Reactor and Senior Reactor Operator Initial Examinations - E. I. Hatch Nuclear Plant Report Nos. 50-321/2002-301 and 50-366/2002-301
ML021140423
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/24/2002
From: Ernstes M
Division of Reactor Safety II
To: Sumner H
Southern Nuclear Operating Co
References
50-321/02-301, 50-366/02-301
Download: ML021140423 (5)


See also: IR 05000321/2002301

Text

April 24, 2002

Southern Nuclear Operating Company, Inc.

ATTN: Mr. H. L. Sumner, Jr.

Vice President

P. O. Box 1295

Birmingham, AL 35201-1295

SUBJECT:

REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS -

E. I. HATCH NUCLEAR PLANT REPORT NOS. 50-321/2002-301 AND

50-366/2002-301

Dear Mr. Sumner:

In a telephone conversation on April 23, 2002, between Mr. Ronald A. Belcher, Nuclear

Operations Plant Instructor, Senior and Mr. Richard S. Baldwin, Senior Operations Engineer,

arrangements were made for the administration of licensing examinations at the Hatch Nuclear

Plant during the weeks of October 14 and 21, 2002 (operating test) and October 15, 2002

(written examination). The on-site preparatory week is scheduled for the week of

September 30, 2002.

The NRC will prepare the examinations based on the guidelines in Revision 8, Supplement 1, of

NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." Your staff will

be given the opportunity to review the examinations during the week of September 30, 2002.

The facility has agreed to fill in the scenario details (ES-D-2) and the details of the JPMs. The

facility has also agreed to make all necessary copies of the examination prior to administration.

To meet the above schedule, it will be necessary for your staff to furnish the reference materials

identified in Attachment 2 of ES-201 by April 29, 2002. Any delay in receiving the required

reference materials, or the submittal of inadequate or incomplete materials, may cause the

examination to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examination is being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior reactor operator license applications (Office of Management and Budget (OMB) approval

2

SNC

number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver

requests (if any) (OMB approval number 3150-0090) at least 30 days before the examination

date. If the applications are not received at least 30 days before the examination date, a

postponement may be necessary. Signed applications certifying that all training has been

completed should be submitted at least 14 days before the examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number 3150-0018, which expires on April 30, 2003. The

public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per

response, including the time for reviewing instructions, gathering and maintaining the data

needed, and completing and reviewing the collection of information. Send comments on any

aspect of this collection of information, including suggestions for reducing the burden, to the

Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV; and to the

Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of

Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Belcher has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Timothy C. Kolb at (404) 562-4665, (Internet E-mail:

TCK@NRC.GOV), Richard S. Baldwin at (404) 562-4642, (Internet E-mail: RSB2@NRC.GOV),

or myself at (404) 562-4638, (Internet E-mail: MEE@NRC.GOV).

Sincerely,

/RA/

Michael E. Ernstes, Chief

Operator Licensing and

Human Performance Branch

Division of Reactor Safety

Docket Nos. 50-321, 50-366

License Nos. DPR-57, NPF-5

cc: (See page 3)

3

SNC

cc contd:

J. D. Woodard

Executive Vice President

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

P. H. Wells

General Manager, Plant Hatch

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

D. M. Crowe

Manager Licensing - Hatch

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Ernest L. Blake, Esq.

Shaw, Pittman, Potts and

Trowbridge

2300 N Street, NW

Washington, D. C. 20037

Office of Planning and Budget

Room 610

270 Washington Street, SW

Atlanta, GA 30334

Director

Department of Natural Resources

205 Butler Street, SE, Suite 1252

Atlanta, GA 30334

Manager, Radioactive Materials Program

Department of Natural Resources

Electronic Mail Distribution

Chairman

Appling County Commissioners

County Courthouse

Baxley, GA 31513

Resident Manager

Oglethorpe Power Corporation

Edwin I. Hatch Nuclear Plant

Electronic Mail Distribution

Charles A. Patrizia, Esq.

Paul, Hastings, Janofsky & Walker

10th Floor

1299 Pennsylvania Avenue

Washington, D. C. 20004-9500

Senior Engineer - Power Supply

Municipal Electric Authority

of Georgia

Electronic Mail Distribution

Pete W. Wells

General Manager, Plant Hatch

E. I. Hatch Nuclear Plant

U. S. Highway 1 North

P. O. Box 2010

Baxley, GA 31515

4

SNC

Distribution:

L. Olshan, NRR

C. Evans (Part 72 Only)

RIDSNRRDIPMLIPB

PUBLIC

OFFICE

RII:DRS

RII:DRS

RII:DRS

RII:DRP

SIGNATURE

/RA/

/RA/

/RA/

/RA/

NAME

T Kolb:pmd

R Baldwin

MErnstes

S Cahill

DATE

4/ 24 /2002

4/ 24 /2002

4/ 24 /2002

4/ 24 /2002

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML021140423.wpd