TAC:ME6755, Control Room Habitability, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B (Approved, Closed) |
|
MONTHYEARJAFP-11-0088, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program in Accordance with TSTF-425, Revision 3, James A. F2011-07-22022 July 2011 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program in Accordance with TSTF-425, Revision 3, James A. FitzP Project stage: Request ML1123601152011-08-24024 August 2011 ME6755, E-mail to Licensee for Acceptance Review Adoption of TSTF-425 Rev 3 Project stage: Acceptance Review ML1125501432011-09-12012 September 2011 ME6755, E-mail to Licensee Regarding RAIs on License Amendment Request for Adopting TSTS-425, Revision 3 Project stage: RAI JAFP-11-0119, Response to Request for Additional Information Regarding the Application for a Technical Specification Change to Relocate Specific Surveillance Frequency Requirements to a Licensee Controlled Program in Accordance with TSTF-425,...2011-10-19019 October 2011 Response to Request for Additional Information Regarding the Application for a Technical Specification Change to Relocate Specific Surveillance Frequency Requirements to a Licensee Controlled Program in Accordance with TSTF-425,... Project stage: Response to RAI ML1134308512012-02-14014 February 2012 License Amendment, Issuance of Amendment Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Project stage: Approval 2011-08-24
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24024A1372024-01-24024 January 2024 NRR E-mail Capture - Final Snsb RAI Regarding FitzPatrick Amendment to Modify Safety Relief Valves Setpoint Lower Tolerance ML24017A1112024-01-17017 January 2024 NRR E-mail Capture - Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-529, Clarifyuse and Applicaion Rules, Revision 4 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23261C3982023-09-0808 September 2023 Acceptance Review of Amendment to Update the Fuel Handling Accident Analysis ML23244A2662023-09-0101 September 2023 Acceptance of Requested Licensing Action Amendment Request to Modify Surveillance Requirement 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23194A1822023-08-0303 August 2023 Acceptance Review for LAR Re SRM 3.3.1.2 ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22124A2672022-05-0404 May 2022 Request for Additional Information for James A. FitzPatrick Nuclear Power Plant TSTF-505 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML22063A4742021-11-29029 November 2021 Acceptance of Requested Licensing Action License Amendment Request to Eliminate Selected Response Time Testing ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21246A2112021-09-0303 September 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-505 ML21246A2072021-09-0303 September 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21187A0522021-07-0606 July 2021 Fitz RAI Regarding FitzPatrick Amendment Request to Modify SR 3.5.1.6 ML21246A2142021-06-23023 June 2021 Acceptance of Requested Licensing Action Regarding License Amendment Request to Adopt TSTF-264 ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A1072021-05-17017 May 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-582 ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML21014A5112021-01-12012 January 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-545 Revision 3 ML20352A2752020-12-17017 December 2020 Request for Additional Information Regarding FitzPatrick Primary Containment Isolation Valve Amendment Request ML20350B5582020-12-14014 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Alternative Request for Documentation of Replacement of Pressure Retaining Bolting ML20294A0372020-10-19019 October 2020 Request for Additional Information Primary Containment Isolation Valve License Amendment Request ML20266G3032020-09-22022 September 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Request to Use Paragraph IWA-5120 of the 2017 Edition of the ASME B&PV Code, Section XI ML20217L3882020-08-0404 August 2020 Acceptance of Requested Licensing Action License Amendment Request to Modify Primary Containment Isolation Valve TS (EPID L-2020-LLA-0145) (E-Mail) ML20204A9692020-07-22022 July 2020 Acceptance of Requested Licensing Action License Amendment Request to Adopt-TSTF-478 Revision 2 ML20122A2302020-05-0101 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of Fleet License Amendment Request to Adopt TSTF-566 ML20066L3682020-03-0505 March 2020 Request for Additional Information: License Amendment Request for Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment ML20056E7992020-02-25025 February 2020 Request for Additional Information for LAR on Primary Containment Hydrodynamic Loads ML20035D5762020-02-0303 February 2020 Request for Additional Information: License Amendment Request for Application of the Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequence ML20027A0672020-01-24024 January 2020 Accepted