MONTHYEARML18186A5452018-07-10010 July 2018 Supplemental Information Needed for Acceptance of Requests to Use ASME Code Cases N-878, N-879, and N-880 Project stage: Acceptance Review JAFP-18-0075, Proposed Alternatives to Utilize Code Cases N-878, N-879, and N-8802018-07-26026 July 2018 Proposed Alternatives to Utilize Code Cases N-878, N-879, and N-880 Project stage: Request ML18211A2552018-08-0101 August 2018 Acceptance of Request to Use ASME Code Case N-878 and N-880 Project stage: Acceptance Review ML18345A1582018-12-11011 December 2018 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Request to Use ASME Code Cases N-878 and N-880 Project stage: Other JAFP-19-0006, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-01-0808 January 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 Project stage: Response to RAI ML19116A0082019-04-24024 April 2019 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Request to Use ASME Code Cases N-878 and N-880 Project stage: Other NMP1L3279, Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants2019-05-0101 May 2019 Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants Project stage: Response to RAI JAFP-19-0057, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-06-0404 June 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 Project stage: Response to RAI ML19192A2442019-07-18018 July 2019 Proposed Alternative to Use ASME Code Cases N-878 and N-880 Project stage: Other 2019-01-08
[Table View] |
NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Request to Use ASME Code Cases N-878 and N-880ML18345A158 |
Person / Time |
---|
Site: |
Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Byron, Three Mile Island, Braidwood, Limerick, Ginna, Clinton, Quad Cities, FitzPatrick, LaSalle ![Constellation icon.png](/w/images/b/be/Constellation_icon.png) |
---|
Issue date: |
12/11/2018 |
---|
From: |
Blake Purnell Plant Licensing Branch III |
---|
To: |
Tom Loomis Exelon Corp |
---|
References |
---|
L-2018-LLR-0077 |
Download: ML18345A158 (5) |
|
Similar Documents at Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Byron, Three Mile Island, Braidwood, Limerick, Ginna, Clinton, Quad Cities, FitzPatrick, LaSalle |
---|
Category:E-Mail
MONTHYEARML24026A2922024-01-26026 January 2024 Request for Additional Information Regarding Limerick Digital Instrumentation and Controls License Amendment Request ML24024A1372024-01-24024 January 2024 NRR E-mail Capture - Final Snsb RAI Regarding FitzPatrick Amendment to Modify Safety Relief Valves Setpoint Lower Tolerance ML24017A1112024-01-17017 January 2024 NRR E-mail Capture - Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-529, Clarifyuse and Applicaion Rules, Revision 4 ML24011A2332024-01-11011 January 2024 Request for Additional Information - License Amendment Request (ML23058A064) (EPID L-2023-LLA-0026 - Three Mile Island, U2: Amendment Historic and Cultural Resources) ML24012A0492024-01-11011 January 2024 Request for Additional Information Regarding Final Response to Generic Letter 2004-02 ML24008A2622024-01-0808 January 2024 Acceptance Review Determination for Relief Request I5R-12, Concerning Installation of a FSWOL on RPV Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld ML24008A0592024-01-0808 January 2024 E-mail Dated 1-8-2024 from R. Guzman to R. Reynolds Correct TS Page 204 for License Amendment No. 250 Adoption of TSTF-505 ML23363A0302023-12-29029 December 2023 NRR E-mail Capture - Preliminary RAIs for Clinton Partial Site Release ML24002A7132023-12-29029 December 2023 Supplement - Peach Bottom Security Rule Exemption Request ISFSI Docket No. Reference (EPID L-2023-LLE-0032) (Updated) (Email) ML23352A3242023-12-18018 December 2023 Acceptance of Requested Licensing Action Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations (EPID L- 2023-LLN-0004) ML23349A0362023-12-14014 December 2023 NRR E-mail Capture - Draft Request for Additional Information Re Quad Cities Emergency Amendment Related to Unit 1 Diesel Generator Inoperability ML23339A0882023-12-0404 December 2023 NRR E-mail Capture - NRC Acceptance Review Re Dresden, Units 2 and 3 Request for Relief I5R-22 ML23338A0402023-12-0404 December 2023 NRR E-mail Capture - Ready for Clean TS Pages and Updated Review Hours for Clinton Power Station, Unit 1, Request for License Amendment to Revise Technical Specifications Section 3.8.3 ML23317A2012023-11-22022 November 2023 (External_Sender) Supplement - Byron Security Rule Exemption Request ISFSI Docket No. Reference ML23328A0132023-11-22022 November 2023 Supplement - Security Rule Exemption Request ISFSI Docket No. Reference (L-2023-LLE-0028) ML23328A0092023-11-22022 November 2023 Supplement - Dresden Security Rule Exemption Request ISFSI Docket No. Reference (EPID L-2023-LLE-0031) (Email) ML23331A9112023-11-22022 November 2023 Supplement - Peach Bottom Security Rule Exemption Request ISFSI Docket No. Reference