ML23325A063 | | 21 December 2023 | Summary of November 14, 2023, Information Public Meeting on Draft Revision 9 to Branch Technical Position 7-19 | Probabilistic Risk Assessment |
ML23290A121 | | 25 October 2023 | Meeting Summary Pre-Submittal Meeting with NEI to Discuss ISO 9001 and Supplemental Activities with U.S Nuclear Regulatory Staff | |
SECY-23-0089, Weekly Information Report Week Ending October 13, 2023 | | 23 October 2023 | SECY-23-0089: Weekly Information Report Week Ending October 13, 2023 | Subsequent License Renewal Power Uprate |
ML23263A001 | Palisades | 27 September 2023 | Summary of August 29, 2023, Meeting with Holtec Decommissioning International, LLC Regarding Plan to Submit an Exemption Request as Part of a Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclea | Exemption Request Environmental Justice |
ML23201A187 | | 3 August 2023 | EPRI Pearts Regulatory Update August 2023 | |
ML23221A382 | | 3 August 2023 | EPRI Pearts Regulatory Update August 2023 | Incorporated by reference |
ML23187A564 | | 20 July 2023 | Summary of the 2023 NRC Town Hall Meeting on Vendor Oversight | Pandemic COVID-19 |
ML23160A103 | | 14 June 2023 | June 2023 31st NUPIC Vendor Meeting NRC Update | Commercial Grade Dedication |
ML23156A320 | | 5 June 2023 | June 2023 NUPIC Meeting NRC Update | Commercial Grade Dedication |
ML23145A162 | Robinson 07200003 | 25 May 2023 | 0 to Updated Final Safety Analysis Report | Safe Shutdown Boric Acid Fitness for Duty High winds Shutdown Margin Ultimate heat sink Offsite Dose Calculation Manual Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Coatings Met Tower Operating Basis Earthquake Nondestructive Examination Cyber Security Emergency Lighting Incorporated by reference Finite Element Analysis Aging Management Tornado Missile Protection Design basis earthquake License Renewal Earthquake Control of Heavy Loads Turbine Missile Fuel cladding Liquid penetrant Pressure Boundary Leakage Through-Wall Leakage Fire Protection Program Power change Power Uprate Overspeed trip Loss of condenser vacuum |
ML23110A256 | Peach Bottom | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Offsite Dose Calculation Manual Internal Flooding Incorporated by reference Abnormal operational transient Scram Discharge Volume Large early release frequency Earthquake Turbine Missile Fuel cladding Accidental discharge Flow Induced Vibration |
ML23125A153 | 07109187 | 1 April 2023 | Public QSA Global, Inc., Safety Analysis Report, Revision 14 | Non-Destructive Examination Finite Element Analysis |
ML23082A057 | Nuclear Energy Institute | 28 March 2023 | Proposal to Establish Alternate Requirements for Components Commensurate with Safety and Risk | Hydrostatic |
ML23066A189 | Seabrook | 3 March 2023 | OEDO-22-00419: Email Dated 3-3-2023 to Petitioner on Seabrook ASR Petition | Functionality Assessment Significance Determination Process |
ML23020A100 | Seabrook | 3 March 2023 | OEDO-22-00419 - 2.206 Petition for Seabrook Station Structure Concrete Concerns (EPID L-2022-CRS-0000)- Closure Letter | Functionality Assessment Significance Determination Process |
ML23037A812 | | 7 February 2023 | Summary of the January 19, 2023, Public Meeting with EPRI and Stakeholders to Discuss Use of the Extremely Low Probability of Rupture Code for LOCA Frequency Estimates | Fuel cladding |
NUREG-2245, Technical Review of the 2017 Edition of ASME Code, Section III, Division 5, High Temperature Reactors | | 31 January 2023 | NUREG-2245, Technical Review of the 2017 Edition of ASME Code, Section III, Division 5, High Temperature Reactors | Hydrostatic Nondestructive Examination Incorporated by reference Finite Element Analysis Earthquake Pandemic COVID-19 Liquid penetrant Fatigue Rule Dissimilar Metal Weld Grace period |