for Review - Fitzpatrick License Amendment Request to Adopt TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20027A0112020-01-23023 January 2020 Request for Additional Information: License Amendment Request for Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation ML19353A9452019-12-19019 December 2019 Request for Additional Information: License Amendment Request for Application of the Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequences ML19319C3582019-11-15015 November 2019 NRR E-mail Capture - Accepted for Review - FitzPatrick License Amendment Request to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation ML19322A0062019-11-15015 November 2019 NRR E-mail Capture - Fermi 2: Request for Additional Information- Relief Request VRR-006, Proposed Alternative for Preservice Testing of Butterfly Valves ML19316A0162019-11-0404 November 2019 NRR E-mail Capture - Revised Staff Hours Estimate - FitzPatrick License Amendment Request on Proposed Changes to the Technical Specifications Related to Primary Containment Hydrodynamic Loads 2024-01-24
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24024A1372024-01-24024 January 2024 NRR E-mail Capture - Final Snsb RAI Regarding FitzPatrick Amendment to Modify Safety Relief Valves Setpoint Lower Tolerance ML24018A0012024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000333/2024010) and Request for Information ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23164A0322023-06-13013 June 2023 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000333/2023010 ML22321A0102022-11-17017 November 2022 Notification of Conduct of a Fire Protection Team Inspection ML22124A2672022-05-0404 May 2022 Request for Additional Information for James A. FitzPatrick Nuclear Power Plant TSTF-505 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21187A0522021-07-0606 July 2021 Fitz RAI Regarding FitzPatrick Amendment Request to Modify SR 3.5.1.6 ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21041A1932021-02-10010 February 2021 Request for Information for a Triennial Baseline Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements Inspection; Inspection Report (05000333/2021011) ML20066L3682020-03-0505 March 2020 Request for Additional Information: License Amendment Request for Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment ML20056E7992020-02-25025 February 2020 Request for Additional Information for LAR on Primary Containment Hydrodynamic Loads ML20035D5762020-02-0303 February 2020 Request for Additional Information: License Amendment Request for Application of the Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequence ML20027A0112020-01-23023 January 2020 Request for Additional Information: License Amendment Request for Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation ML19353A9452019-12-19019 December 2019 Request for Additional Information: License Amendment Request for Application of the Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequences ML19322A0062019-11-15015 November 2019 NRR E-mail Capture - Fermi 2: Request for Additional Information- Relief Request VRR-006, Proposed Alternative for Preservice Testing of Butterfly Valves ML19280A0372019-10-0505 October 2019 NRR E-mail Capture - FitzPatrick Revised Request for Additional Information: Emergency Amendment to Extend Completion Time of Transformer to 21 Days ML19280A0392019-10-0505 October 2019 NRR E-mail Capture - FitzPatrick Additional Request for Additional Information: Emergency Amendment to Extend Completion Time of Transformer to 21 Days ML19280A0362019-10-0404 October 2019 NRR E-mail Capture - FitzPatrick Request for Additional Information: Emergency Amendment to Extend Completion Time of Transformer to 21 Days ML19099A2672019-04-16016 April 2019 Use of Encryption Software for Electronic Transmission of Safeguards Information ML19099A2852019-03-12012 March 2019 Draft RAI: FitzPatrick Request to Update Electronic Transmission of Safeguards Information ML19025A1202019-01-24024 January 2019 NRR E-mail Capture - Calvert Cliffs, Fitzpatrick, and Nine Mile Point - Request for Additional Information Regarding License Amendment Request to Revise Emergency Response Organization Staffing ML18353B5112018-12-20020 December 2018 Request for Additional Information Relief Request No. 14R-22, for Fourth 10-Year Inservice Inspection Interval ML18164A3652018-06-13013 June 2018 NRR E-mail Capture - FitzPatrick RAIs - LAR to Adopt EAL Schemes Pursuant to NEI 99-01, Revision 6 ML18094B0922018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to B. S. Ford RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59) ML18085A6922018-03-26026 March 2018 NRR E-mail Capture - James A. FitzPatrick Nuclear Power Plant, Unit 1 - Request for Information to Adopt Traveler TSTF-542, RPV Water Inventory Control ML18085A6912018-03-23023 March 2018 NRR E-mail Capture - Draft Request for Information (RAI) for JAFNPP Traveler