ML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference ML23331A0062023-11-22022 November 2023 (External Sender) Supplement - Limerick Security Rule Exemption Request ISFSI Docket No. Reference ML23338A1192023-11-21021 November 2023 NRR E-mail Capture - Draft Request for Additional Information Quad Cities Relief Request I5R-26 ML23321A2012023-11-17017 November 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23312A1302023-11-0707 November 2023 Final Rci/Rai - Constellation R. E. Ginna Nuclear Power Plant - Exemption from Security Rule (EPID L-2023-LLE-0029) (Email) ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23311A2412023-11-0707 November 2023 NRR E-mail Capture - NRC Notification to the Commonwealth of Pennsylvania Re. Limerick Generating Station, Units 1 and 2 Amendment - Control Room Ventilation System Technical Specifications ML23305A2992023-11-0101 November 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 2, Relief Request I4R-24 ML23304A0192023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Limerick 1 & 2 - Exemption from Security Rule (L-2023-LLE-0026) ML23304A0202023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Byron 1 & 2 - Exemption from Security Rule (L-2023-LLE-0027) ML23304A0152023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Calvert Cliffs 1 & 2 - Exemption from Security Rule (L-2023-LLE-0033) ML23304A0222023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Braidwood 1 & 2 - Exemption from Security Rule (L-2023-LLE-0030) ML23304A0162023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - LaSalle 1 & 2 - Exemption from Security Rule (L-2023-LLE-0028) ML23304A0182023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Peach Bottom 2 & 3 - Exemption from Security Rule (L-2023-LLE-0032) ML23304A0172023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Dresden 1, 2 & 3 - Exemption from Security Rule (L-2023-LLE-0031) ML23276B4642023-10-0303 October 2023 NRR E-mail Capture - NRC Request for Additional Information Limerick TSTF-477 LAR ML23272A0602023-09-29029 September 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 1, Relief Request I4R-25 ML23268A0022023-09-22022 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23263A9932023-09-20020 September 2023 NRR E-mail Capture - Dresden Nuclear Power Station, Units 2 and 3 - Acceptance of Licensing Action Submittal Re Amendment to Adopt TSTF-564 ML23262A7432023-09-19019 September 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 Acceptance of Relief Request I5R-26 ML23261A0032023-09-15015 September 2023 NRR E-mail Capture - NRC Acceptance Review of Clinton Amendment Request to Revise Timing of Reactor Water Cleanup Isolation Valves ML23255A2872023-09-12012 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative to Use the Successive Inspection Requirements of BWRVIP-75-A ML23261C3982023-09-0808 September 2023 Acceptance Review of Amendment to Update the Fuel Handling Accident Analysis 2024-01-08
[Table view] |
Text
NRR-DMPSPEm Resource From: Purnell, Blake Sent: Tuesday, December 11, 2018 8:30 AM To: Loomis, Thomas R:(GenCo-Nuc) (thomas.loomis@exeloncorp.com)
Cc: Barstow, James:(GenCo-Nuc); Wrona, David
Subject:
Exelon Generation Company, LLC - Fleet Request to use ASME Code Cases N-878 and N-880 (EPID L-2018-LLR-0077)
Attachments: Exelon N-878 and N-880 RAI.pdf Mr. Loomis:
By application dated May 30, 2018 (Agencywide Documents Access and Management System Accession No. ML18151A028), as supplemented by letter dated July 26, 2018 (ADAMS Accession No. ML18208A345), Exelon Generation Company, LLC (Exelon, the licensee) submitted a request for a proposed alternative to the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and standards, and the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code for Braidwood Station, Units 1 and 2; Byron Station, Unit Nos. 1 and 2; Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Clinton Power Station, Unit No. 1; Dresden Nuclear Power Station, Units 2 and 3; James A. FitzPatrick Nuclear Power Plant; LaSalle County Station, Units 1 and 2; Limerick Generating Station, Units 1 and 2; Nine Mile Point Nuclear Station, Units 1 and 2; Peach Bottom Atomic Power Station, Units 2 and 3; Quad Cities Nuclear Power Station, Units 1 and 2; R. E. Ginna Nuclear Power Plant; and Three Mile Island Nuclear Station, Unit 1. The proposed alternative would allow the licensee to use ASME Code Case N-878, Alternative to QA [Quality Assurance] Program Requirements of IWA 4142,Section XI, Division 1, and N-880, Alternative to Procurement Requirements of IWA 4143 for Small Nonstandard Welded Fittings,Section XI, Division 1.
The NRC staff has reviewed the application and determined that it needs additional information to complete its review.
A response to the attached request for additional information is requested to be provided within 30 days from the date of this email. If you have any questions, please contact me at (301) 415-1380.
