Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML19017A17111 January 2019NRC-2019-000072 - Appeal Response Letter to NRC-2018-000259
ML18219B0533 August 2018NRC-2018-000259 - Resp 1 - Final
ML18213A26525 July 2018NRC-2018-000435 - Resp 1 - Final
ML16146A15627 May 2016Branch Chief Reassignment to Shaun Anderson Effective May 29, 2016 - September 3, 2016
ML16145A3836 April 2016Final Qa/Related Forms (Folder 1)Job Performance Measure
ML16082A49629 March 2016Letter - Withdrawal of Amendment Request to Revise Technical Specification 5.5.6 for Extension of Type a and Type C Leak Rate Test Frequencies
ML16145A36924 March 2016Miscellaneous Exam Material (Folder 1)
ML16085A2473 March 2016Final Written Examination with Answer Key (401-5 Format) (Folder 3)Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Half scram
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Locked High Radiation Area
Scram Discharge Volume
Fuel cladding
Hourly Fire Watch
ML16081A1593 March 2016NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2)
ML16085A2481 March 2016Handouts to Applicants - Summary of References(Folder 3)
ML16085A2461 March 2016Final Outlines (Folder 3)Failure to Scram
ML16081A07729 February 2016NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2)
ML16085A24925 February 2016Final Operating Exam (Sections a, B, and C) (Folder 3)Half scram
Stroke time
Squib
Locked High Radiation Area
Job Performance Measure
Scram Discharge Volume
Earthquake
Fuel cladding
Power change
Failure to Scram
Water hammer
ML14259A1875 January 2016Safety Evaluation Concerning Conforming License Amendment to Pre-emption Confirmatory Order (Tac Nos. MF2701 and MF2702)Fitness for Duty
Preemption Authority
NRC-2015-0247, Final Environmental Assessment-FONSI Related to Preemptive Authority Requests (Firearms)(Cac Nos. MF2701 and MF2702)8 December 2015Final Environmental Assessment-FONSI Related to Preemptive Authority Requests (Firearms)(Cac Nos. MF2701 and MF2702)Environmental Justice
ML15320A0318 December 2015Final Environmental Assessment-FONSI Related to Preemptive Authority Requests (Firearms)Environmental Justice
ML15257A1678 September 2015FOIA/PA-2015-0452 - Resp 1 - Final
ML14259A19331 March 2015SECY-15-0046: Enclosure 4 - Request Approval Staff Recommendation Authorize Indian Point Nuclear Generating; James A. Fitzpatrick Nuclear Power Plant; Nine Mile Point Nuclear Station; R.E. Ginna Nuclear Power Plant-Use Section 161a PreemptiPreemption Authority
Exemption Request
ML15007A16510 November 2014Final Qa/Related Forms (Folder 1)Job Performance Measure
ML14318A45815 September 2014Final Outlines (Folder 3)Squib
ML14318A46615 September 2014Final Written Examination with Answer Key (401-5 Format) (Folder 2)Hot Short
Time of Discovery
Shutdown Margin
Half scram
Squib
Missed surveillance
Offsite Circuit
Grace period
Power change
Failure to Scram
Overspeed trip
ML14318A47415 September 2014Handouts to Applicants (Folder 3)
ML14318A51015 September 2014Final Operating Exam (Sections a, B, and C) (Folder 3)High winds
Half scram
Stroke time
Squib
Locked High Radiation Area
Double blade guide
Job Performance Measure
Earthquake
Failure to Scram
Loss of condenser vacuum
ML14261A3008 September 2014NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2)
ML14261A2782 September 2014NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2)
ML14261A31523 July 2014Draft Written Exam (Folder 2)Hot Short
Time of Discovery
Shutdown Margin
Half scram
Squib
Missed surveillance
Offsite Circuit
Grace period
Power change
ML14177A77524 June 2014Notification of Conduct of a Triennial Fire Protection Baseline InspectionSafe Shutdown
Fitness for Duty
Fire Barrier
Probabilistic Risk Assessment
Operator Manual Action
Temporary Modification
