 Issue dateTitleTopic
ML18331A21621 December 2018Issuance of Alternative Requests Related to the Fifth Inservice Inspection IntervalHydrostatic
Nondestructive Examination
Incorporated by reference
ML18355B01421 December 2018Beyond Nuclear'S Reply to Exelon'S and NRC Staff'S Oppositions to Hearing Request and Petition to InterveneAging Management
License Renewal
Subsequent License Renewal
ML18346A50021 December 2018Issuance of Relief Request Use of ASME Code Case N-513-3 in Lieu of Specific ASME Code RequirementsThrough-Wall Leak
ML18354B06120 December 2018Response to NRC Request for Additional Information, Dated November 23, 2018, Regarding the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application, Environmental Requests for Additional Information
ML18354B06620 December 2018Summary of Monitoring Well Installation DetailsGrab sample
Offsite Dose Calculation Manual
Zebra Mussel
FLEX
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Biofouling
IR 05000277/201801120 December 2018Post-Approval Site Inspection for License Renewal - Phase 4 Inspection Report 05000277/2018011 and 05000278/2018011Aging Management
License Renewal
ML18347B31419 December 2018Bwrvip/Asme Relief Request Discussion December 19, 2018
ML18348B26214 December 2018NRC Staff Answer to Beyond Nuclear, Inc.'S Hearing Request and Petition to InterveneIncorporated by reference
Condition Adverse to Quality
Aging Management
License Renewal
Subsequent License Renewal
Affidavit
ML18348B24614 December 2018Notice of Appearance for Kayla Gamin on Behalf of NRC Staff
ML18352A75214 December 2018Surveillance Capsule Test Results ReportPressure and Temperature Limits Report
ML18348B13314 December 2018Notices of Appearance for David Lewis, Anne Leidich and Donald Ferraro on Behalf of Exelon
ML18348B19114 December 2018Notice of Appearance of Mitzi a Young on Behalf of NRC Staff
ML18348B04914 December 2018Exelon'S Answer Opposing Beyond Nuclear Inc.'S Hearing Request and Petition to InterveneIncorporated by reference
Aging Management
License Renewal
Subsequent License Renewal
Affidavit
IR 05000277/201800213 December 2018Errata for Peach Bottom Atomic Power Station - Integrated Inspection Report 05000277/2018002 and 05000278/2018002 and Independent Spent Fuel Storage Installation Report 07200029/2018002Safe Shutdown
Stroke time
Enforcement Discretion
Functionality Assessment
Condition Adverse to Quality
Aging Management
Significance Determination Process
Operability Determination
Fire Protection Program
Scaffolding
Downpower
ML18348B02913 December 2018Subsequent License Renewal Severe Accident Mitigation Alternatives Requests for Additional InformationInternal Flooding
Probabilistic Risk Assessment
Large early release frequency
ML18345A15811 December 2018NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Request to Use ASME Code Cases N-878 and N-880Nondestructive Examination
IR 05000277/201801311 December 2018EA-18-107, Peach Bottom Atomic Power Station-Final Significance Determination for a White Finding W/Assessment follow-up and Notice of Violation-Inspection Report 05000277/2018013 and 05000278/2018013Significance Determination Process
Preliminary White Finding
ML18345A26011 December 2018Establishment of Atomic Safety and Licensing Board
ML18327A06210 December 2018Issuance of Relief Request Use of ASME Code Case N-513-4 in Lieu of Specific ASME Code RequirementsThrough-Wall Leak
Through-Wall Leakage
ML19010A3837 December 2018Additional Documents Needed for Peach Bottom SLR Environmental ReviewOffsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Biofouling
ML18341A1567 December 2018Referral Memorandum from the Secretary to the Atomic Safety and Licensing Board
ML18338A0836 December 2018EN-18-015, Issuance of Final Significance Determination and Notice of Violation, Peach Bottom Atomic Power Station (EA-18-107)Significance Determination Process
ML18340A1856 December 2018Response to Request for Additional Information License Amendment Request - Revise Technical Specifications to Allow Two Safety Relief Valves/Safety Valves to Be Out-of-Service with Increased Reactor Pressure Safety Limit
ML19007A2824 December 2018Fws to NRC, Peach Bottom Subsequent License Renewal Ipac Trust Resources List of Endangered Species, Migratory Birds, and Wetlands
ML18334A21630 November 2018Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018GOTHIC
RS-18-143, Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing Requirements29 November 2018Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing RequirementsSafe Shutdown
Fitness for Duty