ML23010A148 | | 26 January 2023 | NRC Update NUPIC General Membership Meeting - January 30-31, 2023 Miami, Fl | |
IR 05000346/2022011 | Davis Besse | 5 January 2023 | Triennial Fire Protection Inspection Report 05000346/2022011 | Safe Shutdown Stroke time Aging Management Missed surveillance Fire Protection Program |
ML22340A150 | Cook | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 1.0, Introduction and Summary | Safe Shutdown Boric Acid Shutdown Margin Grab sample Offsite Dose Calculation Manual Tornado Missile Probabilistic Risk Assessment Operating Basis Earthquake Incorporated by reference Tornado Generated Missile Tornado Missile Protection Design basis earthquake TORMIS Earthquake Turbine Missile Fuel cladding Pressure Boundary Leakage Fire Protection Program Power change |
AEP-NRC-2022-62, 1 to Updated Final Safety Analysis Report, Chapter 14.3, Reactor Coolant System Pipe Rupture (Loss of Coolant Accident) (Unit 1) | Cook | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.3, Reactor Coolant System Pipe Rupture (Loss of Coolant Accident) (Unit 1) | Boric Acid Shutdown Margin Loop seal Mission time Fire Barrier Hydrostatic Coatings Earthquake Fuel cladding |
ML22305A563 | Arkansas Nuclear | 28 November 2022 | Request for Withholding Information from Public Disclosure | |
ML22299A109 | | 17 November 2022 | Summary October 20, 2022, Public Comment Gathering Meeting on the U. S. Nuclear Regulatory Commission Staffs Secy-22-0076 Regarding Expansion of the Current Common-Cause-Failure Policy for Digital Instrumentation and Controls Systems | |
ML22061A253 | | 26 October 2022 | DG-1383 (RG 1.246 Rev 0) Public Comment Response | Safe Shutdown Non-Destructive Examination Incorporated by reference |
1CAN102201, Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations | Arkansas Nuclear | 13 October 2022 | Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations | Surveillance Frequency Control Program Fuel cladding |
ML22266A244 | | 28 September 2022 | Session 1 - Update on Industry Codes and Standards Initiatives | |
ML22256A017 | | 22 September 2022 | Summary of the August 24, 2022 Higher Burnup Workshop | Fuel cladding |
ML22278A212 | Limerick | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Incorporated by reference Abnormal operational transient Design basis earthquake Safeguards Contingency Plan Earthquake Fuel cladding Accidental discharge Fire Protection Program Environment Report Power Uprate Measurement Uncertainty Recapture |
ML22181A058 | Arkansas Nuclear | 15 July 2022 | Request for Withholding Information from Public Disclosure | |
ML22173A222 | | 22 June 2022 | Public Meeting Summary with EPRI to Discuss Xlpr Code for LOCA Frequency Estimates | Probabilistic Risk Assessment |
ML22136A238 | | 20 May 2022 | Public Comment Response for DG-1383 (RG 1.246 Rev 0) - for ACRS May 20, 2022 Meeting | Safe Shutdown Non-Destructive Examination Incorporated by reference |
ML22084A102 | Davis Besse | 27 March 2022 | Reissue Summary of the February 1, 2022, Regulatory Conference Between Energy Harbor, Davis-Besse Nuclear Power Station and the Nuclear Regulatory Commission | Probabilistic Risk Assessment |
ML22077A806 | Davis Besse | 23 March 2022 | Summary of the February 1, 2022, Regulatory Conference Between Energy Harbor, Davis-Besse Nuclear Power Station and the Nuclear Regulatory Commission | Probabilistic Risk Assessment |
ML22031A230 | Davis Besse | 31 January 2022 | Public Meeting Notice Amendment for Field Flash Selector Switch Preventative Maintenance Regulatory Conference | Coronavirus |
ML22020A406 | Davis Besse | 21 January 2022 | Public Meeting Notice for Field Flash Selector Switch Preventative Maintenance Regulatory Conference | Pandemic Coronavirus |