TSTF-542, RPV Water Inventory Control ML18029A8422018-01-29029 January 2018 NRR E-mail Capture - Request for Additional Information: FitzPatrick License Amendment Request to Revise Technical Specifications to Address Secondary Containment Personnel Access Door Openings ML17335A1002017-11-29029 November 2017 NRR E-mail Capture - FitzPatrick - Request for Additional Information - Relief Request 15R-02 Regarding the Use of BWRVIP Guidelines Instead of ASME Code (CAC: MG0116; EPID: L-2017-LLR-0083) ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. ML17228A0052017-08-15015 August 2017 NRR E-mail Capture - Request for Additional Information - St. Lucie Relief Request #3 - Icw 30 Pipe Defect Removal (MF9288) ML16299A0192016-11-0202 November 2016 Request for Additional Information Regarding Direct License Transfer from Entergy to Exelon ML16287A6502016-10-21021 October 2016 Request for Additional Information Regarding: License Amendment Request to Revise Technical Specifications Section 5.5.6 for Extension of Type a and Type C Leak Rate Test Frequencies ML16280A5732016-10-18018 October 2016 Request for Additional Information Relief Request for Proposed Alternative for the Implementation of BWRVIP-05 ML16117A1862016-04-26026 April 2016 Entergy Fleet Relief Request EN-ISI-15-1 Request for Additional Information - 04/26/16 Email from R. Guzman to G. Davant (CAC Nos. MF7133-MF7136) ML16013A0642016-01-13013 January 2016 NRR E-mail Capture - Request for Additional Information Entergy CNRO-2015-00023 - Revision to Entergy Quality Assurance Program Manual (Fleet Submittal CAC Nos. MF7086-MF7097) ML15341A1662015-12-0707 December 2015 NRR E-mail Capture - Entergy Fleet RR-EN-15-1, Request for Additional Information (CACs MF6341-MF6349) ML14240A6122014-09-24024 September 2014 Request for Additional Information Regarding Proposed Changes to the Technical Specification Low Pressure Safety Limit ML14184A6152014-07-25025 July 2014 Request for Additional Information Regarding Proposed Safety Limit Minimum Critical Power Ratio License Amendment ML14195A0972014-07-16016 July 2014 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Hazard and Screening Report ML14164A5382014-07-0202 July 2014 Request for Additional Information Regarding 10 CFR 50.55A Alternate Request PRR-05 (Tac No. MF3680) ML14093A6772014-05-0101 May 2014 SONGS - Request for Additional Information Concerning Pre-Emption Authority ML13338A6452013-12-12012 December 2013 Interim Staff Evaluation and Request for Additional Information, Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13226A5342013-08-29029 August 2013 Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) ML13179A4622013-07-0505 July 2013 Entergy Nuclear Operations, Inc., Decommissioning Funding Status Report Request for Additional Information Regarding the Decommissioning Funding Status Report 2024-01-24
[Table view] |
Text
From: Vaidya, Bhalchandra Sent: Monday, September 12, 2011 10:47 AM To: 'Dorman, Eugene'; 'Pechacek, Joseph' Cc: Salgado, Nancy; Harrison, Donnie; Howe, Andrew; Waig, Gerald; Elliott, Robert
Subject:
FitzPatrick - ME6755- Draft RAIs Re: LAR for Adopting TSTF-425, Revision 3
SUBJECT:
James A. FitzPatrick Nuclear Power Plant (JAFNPP) -REQUESTED LICENSING ACTION RE: License Amendment Request (LAR) to adopt U.S. Nuclear Regulatory Commission (NRC)-approved Technical Specification Task Force (TSTF-425), Revision 3 (TAC NO. ME6755)
By application dated July 22, 2011 .(Agencywide Documents Access and Management System Accession No. ML112060443), Entergy Nuclear Northeast requested changes to the technical specifications for the James A. Fitzpatrick Nuclear Power Plant. The requested change is the adoption of NRC-approved TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee ControlRITSTF Initiative 5b.
The NRC staff has completed its initial review of the proposed changes and have identified a number of areas where additional information is needed to complete our review. The request for additional information is provided below:
==========================================================
REQUEST FOR ADDITIONAL INFORMATION RELATED TO AN AMENDMENT TO IMPLEMENT TSTF-425 REVISION 3 ENTERGY NUCLEAR NORTHEAST JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET NO. 50-333
- 1. In Section 2.2.3 of Attachment 1 of the LAR, the licensee identified that the September 2009 peer review identified 51 facts and observations (F&Os), 21 of which were considered to not meet at least capability category II of the applicable internal events probabilistic risk assessment (PRA) standard.
Table 2-1 of Attachment 1 summarizes and assesses the open F&Os. There are 11 F&Os discussed in Table 2-1.
- a. How was the determination made for each F&O that capability category II of the standard was not met - was this internally determined by licensee staff, or by the peer review? If determined by licensee, then discuss this decision process.
