Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML21081A192 | 30 June 2021 | Enclosure - USNRC-CNSC Joint Report Concerning X-Energy's Reactor Pressure Vessel Construction Code Assessment | Anticipated operational occurrence Nondestructive Examination Exemption Request Tristructural Isotropic |
ML21179A120 | 28 June 2021 | Notification of NRC Supplemental Inspection of Action Matrix Column 3 (Degraded Performance) Inputs and Request for Information | Functionality Assessment Power change |
ML21179C060 | 28 June 2021 | Presentation - Scale/Melcor non-LWR Source Term Demonstration Project - Heat Pipe Reactor | Probabilistic Risk Assessment Fuel cladding |
ML21174A034 | 22 June 2021 | NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions | |
IR 05000416/2021401 | 22 June 2021 | NRC Security Inspection Report 05000416/2021401 | Fitness for Duty |
GNRO-2021/00017, Notification of Readiness for Supplemental Inspection | 22 June 2021 | Notification of Readiness for Supplemental Inspection | |
ML21168A217 | 17 June 2021 | GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors | Fuel cladding |
M210077, GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors | 17 June 2021 | GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors | Fuel cladding |
ML21165A135 | 14 June 2021 | NRR E-mail Capture - Grand Gulf - Acceptance Review for Inserice Testing Program Relief Request VRR-GGNS-2021-1, Pressure Isolation Valve Testing Frequency | |
ML21158A223 | 8 June 2021 | Meeting Summary for Ticap Workshop 3 | Probabilistic Risk Assessment Maintenance Rule Program |
ML21146A018 | 8 June 2021 | Issuance of Amendments to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency |
IR 05000416/2021402 | 8 June 2021 | Grang Gulf Nuclear Station - Security Baseline Inspection Report 05000416/2021402 | |
ML21158A300 | 7 June 2021 | Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
ML21158A082 | 7 June 2021 | Notification of Inspection (NRC Inspection Report 05000416/2021003) and Request for Information | Job Performance Measure |
GNRO-2021/00014, Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency | 1 June 2021 | Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency | Missed surveillance Power-Operated Valves |
ML21133A122 | 18 May 2021 | Acknowledgment of Response to Nrc Inspection Report 05000416/2020016 and Investigation Report 4-2019-021 | |
ML21132A295 | 14 May 2021 | Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project | Probabilistic Risk Assessment Maintenance Rule Program |
ML21133A339 | 13 May 2021 | Control Point Hazard | |
ML21131A004 | 11 May 2021 | May 10, 2021, Summary of Public Meeting with Entergy Operations, Incorporated to Discuss Upcoming Relief Request to Adopt Performance-Based Testing for Pressure Isolation Valves for Grand Gulf Nuclear Station, Unit 1 | |
ML21126A303 | 10 May 2021 | Entergy Operations, Inc. Pre-Submittal Meeting - Grand Gulf Nuclear Station, Unit 1 Relief Request to Adopt Performance-based Testing for Pressure Isolation Valves (Pivs) | |
ML21146A246 | 7 May 2021 | Lake Engineering Co., Sixth Interim Notification Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 | |
IR 05000416/2021001 | 5 May 2021 | GG2021001-IR-TS, Grand Gulf Nuclear Station - Integrated Inspection Report 05000416/2021001 | Ultimate heat sink Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Coronavirus COVID-19 Fire Protection Program Unidentified leakage |
ML21099A081 | 4 May 2021 | Cover Letter - NRC Feedback on Terrapower Advanced Sfr Fuel Assembly Qualification Plan | |
ML21119A215 | 28 April 2021 | NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 | |
ML21119A124 | 28 April 2021 | Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Fukushima Dai-Ichi Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Earthquake Chernobyl |
GNRO-2021/00015, Annual Radioactive Effluent Release Report | 28 April 2021 | Annual Radioactive Effluent Release Report | High Radiation Area Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Tritium Power change |
PMNS20210524, Notice of Meeting with Entergy Operations, Inc | 22 April 2021 | Notice of Meeting with Entergy Operations, Inc | |
ML21109A214 | 19 April 2021 | NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Rev. Est Hours for Review of Relief Request (RR) - ASME Code RR Safety Eval with NRC-Approved Rev of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) | |
GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 | 19 April 2021 | Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 | |
ML21106A151 | 16 April 2021 | and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations | |
ML21106A216 | 16 April 2021 | Request to Delay Review of Relief Requests GG-ISI-020 and RBS-ISI-019 | |
ML21106A223 | 16 April 2021 | IR 2021402 Document Request List | |
ML21105A052 | 15 April 2021 | EAL Technical Bases Document Revision 1 | Safe Shutdown Unanalyzed Condition Time of Discovery High winds Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Stroke time Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Cyber Security FLEX Pressure and Temperature Limits Report Surveillance Frequency Control Program Scram Discharge Volume Process Control Program Earthquake Maintenance Rule Program Fuel cladding Pressure Boundary Leakage Fire Protection Program Grace period |
ML21106A284 | 14 April 2021 | Generic Fundamentals Examination Results March 2021 | Generic Fundamentals Examination |
GNRO-2021/00012, Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.2206 | 13 April 2021 | Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.2206 | |
ML21092A154 | 2 April 2021 | GG 2020 EOC Public Meeting Summary of Public Meeting with Entergy Operations, Inc | Coronavirus |
ML21091A147 | 1 April 2021 | Annual Report for Entergy Quality Assurance Program Manual and Indian Point Energy Center Quality Assurance Program Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to | Safe Shutdown Non-Destructive Examination Coatings Temporary Modification Process Control Program Pandemic Fire Protection Program Grace period |
ML21272A338 | 1 April 2021 | Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Versatile Test Reactor Ticap Tabletop Exercise Report | Ultimate heat sink Anticipated operational occurrence Internal Flooding Probabilistic Risk Assessment Design basis earthquake Maintenance Rule Program Turbine Missile Fatality |