R M ff A Subsidiary of RGS Energy Group, Inc.
ROCHESTER GAS AND ELECTRIC CORPORATION - 89 EAST AVENUE, ROCHESTER, N.Y 14649-0001 - 716-771-3250 www.rge.com JOSEPH A. WIDAY VICE PRESIDENT
& PLANT MANAGER GINNA STATION April 10, 2002 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Robert Clark Project Directorate I Washington, D.C. 20555
Subject:
Emergency Operating Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
As requested, enclosed are Ginna Station Emergency Operating Procedures.
Very truly yours, Lose
.WiA.W JAW/jdw xc:
U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Ginna USNRC Senior Resident Inspector Enclosure(s):
ATT Index ATT-16.2, Rev 2
REPORT NO.
01 REPORT: NPSP0200 DOC TYPE:
PRATT PARAMETERS:
DOC TYPES -
PRATT PROCEDURE NUMBER PROCEDURI ATT-1.0 ATTACHMEZ ATT-1.1 ATTACHME!
ATT-2.1 ATTACHMEI ATT-2.2 ATTACHMEI ATT-2.3 ATTACHMEI ATT-2.4 ATT-3.0 ATT-3.1 ATT-4. 0 ATT-5.0 ATT-5.1 ATT-5.2 ATT-6.0 ATT-7.0 ATT-8. 0 ATT-8.1 ATT -8.2 ATT-8.3 ATT-8.4 ATT-9.0 ATT-9.1 ATT-10.0 ATT-11.0 ATT-11.I 04/10/02 PAGE:
1 GINNA NUCLEAR POWER PLANT PROCEDURES INDEX EOP ATTACHMENTS STATUS:
EF QU 5 YEARS ONLY:
E TITLE NT AT POWER CCW ALIGNMENT NT NORMAL CCW FLOW NT MIN SW NT SW ISOLATION NT SW LOADS IN CNMT ATTACHMENT NO SW PUMPS ATTACHMENT CI/CVI ATTACHMENT CNMT CLOSURE ATTACHMENT CNMT RECIRC FANS ATTACHMENT COND TO S/G ATTACHMENT SAFW ATTACHMENT FIRE WATER COOLING TO TDAFW PUMP ATTACHMENT COND VACUUM ATTACHMENT CR EVAC ATTACHMENT DC LOADS ATTACHMENT D/G STOP ATTACHMENT GEN DEGAS ATTACHMENT NONVITAL ATTACHMENT SI/UV ATTACHMENT LETDOWN ATTACHMENT EXCESS L/D ATTACHMENT FAULTED S/G ATTACHMENT IA CONCERNS ATTACHMENT IA SUPPLY I /
REV 001 000 005 008 004 001 006 004 003 005 007 003 003 006 006 005 007 004 005 008 005 006 002 003 EFFECT DATE 07/26/94 05/18/00 02/01/01 03/06/02 03/06/02 01/08/02 03/06/02 03/06/02 07/26/94 03/06/02 09/20/01 01/14/99 12/18/96 03/06/02 03/22/99 03/06/02 03/06/02 03/06/02 03/06/02 03/06/02 03/06/02 03/06/02 04/07/97 03/06/02 LAST REVIEW 02/10/98 05/18/00 02/10/98 08/11/98 12/31/99 10/31/01 01/06/99 01/25/99 05/13/98 12/31/99 12/31/99 01/14/99 02/10/98 02/10/98 01/14/99 02/10/98 08/17/99 02/10/98 02/10/98 03/06/02 10/31/01 05/13/98 08/11/98 08/11/98 NEXT REVIEW 02/10/03 05/18/05 02/10/03 08/11/03 12/31/04 10/31/06 01/06/04 01/25/04 05/13/03 12/31/04 12/31/04 01/14/04 02/10/03 02/10/03 01/14/04 02/10/03 08/17/04 02/10/03 02/10/03 03/06/07 10/31/06 05/13/03 08/11/03 08/11/03 t
, 01
(.
REPORT NO.
