Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML21081A19230 June 2021Enclosure - USNRC-CNSC Joint Report Concerning X-Energy's Reactor Pressure Vessel Construction Code AssessmentAnticipated operational occurrence
Nondestructive Examination
Exemption Request
Tristructural Isotropic
ML21179A12028 June 2021Notification of NRC Supplemental Inspection of Action Matrix Column 3 (Degraded Performance) Inputs and Request for InformationFunctionality Assessment
Power change
ML21179C06028 June 2021Presentation - Scale/Melcor non-LWR Source Term Demonstration Project - Heat Pipe ReactorProbabilistic Risk Assessment
Fuel cladding
ML21174A03422 June 2021NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions
IR 05000416/202140122 June 2021NRC Security Inspection Report 05000416/2021401Fitness for Duty
GNRO-2021/00017, Notification of Readiness for Supplemental Inspection22 June 2021Notification of Readiness for Supplemental Inspection
ML21168A21717 June 2021GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 ReactorsFuel cladding
M210077, GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors17 June 2021GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 ReactorsFuel cladding
ML21165A13514 June 2021NRR E-mail Capture - Grand Gulf - Acceptance Review for Inserice Testing Program Relief Request VRR-GGNS-2021-1, Pressure Isolation Valve Testing Frequency
ML21158A2238 June 2021Meeting Summary for Ticap Workshop 3Probabilistic Risk Assessment
Maintenance Rule Program
ML21146A0188 June 2021Issuance of Amendments to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control ProgramProbabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
IR 05000416/20214028 June 2021Grang Gulf Nuclear Station - Security Baseline Inspection Report 05000416/2021402
ML21158A3007 June 2021Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XIIncorporated by reference
ML21158A0827 June 2021Notification of Inspection (NRC Inspection Report 05000416/2021003) and Request for InformationJob Performance Measure
GNRO-2021/00014, Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency1 June 2021Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing FrequencyMissed surveillance
Power-Operated Valves
ML21133A12218 May 2021Acknowledgment of Response to Nrc Inspection Report 05000416/2020016 and Investigation Report 4-2019-021
ML21132A29514 May 2021Summary of Public Meeting to Discuss Technology Inclusive Content of Application ProjectProbabilistic Risk Assessment
Maintenance Rule Program
ML21133A33913 May 2021Control Point Hazard
ML21131A00411 May 2021May 10, 2021, Summary of Public Meeting with Entergy Operations, Incorporated to Discuss Upcoming Relief Request to Adopt Performance-Based Testing for Pressure Isolation Valves for Grand Gulf Nuclear Station, Unit 1
ML21126A30310 May 2021Entergy Operations, Inc. Pre-Submittal Meeting - Grand Gulf Nuclear Station, Unit 1 Relief Request to Adopt Performance-based Testing for Pressure Isolation Valves (Pivs)
ML21146A2467 May 2021Lake Engineering Co., Sixth Interim Notification Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293
IR 05000416/20210015 May 2021GG2021001-IR-TS, Grand Gulf Nuclear Station - Integrated Inspection Report 05000416/2021001Ultimate heat sink
Internal Flooding
Enforcement Discretion
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Unidentified leakage
ML21099A0814 May 2021Cover Letter - NRC Feedback on Terrapower Advanced Sfr Fuel Assembly Qualification Plan
ML21119A21528 April 2021NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27
ML21119A12428 April 2021Annual Radiological Environmental Operating ReportOffsite Dose Calculation Manual
Fukushima Dai-Ichi
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Earthquake
Chernobyl
GNRO-2021/00015, Annual Radioactive Effluent Release Report28 April 2021Annual Radioactive Effluent Release ReportHigh Radiation Area
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Tritium
Power change
PMNS20210524, Notice of Meeting with Entergy Operations, Inc22 April 2021Notice of Meeting with Entergy Operations, Inc
ML21109A21419 April 2021NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Rev. Est Hours for Review of Relief Request (RR) - ASME Code RR Safety Eval with NRC-Approved Rev of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019)
GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 202019 April 2021Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020
ML21106A15116 April 2021and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations
ML21106A21616 April 2021Request to Delay Review of Relief Requests GG-ISI-020 and RBS-ISI-019
ML21106A22316 April 2021IR 2021402 Document Request List
ML21105A05215 April 2021EAL Technical Bases Document Revision 1Safe Shutdown
Unanalyzed Condition
Time of Discovery
High winds
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Cyber Security
FLEX
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Scram Discharge Volume
Process Control Program
Earthquake
Maintenance Rule Program
Fuel cladding
Pressure Boundary Leakage
Fire Protection Program
Grace period
ML21106A28414 April 2021Generic Fundamentals Examination Results March 2021Generic Fundamentals Examination
GNRO-2021/00012, Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.220613 April 2021Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.2206
ML21092A1542 April 2021GG 2020 EOC Public Meeting Summary of Public Meeting with Entergy Operations, IncCoronavirus
ML21091A1471 April 2021Annual Report for Entergy Quality Assurance Program Manual and Indian Point Energy Center Quality Assurance Program Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B toSafe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Pandemic
Fire Protection Program
Grace period
ML21272A3381 April 2021Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Versatile Test Reactor Ticap Tabletop Exercise ReportUltimate heat sink
Anticipated operational occurrence
Internal Flooding
Probabilistic Risk Assessment
Design basis earthquake
Maintenance Rule Program
Turbine Missile
Fatality