ML18289A774 | 10 December 2018 | 99902028 | Denial of Fee Exemption Request for Charges Incurred in Review of a Special Project Related to NEI |
ML18303A122 | 24 October 2018 | PRM-73-18 - Six Month Status Update to Mr. Pollock from Y. Malve-Velez, Project Manager Amend Regulations to Section 73.54 Protection of Digital Computer and Communication Systems and Networks | |
ML18232A390 | 19 October 2018 | Response to Letter Regarding NEI Comments on Aluminum High Energy Arcing Fault (HEAF) Particle Size Characterization Test Plan Draft Test Plan; 83 Fr 9334; Docket Id NRC-2018-0040 | |
ML18171A043 | 11 April 2018 | PRM-73-18 - Status Update Email Sent to Petitioner J. Pollock Protection of Digital Computer and Communication Systems and Networks | |
ML18057A137 | 27 February 2018 | NRR Dirs Response to NEI Letter on Fire Protection Triennial Inspection February 2018 | |
ML17276B172 | 6 November 2017 | Letter to Joseph E. Pollock NEI White Paper NRC Budget Adjustments - Letter | |
ML17256A240 | 28 September 2017 | Transmission Letter - Hardened Containment Venting System (HCVS) Phase 1 and 2 Final Integrated Plan Template (EA-13-109) | |
ML17202U681 | 4 August 2017 | Receipt of Nuclear Energy Institute Draft Technical Report NEI 16-07, Revision a, Improving the Effectiveness of Issue Resolution to Enhance Safety and Efficiency | |
ML17157B222 | 31 May 2017 | PRM-73-18 - Email to Mr. Pollock Six-Month Status Update on Petition to Amend 10 CFR 73.54 Protection of Digital Computer and Communication Systems and Networks. | |
ML16078A243 | 18 March 2016 | 2016 RIC Thank You Letter from Bill Dean to Joe Pollock | |
ML15350A158 | 17 March 2016 | Endorsement of Electric Power Research Institute Report 3002007148, Seismic Evaluation Guidance: Spent Fuel Pool Integrity Evaluation. | |
ML15271A148 | 8 October 2015 | Transmission Letter - Hardened Containment Venting System (HCVS) Phase 1 and 2 Overall Integrated Plan Template | |
ML15273A191 | 5 October 2015 | Letter to Joseph Pollock in Response to NEI Letter That Provided Comments and Analyses on the Final NRC Fy 2015 Annual Fee Rule and Its Impact on Industry | |
ML15218A569 | 17 September 2015 | Endorsement of Electric Power Research Institute Final Draft Report 3002004396, High Frequency Program Application Guidance for Functional Confirmation and Fragility | |
ML15240A072 | 14 September 2015 | Letter to Nuclear Energy Institute NRC Approval of White Paper HCVS-WP-04, Missile Evaluation of HCVS Components 30 Feet Above Grade | |
ML15125A442 | 18 May 2015 | Endorsement of NEI Alternate Approach for Spare Hoses and Cables | |
ML14147A073 | 17 April 2015 | Joseph E. Pollock Ltr. Nuclear Energy Institute Draft Position Paper | |
ML15040A038 | 4 March 2015 | Transmittal Letter Hardened Containment Venting System White Paper NEI HCVS-WP-03 - Hydrogen/Carbon Monoxide Control Measures, Rev. 1 | |
ML14358A040 | 5 February 2015 | Transmittal Letter on Hardened Containment Venting System (HCVS) White Paper NEI HCVS-WP-02 - Sequences for HCVS Design and Method for Determining Radiological Dose from HCVS Piping, Revision 0, October 23, 2014 | |
ML14265A107 | 26 September 2014 | Staff Assessment of National SAFER Response Centers Established in Response to Order EA-12-049 | |
ML14126A374 | 15 May 2014 | Transmittal Letter to the Nuclear Energy Institute Hardened Containment Venting System (Hvcs) White Paper NEI-HCVS-WP-01 | |
ML14128A219 | 14 May 2014 | Transmittal Letter to Joseph E. Pollock NEI Hardened Containment Venting System Phase 1 OIP Template | |
ML13358A206 | 9 January 2014 | BWR Anticipatory Venting Letter in Regards to Order EA-12-049 | |
ML13352A066 | 1 November 2013 | Nuclear Energy Institute | Attachment 1 - BWR Containment Venting |
ML13276A224 | 7 October 2013 | Maintenance and Testing Endorsement Letter in Regards to Mitigation Strategies Order EA-12-049 | |
ML13275A318 | 3 October 2013 | Mitigation Strategies Order EA-12-049, NEI Position Paper: MAAP Endorsement Letter | |
ML13267A382 | 30 September 2013 | Endorsement Letter: Mitigation Strategies Order EA-12-049, NEI Position Paper: Shutdown/ Refueling Modes | |
ML13106A331 | 7 May 2013 | Acceptance Letter for NEI Submittal of Augmented Approach, Ground Motion Model Update Project, and 10 CFR 50.54(f) Schedule Modifications Related to the NTTF Recommendation 2.1,Seismic Reevaluations | |