ML22012A060 | | 14 January 2022 | ADAMS Public User Group Meeting Minutes November 16, 2021 | Pandemic Coronavirus |
ML22005A023 | FitzPatrick | 5 January 2022 | Information Request for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000333/2022010 | Commercial Grade Dedication Probabilistic Risk Assessment Temporary Modification Aging Management |
ML21348A313 | | 15 December 2021 | Summary of the Observation Public Meeting to Discuss Nei'S Planned Proposal of Quality Assurance Standard ISO-9001 and Its Potential Use to Satisfy the Regulatory Requirements of Quality Assurance | Commercial Grade Dedication |
ML22042B307 | Quad Cities | 21 October 2021 | 6 to Updated Final Safety Analysis Report, Chapter 03 - Design of Structures, Components, Equipment and Systems-Redacted | Safe Shutdown High winds Shutdown Margin Non-Destructive Examination Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Incorporated by reference Finite Element Analysis Tornado-Generated Missile Tornado Missile Protection Design basis earthquake Code Reconciliation Earthquake Turbine Missile Liquid penetrant Power change Flow Induced Vibration |
ML21280A174 | | 12 October 2021 | September 15, 2021, Summary of Meeting NRC Standards Forum | |
ML21278A126 | Calvert Cliffs | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 5, Section 5.3, External Missiles, Snubbers, and Watertight Doors | High Radiation Area Tornado-Generated Missile Turbine Missile Overspeed trip |
ML21257A261 | Calvert Cliffs | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 1, Section 1.7, Identification of Contractors | |
ML21208A131 | | 28 July 2021 | Summary of the Nuclear Regulatory'S Commission 1st Town Hall Meeting on Vendor Oversight | Pandemic Coronavirus |
ML21176A055 | Saint Lucie | 29 June 2021 | Subsequent License Renewal Application - 2nd Public Meeting Summary of Pre-Submittal Meeting | Aging Management |
ML21167A243 | | 23 June 2021 | Summary of the June 2, 2021, Public Meeting with NEI and EPRI on the EPRI Approach to Licensing Higher Burnup Fuel | Probabilistic Risk Assessment |
ML21179A028 | Dresden | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems | Safe Shutdown High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Non-Destructive Examination Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Incorporated by reference Finite Element Analysis Tornado-Generated Missile Tornado Generated Missile Abnormal operational transient Tornado Missile Protection Surveillance Frequency Control Program Design basis earthquake Excess Flow Check Valve TORMIS Code Reconciliation Earthquake Control of Heavy Loads Turbine Missile Liquid penetrant Through-Wall Leakage Power change Power Uprate |
ML21139A222 | | 21 May 2021 | Public Meeting Summary Proposed Rule to Incorporate by Reference the 2019 and 2020 Editions of ASME Codes Into 10 CFR 50.55a | |
IR 05000336/2021010 | Millstone | 17 May 2021 | Design Bases Assurance Inspection (Teams) Inspection Report 05000336/2021010 and 05000423/2021010 | High winds Stroke time Commercial Grade Dedication Coatings FLEX Significance Determination Process Large early release frequency Coronavirus COVID-19 |
ML21127A218 | Saint Lucie | 11 May 2021 | Subsequent License Renewal Application - Public Meeting Summary of Pre-Submittal Meeting | Aging Management |
ML21133A080 | Limerick | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 1, Sections 1.1 Though 1.6 | Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Incorporated by reference Abnormal operational transient Design basis earthquake Safeguards Contingency Plan Earthquake Fuel cladding Accidental discharge Fire Protection Program Environment Report Power Uprate Measurement Uncertainty Recapture |