Mr. Robert Coffey Vice President, Nuclear and
& Chief Nuclear Officer Florida Power & Light Company 700 Universe Boulevard Mail Stop: EX/JB Juno Beach, FL 33408
SUBJECT:
ST. LUCIE PLANT, UNITS 1 AND 2, SUBSEQUENT LICENSE RENEWAL APPLICATION -PUBLIC MEETING
SUMMARY
OF JUNE 3, 2021, PRE-SUBMITTAL MEETING
Dear Mr. Coffey:
By Subsequent License Renewal Application Notification|letter dated March 17, 2021]] (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21076A314), Florida Power & Light company (FPL or the applicant), submitted a letter of intent to submit a subsequent license renewal application (SLRA) for St. Lucie Plant (St. Lucie), Units 1 and 2.
On April 21, 2021, the U.S. Nuclear Regulatory Commission (NRC, or the staff) held a public meeting with FPL to discuss the expected content of the upcoming submittal of the SLRA for St. Lucie. The meeting summary is available in ADAMS Accession No. ML21127A218.
On June 3, 2021, the NRC held a second public meeting with FPL to discuss the irradiation of concrete and reactor vessel supports. The slides for the applicants presentation are available in ADAMS Accession No. ML21153A052.
The NRC staff began with introducing the logistics of the public meeting, including the agenda.
FPL then began their presentation by discussing the removal schedule of the surveillance capsule. The capsule removal for Unit 1 as stated in the Final Safety Analysis Report has an approximate removal schedule as 38 effective full power years (EFPY). However, as part of the SLRA, the applicant plans to modify the capsule removal schedule out to 47 EFPY.
FPL provided an overview of the primary shield wall (PSW) design configuration of Unit 1 and 2.
The applicant continued the presentation by discussing the irradiation of concrete. Based on the applicants evaluation the PSW exposures to radiation result in minimal impact to the concrete and the PSW maintains its structural integrity under current licensing basis (CLB) loading when considering the irradiation effects through the subsequent period of extended operation (SPEO).
The applicant concluded the presentation by providing an overview of the design of the reactor pressure vessel (RPV) supports and the effect of irradiation on RPV supports. FPL is performing a qualitative assessment of Unit 1 and 2 RPV supports that will provide the technical justification to support an inspection-based approach. The assessment will support that a plant specific aging management program (AMP) or an enhancement to an existing AMP will not be required. In addition, it will conclude that the RPV supports will continue to perform their June 29, 2021
R. Coffey intended functions consistent with the CLB when considering irradiation effects through the SPEO.
There were no questions from members of the public during the public Q&A portion of the meeting.
If you have any questions, please feel free to contact me at Hector.Rodriguez-Luccioni@nrc.gov.
Sincerely, Hector Rodriguez-Luccioni, Project Manager License Renewal Projects Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation Docket Nos. 50-335 and 50-389
Enclosure:
List of Attendees Signed by Rodriguez-Luccioni, Hector on 06/29/21
- via e-mail NRR-106 OFFICE NRR/DNRL/NLRP/PM NRR/DNRL/NRLB/LA NAME HRodriguez-Luccioni SGreen DATE 06/24/2021 06/28/21 OFFICE NRR/DNRL/NLRP/BC NRR/DNRL/NLRP/PM NAME LGibson HRodriguez-Luccioni DATE 6/28/2021 6/29/2021
Enclosure List of Attendees All attendees participated remotely.
NRC Attendees:
Allen Hiser Andrew Prinaris Angela Wu Ashley Smith Ata Istar Benjamin Parks Bill Rogers Bob Caldwell Brandon Wise Brian Allik Brian Wittick Bryce Lehman Carolyn Fairbanks David Dijamco David Pratt David Rudland Derek Scully Duc Nguyen Fred Forsaty George Thomas Gurcharan Matharu Hari Kodali Hector Rodriguez-Luccioni Issac Anchondo-Lopez James Gavula James Medoff Jeanne Johnston Joel Jenkins John Tsao Jorge Cintron-Rivera Joseph Messina Juan Lopez Kevin Heller Lauren Gibson Leslie Terry Lois James Madhumita Sircar Marieliz Johnson Matthew McConnell Matthew Yoder Michael Benson Mo Sadollah Nageswara Karipineni Nan Chien Natreon Jordan On Yee Raul Hernandez Samantha Platt Steven Bloom Florida Power and Light Company (and Contractors) Attendees:
Basil Pagnozzi (FPL)
Benjaming Amiri (Westinghouse)
Bruce Beisler (Enercon)
Clay Corley (Enercon)
Donna Slivon (FPL)
Duygu Saydam (Enercon)
Greg Fisher (Westinghouse)
James Hamlen (Enercon)
James Wicks (Enercon)
Jay D White (Westinghouse)
Jeffrey Head (Enercon)
John T Aheam (Westinghouse)
John Daily (FPL)
JR (Jack) Hoffman (Enercon)
Katarzyna Paez (FPL)
Kevin Muggleston (FPL)
Maribel Valdez (FPL)
Mark Joseph (FPL)
Matt Brunton (Enercon)
Matt Wilkinson (Enercon)
Michael Friedman (FPL)
Megan Murphy (FPL)
Paul Atkinson (FPL)
Philip Barnes (Enercon)
Richard Orthen (FPL)
Robert Keating (MPR Associates)
Scott Boggs (FPL)
Stephen Hale (Enercon)
Stephen K Longwell (Westinghouse)
Steve Franzone (FPL)
Swadesh (Chuck) Ramdeen (FPL)
Timothy Cleary (Enercon)
Tom King (MPR Associates)
William Maher (FPL)
Wyatt Godes (FPL)
2 Public Attendees:
Charles A Tomes (Services-6)
Yann Le Pape (ORNL)
Other Attendees:
Additional unidentified members of the public and/or industry attended the meeting