Multiple Spurious Operation
Emergency Lighting
Job Performance Measure
Thermoset
Severe Accident Management Guideline
B.5.b Mitigating Strategies
Exemption Request
Fire Protection Program
IR 05000333/201430112 May 2014Er 05000333/2014301; 4/14/2014 4/23/2014; James A. FitzPatrick Nuclear Power Plant; Initial Operator Licensing Examination Report
ML14119A3934 April 2014NRC Comments on Draft Licensee- Developed Exam (Operating) (Folder 2)Earthquake
ML14119A3941 April 2014NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2)
ML13351A05120 December 2013Branch Chief Reassignment for Plant Licensing Branch I-1
ML14010A01619 November 2013NRR E-mail Capture - Request for Additional Information-James A. FitzPatrick Nuclear Power Plant-Revise License Condition 2.T
ML13219A0056 August 2013NRR E-mail Capture - Acceptance Review Concerning Request for Amendment to Revise the License Comdition 2.t
IR 05000333/20120037 August 2012IR 05000333-12-003; 04/01/2012 - 06/30/2012; James A. FitzPatrick Nuclear Power Plant (Fitzpatrick); Maintenance Risk Assessment and Problem Identification and ResolutionHigh Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
Hydrostatic
Temporary Modification
Functionality Assessment
Significance Determination Process
Job Performance Measure
Process Control Program
Operability Determination
Frazil ice
Offsite Circuit
Substantial potential for overexposure
Power change
Overexposure
Overspeed trip
ANS Design Report
ML12058002627 February 2012ME6877, RAIs to Licensee LAR to Revise the Current Licensing Bases Authorizing On-Load Tap Changers for RSSTReserve Station Service Transformer
ML11300014727 October 2011ME7243, Acceptance Review, RR-8, Proposed Alternative Examination Requirments for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using ASME Code Case N-702 & BWRVIP-108NP
ML11285070912 October 2011ME6686, RAIs to Licensee VRR-07
ML11255040812 September 2011ME6877, E-mail to Licensee, Acceptance of LAR Changes to the Licensing Basis, Authorizing the Use of on Load Tap Changers for Reserve Station Service TransformerReserve Station Service Transformer
ML11255014312 September 2011ME6755, E-mail to Licensee Regarding RAIs on License Amendment Request for Adopting TSTS-425, Revision 3Probabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
ML1125100288 September 2011ME6686 & ME6687, e-mail to the Licensee RAIs from Component Performance & Testing BranchStroke time
Probabilistic Risk Assessment
ML11236011524 August 2011ME6755, E-mail to Licensee for Acceptance Review Adoption of TSTF-425 Rev 3
ML11231000819 August 2011ME6686 & ME6687, E-mail to Licensee for Acceptance Review VRR-07 & VRR-08
ML11069A00120 April 2011Approval of Change of Emergency Action Level Scheme from NUMARC/NESP-007, Revision 2, to NEI 99-01, Revision 5Internal Flooding
Fuel cladding
ML11054045723 February 2011Request for Additional Information Regarding Amendment Application for Approval of the Cyber Security PlanCyber Security
ML1103500884 February 2011ME5323, Acceptance of LAR Revision of License Condition 2C(3), Fire Protection Plan
ML10235008523 August 2010ME3787, Draft RAIs from NSIR Proposed Changes to EAL Scheme for NRC Review and ApprovalOperating Basis Earthquake
Exemption Request
ML10231000319 August 2010ME3786, Follow-Up RAIs Basedon Review of Response Letter 07-28-2010 & Subsequent to NRC Staff Audit on 08-10-2010
ML1021800096 August 2010James A. Fitzpatrick Nuclear Power Plant, ME3786, Follow-Up RAI to the RAI Responses Dated July 28 2010
ML1021400902 August 2010ME4267, Acknowledgment of Withdrawal of LAR Dated November 23, 2009, and Acceptance of Revised LAR Dated July 15, 2010 - Cyber Security PlanCyber Security
ML1019300089 July 2010ME4124, Acceptance Review-Draft Requests for Information Required