Health Physics Network
Nuclear Accident Reporting System
Severe Accident Management Guideline
Minimum staff
ML18337A19629 November 2018Submittal of the Fifth Ten-Year Interval Inservice Testing Program PlanSafe Shutdown
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Stroke time
Squib
Incorporated by reference
FLEX
Scram Discharge Volume
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
Grace period
ML18337A24028 November 2018Response to Request for Additional Information - Relief Requests Associated with the Fifth Inservice Inspection Interval
ML18325A17128 November 2018Summary of Meeting with Exelon Generation Company, LLC Regarding Planned Fleet License Amendment Request to Revise Technical Specifications for High Radiation AreasHigh Radiation Area
RS-18-136, Advisement of Leadership Changes for Exelon Generation Company, LLC28 November 2018Advisement of Leadership Changes for Exelon Generation Company, LLC
ML18330A15723 November 2018Subsequent License Renewal Environmental Requests for Additional InformationOffsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Biofouling
ML18330A05321 November 2018Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000277/2019403 and 05000278/2019403Cyber Security
ML18323A75219 November 2018Attachments to Hearing RequestSafe Shutdown
Condition Adverse to Quality
Aging Management
License Renewal
Subsequent License Renewal
Fuel cladding
Through-Wall Leak
Power Uprate
ML18319A12719 November 2018Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation AreasHigh Radiation Area
Deep Dose Equivalent
ML18323A75019 November 2018Beyond Nuclear'S Hearing Request and Petition to InterveneIncorporated by reference
Aging Management
License Renewal
Subsequent License Renewal
ML18324A67415 November 2018Request for Additional Information (FINAL)- LAR to Allow 2SRV/SVs OOS at High Pressure
IR 05000277/201800313 November 2018Integrated Inspection Report 05000277/2018003 and 05000278/218003, Preliminary White Finding, and Exercise of Enforcement DiscretionHigh winds
Mission time
Offsite Dose Calculation Manual
Internal Flooding
Past operability
Enforcement Discretion
Probabilistic Risk Assessment
Functionality Assessment
FLEX
Significance Determination Process
Annual Radiological Environmental Operating Report
Large early release frequency
Operability Determination
Preliminary White Finding
Fire Protection Program
ML18312A4078 November 2018Request for Additional Information (Public) - LAR to Allow 2SRV/SVs OOS at High Pressure
ML18313A1028 November 2018Acceptance Review for Peach Bottom - Relief Request from ASME Section XI Code - 4th ISI Interval I4R-63 (Epids L-2018-LLR-0133)
ML18316A0037 November 2018Submittal of 2018 Annual Report - Guarantees of Payment of Deferred Premiums
ML18304A2006 November 2018License Renewal Severe Accident Mitigation Alternatives Audit Plan Regarding the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal ApplicationInternal Flooding
Probabilistic Risk Assessment
ML18305B3721 November 2018Order of the Secretary
ML18305B2701 November 2018Response to Request for Additional Information - License Amendment Request for Approval of Changes to Emergency Plan Staffing RequirementsMinimum staff
ML18302A2571 November 2018Correction to Amendment Nos. 321 and 324 to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems and Components (CAC Nos. MG0181 and MGO182; EPID L-2017-LLA-0281)
ML18297A17226 October 2018Summary of Meeting with Exelon Generation Company, LLC Regarding Planned License Amendment Request to Adopt TSTF-427
ML18288A19425 October 2018Summary of the Site Visit Related to the Review of the Subsequent License Renewal Application for the Peach Bottom Atomic Power Station Units 2 and 3
ML18295A74425 October 2018Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 11/06/18Shutdown Margin
Water Inventory Control
Exemption Request
Fuel cladding
Fire Protection Program
ML18263A23225 October 2018Issuance of Amendment Nos. 321 and 324 to Adopt 10 CFR 50.69 (CAC Nos. MG0181 and MG0181; EPID L-2017-LLA-0281)Safe Shutdown
High winds
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Tornado Missile Protection
Large early release frequency
Flooding Focused Evaluation
Earthquake
ML18289A37925 October 2018License Renewal Environmental Site Audit Plan Regarding the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal ApplicationOffsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
License Renewal
Subsequent License Renewal
Biofouling
Environmental Justice
ML18338A10825 October 2018Marsh USA, Inc., Certificate of Liability Insurance