01 REPORT: NPSP0200 DOC TYPE: PRATT PARAMETERS:
DOC TYPES -
PRATT PROCEDURE NUMBER PROCEDURI ATT-11.2 ATT-12.0 ATT-13.0 ATT-14.0 ATT -14. 1 ATT-14.2 ATT-14.3 ATT-14.5 ATT-14.6 ATT-15. 0 ATT-15.1 ATT-15.2 ATT-16.0 ATT-16.1 ATT-16.2 ATT-17.0 ATT -17.1 ATT-18.0 ATT-20.0 ATT-21.0 ATT -22.0 ATT-23.0 ATT-24.0 ATT-26.0 GINNA NUCLEAR POWER PLANT PROCEDURES INDEX EOP ATTACHMENTS STATUS:
EF QU 5
E TITLE ATTACHMENT DIESEL AIR COMPRESSOR ATTACHMENT N2 PORVS ATTACHMENT NC ATTACHMENT NORMAL RHR COOLING ATTACHMENT RHR COOL ATTACHMENT RHR ISOL ATTACHMENT RHR NPSH ATTACHMENT RHR SYSTEM ATTACHMENT RHR PRESS REDUCTION ATTACHMENT RCP START ATTACHMENT RCP DIAGNOSTICS ATTACHMENT SEAL COOLING ATTACHMENT RUPTURED S/G ATTACHMENT SGTL ATTACHMENT RCS BORON FOR SGTL ATTACHMENT SD-1 ATTACHMENT SD-2 ATTACHMENT SFP -
RWST ATTACHMENT VENT TIME ATTACHMENT RCS ISOLATION ATTACHMENT RESTORING FEED FLOW ATTACHMENT TRANSFER 4160V LOADS ATTACHMENT TRANSFER BATTERY TO TSC ATTACHMENT RETURN TO NORMAL OPERATIONS YEARS ONLY:
EFFECT REV DATE 002 05/11/01 004 03/06/02 002 07/26/94 003 03/06/02 005 01/08/02 002 03/06/02 003 002 002 009 003 005 011 002 002 012 006 005 003 002 002 000 000 000 03/06/02 07/26/94 03/06/02 03/06/02 04/24/97 03/06/02 07/18/01 03/06/02 04/09/02 03/06/02 03/06/02 03/06/02 07/26/94 03/06/02 09/20/01 02/26/99 09/08/00 10/31/01 04/10/02 PAGE:
2 LAST REVIEW 04/03/98 02/10/98 02/10/98 09/23/99 01/08/02 02/10/98 01/06/99 02/10/98 01/14/99 03/17/00 02/10/98 02/10/98 01/11/010 09/08/00 09/08/00 02/29/00 01/30/01 02/10/98 02/10/98 02/10/98 01/22/02 02/26/99 09/08/00 10/31/01 NEXT REVIEW 04/03/03 02/10/03 02/10/03 09/23/04 01/08/07 02/10/03 01/06/04 02/10/03 01/14/04 03/17/05 02/10/03 02/10/03 01/11/05 09/08/05 09/08/05 02/28/05 01/30/06 02/10/03 02/10/03 02/10/03 01/22/07 02/26/04 09/08/05 10/31/06 TOTAL FOR PRATT 48 I / \\
EOP:
-TITLE:
ATT-16.2 ATTACHMENT RCS BORON FOR SGTL REV:
2 PAGE 1 of 2 Responsible Manager Date NOTE:
Boron calculations below assume most conservative values for temperature coefficient and boron worth.
Determine desired RCS boron concentration using attached figure as follows:
- 1. Find boron concentration for current cycle burnup.
p1
- 2.
Add 130 ppm to the value of step 1.
+130 p]
- 3.
Total is desired RCS boron concentration for cooldown from 5470F to 5000F.
Total (500 0 F)
- 4.
5.
Add 140 ppm to the value of step 3.
+140 Total is desired RCS boron concentration for cooldown from 500'F to 450*F.
Total (450'F) pm pm I
ppm I
'I
=====:U
EOP:
TITLE:
REV: 2 ATT-16.2 ATTACHMENT RCS BORON FOR SGTL I
PAGE 2 of 2 I
Ginna Cycle 30 Boron Concentration vs. Cycle Bumup at HZP, No Xenon Conditions 1600 1400 1200 1000 C.
0,.
C 0
'U C
0 C) 0 0
0 600 400 200 0
"HZP, ARI, less worst stuck rod, Xenon free, minimum shutdown margin required per COLR 1
Figure B
100 PPM ALLOWANCE HAS BEEN ADDED TO 100PP ALL VALUES
______-I____""__________*
_______5 i
i5 0
2000 4000 6000 8000 10000 12000 Cycle Bumup (MWDIMTU)
Two Loop Flow Single Loop Flow 14000 16000 18000