSFER BATTERY TO TSC 000 09/08/00 09/08/00 09/08/05 ATT-26 .0 ATTACHMENT RETURN TO NORMAL OPERATIONS 000 10/31/01 10/31/01 10/31/06 TOTAL FOR PRATT 48

EOP: -TITLE:

REV: 2 ATT-16.2 ATTACHMENT RCS BORON FOR SGTL PAGE 1 of 2

'I

=====:U Responsible Manager Date NOTE: Boron calculations below assume most conservative values for temperature coefficient and boron worth.

Determine desired RCS boron concentration using attached figure as follows:

1. Find boron concentration for current cycle burnup. p1pm
2. Add 130 ppm to the value of step 1. +130 p]pm I
3. Total is desired RCS boron concentration for cooldown from 5470F to 5000F.

Total (500 0 F)

4. Add 140 ppm to the value of step 3. +140 ppm I
5. Total is desired RCS boron concentration for cooldown from 500'F to 450*F.

Total (450'F)

EOP: TITLE: REV: 2 ATT-16.2 I

ATTACHMENT RCS BORON FOR SGTL PAGE 2 of 2 I Ginna Cycle 30 Boron Concentration vs. Cycle Bumup at HZP, No Xenon Conditions 1600 1400 "HZP,ARI, less worst stuck rod, Xenon free, 1 minimum shutdown margin required per COLR Figure B 100 PPM ALLOWANCE HAS BEEN ADDED TO 1200 , 100PP ALL VALUES

_______ ______-I____""__________*

1000 C.

0,. _______________ _______5 > ______________________

C 0 i i5

'U C)

C 00 0

0 600 400 200 0

0 2000 4000 6000 8000 10000 12000 14000 16000 18000 Cycle Bumup (MWDIMTU)

Two Loop Flow .-----.

- Single Loop Flow