- b. The licensee is requested to confirm that the other 10 F&Os not summarized in Table 2-1 have been resolved and closed out, and that their disposition is reflected in the current PRA model proposed for use to support the Surveillance Frequency Control Program (Reference 3 of Attachment 1); if any of these 10 F&Os were closed out without making any changes to the PRA model, then the licensee is requested to provide summary information of the F&O, and justification as to why no change was required to resolve the issue. If the other 10 F&Os are not yet closed, the licensee should discuss and justify why these F&Os were omitted from Table 2-1.
- 2. The summary of the F&O for supporting requirement (SR) AS-B7 is unclear, in that the table (Table 2-1 of Attachment 1) entry implies that the Control Rod Drive (CRD) system model logic and success criteria do not explicitly account for the fact that the CRD system capacity is insufficient for decay heat removal early in the sequence (i.e., immediately after a plant trip), but that the CRD system is only credited on the success branch, which would seem to imply that the model logic is accurate. Further, the disposition of the importance of this F&O states that surveillance test interval changes would not
be relevant to the modeling of long term use of CRD; this would appear to be inconsistent with the potential impact of improper modeling of CRD on the risk importance of CRD and other injection sources, which could impact the risk calculations made to address surveillance test interval changes for such systems. Finally, it is stated that random failures of early injection are truncated out during accident sequence quantification. While this may be accurate, it does not seem to be relevant to the issue of improper crediting of the CRD injection function. The U.S. Nuclear Regulatory Commission (NRC) staff is unable to reach a conclusion regarding this F&O and requests the following clarifications:
- a. Provide the full text of the F&O for staff review.
- b. Describe how the CRD injection function is modeled in the accident sequence logic, and specifically identify how this modeling will ultimately be revised to address the F&O (if applicable),
or justify that the existing modeling is correct or conservative.
- c. If the current modeling of the CRD injection function is non conservative, provide bounding sensitivity analyses which do not credit the CRD system.
- 3. The summary of the F&O for SR HR-G7 identifies that the modeling for human error dependencies is not correct, in that the order of the events is based on individual human error probabilities (HEPs) rather than the order in which the events will occur in a given accident sequence, which is the accepted method for analyzing the overall joint probability of multiple dependent human errors. The licensee discussion of the importance of this F&O states that lower probability human errors (i.e.,
those most likely to be successful) generally occur earlier in the sequence. The NRC staff is not aware of this fact as a generally accepted principle in PRA. The licensee also states that dependent probabilities are conservative because the dependency between execution portions of two actions are frequently low or zero, while the dependent probability applies to the overall HEPs. While this may be an accurate statement, the qualitative identification of conservatism in a calculation is not an adequate basis to judge the potential quantitative impact of an inaccurate calculation method. The NRC staff is unable to reach a conclusion regarding this F&O and requests the following clarifications:
- a. Provide the basis for the assertion that lower probability human errors generally occur earlier in the sequence.
- b. Discuss the scope of this F&O in terms of the number of dependency calculations which are impacted, the quantitative impact of individual calculations of dependency, and the potential cumulative impact on overall model results.
- 4. The summary of the F&O for SR LE-E3 identifies that the definition of early is not consistent and that this may result in some large early release frequency (LERF) sequences being classified as non-LERF. The licensee discussion of the importance of this F&O states that changes to surveillance test interval would not impact the time available for protective actions prior to a release. The NRC staff believes that the potential impact of this F&O is that a change to a surveillance test interval may be calculated as having a lesser impact on LERF, since LERF sequences may not be properly identified. The fact that surveillance test intervals are unrelated to the time available for protective actions, while accurate, is not relevant in assessing the potential quantitative impact of this F&O. The NRC staff is unable to reach a conclusion regarding this F&O and requests the following clarifications:
- a. Provide the full text of the F&O for staff review.
- b. Provide the basis for defining early in the actual PRA model of LERF sequences.
- c. Discuss where the model may be non conservative (i.e., treating potential LERF sequences as non-LERF) and include a quantitative assessment of the non conservatisms.
Please contact me ASAP, to schedule a telephone conference call between the NRC staff and the licensee staff, to ensure that the RAI is clear to the licensee, and also, to obtain the firm commitment from the licensee for the supplemental submission with full and complete response to the RAI.
- Thanks, Bhalchandra K. Vaidya Licensing Project Manager NRC/NRR/DORL/LPL1-1 (301)-415-3308 (O) bhalchandra.vaidya@nrc.gov