Sincerely, Blake Purnell, Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Docket Nos. STN 50-456, STN 50-457, STN 50-454, STN 50-455, 50-317, 50-318, 50-461, 50-237, 50-249, 50-333, 50-373, 50-374, 50-352, 50-353, 50-220, 50-410, 50-277, 50-278, 50-254, 50-265, 50-244, and 50-289 OFFICE NRR/DORL/LPL3/PM DMLR/MPHB/BC NRR/DORL/LPL3/BC NAME BPurnell SRuffin DWrona 1
DATE 12/11/18 11/13/18 11/28/18 2
Hearing Identifier: NRR_DMPS Email Number: 708 Mail Envelope Properties (BYAPR09MB2886DC1C0DE3D0BA523B45D7E6A60)
Subject:
Exelon Generation Company, LLC - Fleet Request to use ASME Code Cases N-878 and N-880 (EPID L-2018-LLR-0077)
Sent Date: 12/11/2018 8:29:55 AM Received Date: 12/11/2018 8:29:55 AM From: Purnell, Blake Created By: Blake.Purnell@nrc.gov Recipients:
"Barstow, James:(GenCo-Nuc)" <James.Barstow@exeloncorp.com>
Tracking Status: None "Wrona, David" <David.Wrona@nrc.gov>
Tracking Status: None "Loomis, Thomas R:(GenCo-Nuc) (thomas.loomis@exeloncorp.com)" <thomas.loomis@exeloncorp.com>
Tracking Status: None Post Office: BYAPR09MB2886.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2278 12/11/2018 8:29:55 AM Exelon N-878 and N-880 RAI.pdf 92638 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
REQUEST FOR ADDITIONAL INFORMATION EXELON GENERATION COMPANY, LLC ALTERNATIVE REQUEST TO USE ASME CODE CASES N-878 AND N-880 DOCKET NOS. STN 50-456, STN 50-457, STN 50-454, STN 50-455, 50-317, 50-318, 50-461, 50-237, 50-249, 50-333, 50-373, 50-374, 50-352, 50-353, 50-220, 50-410, 50-277, 50-278, 50-254, 50-265, 50-244, AND 50-289 By application dated May 30, 2018 (Agencywide Documents Access and Management System Accession No. ML18151A028), as supplemented by letter dated July 26, 2018 (ADAMS Accession No. ML18208A345), Exelon Generation Company, LLC (Exelon, the licensee) submitted a request for a proposed alternative to the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and standards, and the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code for Braidwood Station, Units 1 and 2; Byron Station, Unit Nos. 1 and 2; Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Clinton Power Station, Unit No. 1; Dresden Nuclear Power Station, Units 2 and 3; James A. FitzPatrick Nuclear Power Plant; LaSalle County Station, Units 1 and 2; Limerick Generating Station, Units 1 and 2; Nine Mile Point Nuclear Station, Units 1 and 2; Peach Bottom Atomic Power Station, Units 2 and 3; Quad Cities Nuclear Power Station, Units 1 and 2; R. E. Ginna Nuclear Power Plant; and Three Mile Island Nuclear Station, Unit 1. The proposed alternative would allow the licensee to use ASME Code Case N-878, Alternative to QA [Quality Assurance] Program Requirements of IWA-4142,Section XI, Division 1, and Code Case N-880, Alternative to Procurement Requirements of IWA-4143 for Small Nonstandard Welded Fittings,Section XI, Division 1.
The U.S. Nuclear Regulatory Commission has reviewed the application and determined that the information below is needed to complete its review.
RAI-1
Explain how the QA program will ensure that:
- a. the repair/replacement organization has the capability to perform testing and certification of unqualified source material that meets NCA-3855.5, Utilization of Unqualified Source Materials, subsubparagraphs (a)(1) through (a)(4), of the ASME BPV Code Section III;
- b. the repair/replacement organization will furnish materials that meet the requirements of paragraphs NCA-3856, Identification, Marking, and Material Control, and NCA-3862, Certification of Material, of the ASME BPV Code Section III; and
- c. the procurement of proprietary pipe fittings NPS-2 (DN 50) and smaller are furnished in accordance with the material specification and the applicable requirements of the ASME BPV Code,Section III, and the owners requirements.
RAI-2
Describe the actions Exelon will take to ensure that:
- a. the weld material procured by the owner or repair/replacement organization is from an approved material organization having a QA program that meets ASME BPV Code,Section III, Subsection NCA, or Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Facilities, to 10 CFR Part 50;
- b. the weld material is not procured as a commercial-grade item and qualified as a basic component under a commercial-grade dedication program;
- c. the weld material meets all the chemical and physical properties of ASME BPV Code, Sections II and III; and
- d. the nondestructive examination inspectors are qualified and certified for the appropriate process and to the level required by ASME BPV Code, Sections III and V.