Subsequent License Renewal Application - Public Meeting Summary of Pre-Submittal Meeting
ML21127A218
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 05/11/2021
From: Hector Rodriguez-Luccioni
NRC/NRR/DNRL/NLRP
To: Moul D
Florida Power & Light Co
Rodriguez-Luccioni H
References
Download: ML21127A218 (4)


Text

Mr. Don Moul Executive Vice President

& Chief Nuclear Officer Florida Power & Light Company 700 Universe Boulevard Juno Beach, FL 33408

SUBJECT:

ST. LUCIE PLANT, UNITS 1 AND 2, SUBSEQUENT LICENSE RENEWAL APPLICATION - PUBLIC MEETING

SUMMARY

OF PRE-SUBMITTAL MEETING

Dear Mr. Moul:

By Subsequent License Renewal Application Notification|letter dated March 17, 2021]] (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21076A314), Florida Power & Light Company (FPL or the applicant), submitted a letter of intent to submit a subsequent license renewal application (SLRA) for St. Lucie Plant (St. Lucie), Units 1 and 2.

On April 21, 2021, the U.S. Nuclear Regulatory Commission (NRC, or the staff) held a public meeting with FPL to discuss the expected content of the upcoming submittal of the SLRA for St. Lucie. The slides for the staff presentation are available at ADAMS Accession No. ML21106A169, and the slides for the applicants presentation are available at ADAMS Accession No. ML21111A012.

The NRC staff began with a brief overview of the subsequent license renewal (SLR) process.

The process consists of two tracks: the environmental review and the safety review. During the meeting, the staff shared a tentative review schedule. For an application submission date of August 3, 2021, the final licensing decision is estimated for March 17, 2023. For the St. Lucie SLRA, the NRC staff has incorporated process improvements and lessons learned from previous SLRA reviews, and as a result, will aim to issue one single safety evaluation report, in support of one single meeting with the Advisory Committee on Reactor Safeguards.

FPL then began their presentation with a description of St. Lucie. The St. Lucie Unit 1 entered initial period of extended operation (PEO) in March 1, 2016 and Unit 2 will enter PEO in April 6, 2023.

In the development of the St. Lucie SLRA, FPL will benchmark against other successful SLR utilities and incorporated industry license renewal operating experience. In addition, FPL will incorporate lessons learned from NextEra fleet experience. FPL will review and incorporate previous SLRA request for additional information from Turkey Point, Peach Bottom and Surry.

In support of the NRC review, the applicant will populate an e-Portal that will include a folder for each of the aging management programs (AMPs).

During the presentation, the applicant indicated that St. Lucie SLRA will incorporate the following NRCs interim staff guidance: SLR-ISG-2021-02-Mechanical, Updated AGING Management Criteria for Mechanical Portions of Subsequent License Renewal Guidance May 11, 2021

D. Moul (ADAMS Accession No. ML20181A434); SLR-ISG-2021-04-Electrical, Updated Aging Management Criteria for Electrical Portions of Subsequent License Renewal Guidance (ADAMS Accession No. ML20181A395); SLR-ISG-2021-03-Structures, Updated Aging Management Criteria for Structures Portions of Subsequent License Renewal Guidance ISG (ADAMS Accession No. ML20181A381); SLR-ISG-2021-01-PWRVI, Updated Aging Management Criteria for Reactor Vessel Internal Components for Pressurized-Water Reactors (ADAMS Accession No. ML20217L203).

FPL shared that the scoping and screening and aging management review aspects were conducted using a methodology that is consistent with current standards, Nuclear Energy Institute (NEI) 17-01 and 95-10, R6, App. F. The applicant stated that St. Lucie will have aging management review line items consistent with the Generic Aging Lessons-Learned Report (GALL-SLR, Volumes 1 and 2, ADAMS Accession Nos. ML17187A031 and ML17187A204).

St. Lucie is expected to have a total of 48 (AMPs), all of which were developed to maximize consistency with the GALL-SLR. Of the 48 AMPs, 36 are existing while 12 are new and not a part of their initial license renewal. A total of 16 AMPs expected to be consistent with the GALL-SLR, 27 AMPs expected to be consistent with enhancements, and 4 AMPs expected to be consistent with exceptions and enhancements. St. Lucie is expected to have one plant-specific AMP.

The applicant provided an overview table of the St. Lucie time limited aging analyses (TLAAs).

The applicant does not plan on submitting any topical reports, but the St. Lucie SLRA will contain proprietary information that will be classified properly upon submission. The proprietary information will be submitted as enclosures to the application. The presentation ended with a detailed discussion on the reactor vessel (RV) internals, irradiation of concrete and irradiation of RV supports.