ML13029A632 | 27 February 2013 | Letter to NEI Multi-Unit Dose Assessment | |
ML121710592 | 19 June 2012 | Waterford | Email, Request for Additional Information, Round 2, License Amendment Request for Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train |
ML12091A049 | 31 March 2012 | Indian Point | NRC Staff Pre-Filed Hearing Exhibit NRC000107, Indian Point Nuclear Generating Units 2 and 3 - NRC License Renewal Inspection Report 05000247/2008006 & 05000286/2008006 |
ML12090A881 | 30 March 2012 | Indian Point | NRC Staff Pre-Filed Hearing Exhibit NRC000107, Indian Point Nuclear Generating Units 2 and 3 - NRC License Renewal Inspection Report 05000247/2008006 and 05000286/2008006 |
IR 05000247/2011201 | 22 November 2011 | Indian Point | NRC Security Inspection Report 05000247-11-201 and 05000286-11-201. (Cover Letter) |
IR 05000247/2011004 | 10 November 2011 | Indian Point | IR 05000247-11-004; 7/1/2011- 9/30/2011; Indian Point Nuclear Generating (Indian Point) Unit 2; Follow Up of Events |
IR 05000286/2011004 | 7 November 2011 | Indian Point | Official Exhibit - RIV000085-00-BD01 - Indian Point Nuclear Generating Unit 3 - NRC Integrated Inspection Report 05000286-2011004 (November 7, 2011) |
ML11311A222 | 7 November 2011 | Indian Point | IR 05000286-11-004; 7/1/11 - 9/30/11; Indian Point Nuclear Generating (Indian Point) Unit 3; Resident Integrated Inspection Report |
ML11356A520 | 7 November 2011 | Indian Point | Riverkeeper (Riv) Pre-Filed Evidentiary Hearing Exhibit RIV000085, Indian Point Nuclear Generating Unit 3 - NRC Integrated Inspection Report 05000286-2011004 (November 7, 2011) |
ML112840284 | 11 October 2011 | Indian Point | IR 05000003-11-008, on 09/01/11, Entergy Nuclear Operations, Inc., Buchanan, New York Site (Corrected Copy - Transmittal Letter) |
ML112690256 | 26 September 2011 | Indian Point | IR-05000003-11-008, on 09/01/11, Entergy Nuclear Operations, Inc., Buchanan, New York Site (Transmittal Letter) |
IR 05000286/2011010 | 14 September 2011 | Indian Point | IR 05000286/2011010; 07/18/11-08/05/11; Indian Point Nuclear Generating (Indian Point) 3; Biennial Baseline Inspection of Problem Identification and Resolution |
ML112420836 | 1 September 2011 | Indian Point | Mid-Cycle Performance Review and Inspection Plan 2011 - Indian Point Nuclear Generating Units 2 and 3 |
ML11349A118 | 30 August 2011 | Indian Point | New York State (NYS) Pre-Filed Hearing Exhibit NYS000160, Brian Holian 08/30/2011 Letter to Joseph Pollock of Entergy Nuclear Operations, Inc Re Supplement to SER on License Renewal of Indian Point Nuclear Plant, Units 2 & 3 |
ML12334A678 | 30 August 2011 | Indian Point | Official Exhibit - NYS000160-00-BD01 - NUREG-1930, Safety Evaluation Report Related to the License Renewal of IP Nuclear Generating Unit Nos. 2 and 3, Supplement No. 1; Brian Holian 08/30/2011 Letter to Joseph Pollock, Inc Re Supplement to |
ML11201A033 | 30 August 2011 | Indian Point | Safety Evaluation Report Related to the License Renewal of Indian Point Nuclear Generating Station, Units 2 and 3 |
ML112411212 | 29 August 2011 | Indian Point | Senior Reactor and Reactor Operator Initial License Examinations - Indian Point 2 |
IR 05000286/2011003 | 9 August 2011 | Indian Point | IR 05000286-11-003; 4/1/11 - 6/30/11; Indian Point Nuclear Generating (Indian Point) Unit 3; Identification and Resolution of Problems |
IR 05000247/2011003 | 8 August 2011 | Indian Point | IR 05000247-11-003, on 04/01/2011 - 06/30/2011, Indian Point, Unit 2, Licensed Operator Requalification Program, Maintenance Effectiveness, Operability Evaluations, and Identification and Resolution of Problems |
ML112140036 | 2 August 2011 | Indian Point | Requalification Program Inspection - Indian Point 3 |
IR 05000247/2011010 | 11 July 2011 | Indian Point | IR 05000247-11-010, 05000286-11-008; 05/09/2011 - 05/27/2011; Indian Point Nuclear Generating Units 2 and 3; Unit 3 Triennial Fire Protection Team and Units 2 and 3 Annual Follow-up of Selected Issues Inspections |
IR 05000247/2011009 | 13 May 2011 | Indian Point | IR 05000247/2011009; 04/18/2011 - 04/27/2011; Indian Point Nuclear Generating Unit 2; Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event |