The applicant concluded the meeting by mentioning that they would like to schedule an additional safety pre-application meeting around mid-May or early June, to have further discussion on the irradiation of concrete and reactor vessel supports. FPL also mentioned that they would like to have an environmental pre-application meeting.

There were no questions from members of the public during the public Q&A portion of the meeting.

If you have any questions, please feel free to contact me at Hector.Rodriguez-Luccioni@nrc.gov.

Sincerely, Hector Rodriguez-Luccioni, Project Manager License Renewal Projects Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation Docket Nos. 50-335 and 50-389

Enclosure:

List of Attendees Signed by Rodriguez-Luccioni, Hector on 05/11/21

D. Moul

SUBJECT:

ST. LUCIE PLAN, UNITS 1 AND 2, SUBSEQUENT LICENSE RENEWAL APPLICATION - PUBLIC MEETING

SUMMARY

OF PRE-SUBMITTAL MEETING DATED MAY 11, 2021 DISTRIBUTION:

E-MAIL PUBLIC RidsNrrDnrl Resource RidsNrrPMOconee Resource HRodriguez-Luccioni, NRR/DNRL LJames, NRR/DNRL LGibson, NRR/DNRL RElliott, NMSS/REFS LRakovan, NMSS/REFS ABradford, NRR/DNRL BCaldwell, NRR/DNRL NJordan, NRR/DORL UShoop, NRR/DORL DRoth, OGC MMcCoppin, OEDO SBurnell, HQ/OPA LWilkins, OCA DMcIntyre, HQ/OPA RHannah, RII/OPA JPelchat, RII/FCO ELea, RII/FCO JNadel, RII/DRP JBaptist, RII/DRS ADAMS Accession Number: ML21127A218 NRR-106 OFFICE NRR/DNRL/NLRP/PM NRR/DNRL/NLRP/LA NAME HRodriguez-Luccioni YEdmonds DATE 05/7/2021 05/11/2021 OFFICE NRR/DNRL/NLRP/BC NRR/DNRL/NLRP/PM NAME LGibson HRodriguez-Luccioni DATE 05/11/2021 05/11/2021 OFFICIAL RECORD COPY

Enclosure List of Attendees All attendees participated remotely. Those with an asterisk (*) presented.

NRC Attendees:

Allen Hiser Andrew Johnson Andrew Prinaris Angela Wu Brian Allik Carolyn Fairbanks Christopher Sydnor Dan Widrevitz David Pratt David Rudland George Thomas Hector Rodriguez-Luccioni*

Issac Anchondo-Lopez James Gavula James Medoff Jeff Mitchell Joseph Colaccino Keith Hoffman Lance Rakovan Lauren Gibson Leslie Terry Lois James Lynnea Wilkins Marieliz Johnson Mat Burton Matthew Yoder Michael Benson Natreon Jordan On Yee Roger Kalikian Seung Min Steven Bloom Steve Jones Florida Power and Light Company (and Contractors) Attendees:

Amit Kalia Andrew E Hawk (Westinghouse)

Anthony Ploplis (Enercon)

Basil Pagnozzi (FPL)

Bruce Beisler (Enercon)

Clay Corley (Enercon)

Duygu Saydam (Enercon)

James Hamlen (Enercon)

James Wicks (Enercon)

Jay D White (Westinghouse)

Jeffrey Head (Enercon)

John T Aheam (Westinghouse)

John Daily (FPL)

JR (Jack) Hoffman (Enercon)*

Katarzyna Paez (FPL)

Kevin Muggleston (FPL)

Maribel Valdez (FPL)*

Mark Joseph (FPL)

Matt Wilkinson (Enercon)

Michael Friedman (FPL)

Mitch McFarland (Enercon)

Paul Atkinson (FPL)

Philip Barnes (Enercon)

Richard Orthen (FPL)

Scott Boggs (FPL)*

Shane (Chris) Webb (FPL)

Stephen Hale (Enercon)*

Stephen K Longwell (Westinghouse)

Steve Franzone (FPL)*

Steven Cornell (Enercon)

Swadesh (Chuck) Ramdeen (FPL)

Timothy Cleary (Enercon)

William Maher (FPL)

Public Attendees:

Eric A Blocher (Services-6)

Robert Keating (MPR Associates)

Ryan Maisel (MPR Associates)

Ramiz Gilada Tom King (MPR Associates)

Todd Evans (Luminant)

Other Attendees:

Additional unidentified members of the public and/or industry attended the meeting.