Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML13015A27231 December 2012NEDO-33685, Rev 2, Digital I&C-ISG-06 Compliance for Columbia Generating Station Numac Power Range Neutron Monitoring Retrofit Plus Option III Stability Trip Function.Anticipated operational occurrence
Commercial Grade Dedication
MELLLA
ML13015A27331 December 2012NEDO-33698, Rev 2, Columbia Generating Station Power Range Neutron Monitoring System Design Report on Computer Integrity, Test and Calibration, and Fault DetectionTemporary Modification
ML12325A17528 December 2012Letter, Exemption from 10 CFR 50.36a(a)(2) Submittal Date Requirements for the 2012 Radioactive Effluent Release ReportOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
NRC-2012-0322, FRN, Exemption from 10 CFR 50.36a(a)(2) Submittal Date Requirements for the 2012 Radioactive Effluent Release Report21 December 2012FRN, Exemption from 10 CFR 50.36a(a)(2) Submittal Date Requirements for the 2012 Radioactive Effluent Release ReportOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
ML12325A18021 December 2012FRN, Exemption from 10 CFR 50.36a(a)(2) Submittal Date Requirements for the 2012 Radioactive Effluent Release ReportOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
GO2-12-187, Guarantee of Payment of Deferred Premium20 December 2012Guarantee of Payment of Deferred Premium
ML12345A35818 December 2012Request for Withholding Information from Public Disclosure, 9/26/12 Affidavit Executed by E.Schrull, GEH-Hitachi, GEH 10/5/12 Responses to Nrc/De/Eicb 9/5/12 Request for Additional Information
ML12229A47118 December 2012Request for Withholding Information from Public Disclosure, 6/29/12 and 10/22/12 Affidavits Executed by E. Schrull, GEH-Hitachi, NEDC-33751P, Revisions 2 and 3
ML12345A36618 December 2012Request for Withholding Information from Public Disclosure, Affidavit Dated 11/1/12 Executed by E. Schrull, GEH-Hitachi, NEDC-33789P, Revision 0
GO2-12-183, & Independent Fuel Storage Installation, Submittal of Decommissioning Cost Estimate and Decommissioning Funding Plan17 December 2012& Independent Fuel Storage Installation, Submittal of Decommissioning Cost Estimate and Decommissioning Funding PlanDecommissioning Funding Plan
Annual Radiological Environmental Operating Report
ML12348A13613 December 2012Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers
ML12352A12313 December 201260-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers
ML12347A05912 December 2012Generic Fundamentals Section of the Written Operator Licensing ExamGeneric Fundamentals Examination
ML12347A30812 December 2012Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology
ML12356A20211 December 2012Evacuation Time Estimate Analysis
ML13255A4574 December 2012Email from J. Piziali, EPA to D. Doyle, NRR NRC- Columbia Generating Station License Renewal Information
ML12328A07930 November 2012NEDO-33789, Revision 0, Numac Power Range Neutron Monitoring Components 268X1331TCG001, 268X1332TCG001, G002 268X1333TCG001, Qualification Summary for Energy Northwest (Enw) Columbia Generating Station (Cgs), Attachment 5
GO2-12-171, Proposed Alternative to Utilize Code Case N-795, Alternative Requirements for BWR Class 1 System Leakage Test Pressure Following Repair/Replacement Activities, Section XI, Division 127 November 2012Proposed Alternative to Utilize Code Case N-795, Alternative Requirements for BWR Class 1 System Leakage Test Pressure Following Repair/Replacement Activities, Section XI, Division 1VT-2
TAC:MF031927 November 2012
ML12306A33316 November 2012Summary of 10/18/12 Pre-licensing Meeting to Discuss Future License Amendment Request to Address Impacts of Remediation Activities Undertaken by Department of Energy in the Owner-Controlled Area at Columbia Generating Station
ML13255A45615 November 2012Email from K. Richards, NRR to Ridsnrrdra Resources on Exemption from the Requirements in 10 CFR 50.36a for a 12-Month Report FrequencyAnnual Radioactive Effluent Release Report
GO2-12-168, Response to Request for Additional Information Regarding 10 CFR 50.54(P)(2) Changes to the Security Plan15 November 2012Response to Request for Additional Information Regarding 10 CFR 50.54(P)(2) Changes to the Security Plan
GO2-12-166, Withdrawal of Change to Delete Revision Bars from the Footer for License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License14 November 2012Withdrawal of Change to Delete Revision Bars from the Footer for License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License
ML12229A48213 November 2012Request for Withholding Information from Public Disclosure, 6/27/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33756P, Revision 0
ML12229A49013 November 2012Request for Withholding Information from Public Disclosure, 6/12/12 Affidavit Executed by E. Schrull, GEH-Hitachi, Letter GE-MS-CT-106244-JC14
ML12229A48013 November 2012Request for Withholding Information from Public Disclosure, 6/7/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33754P, Revision 0
ML12229A47613 November 2012Request for Withholding Information from Public Disclosure, 6/7/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33753P, Revision 0
ML12328A11213 November 2012Seismic Walkdown ReportFukushima Dai-Ichi
ML12229A48313 November 2012Request for Withholding Information from Public Disclosure, 6/7/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33758P, Revision 0
ML12229A46813 November 2012Request for Withholding Information from Public Disclosure, 6/4/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33750P, Revision 0
ML12192A48113 November 2012Request for Withholding Information from Public Disclosure, Affidavits Dated 11/16/11 and 7/26/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33696P, Revisions 0 and 1
GO2-12-162, Response to Request for Additional Information Regarding License Amendment Request to Implement Prnm/Arts/Mellla12 November 2012Response to Request for Additional Information Regarding License Amendment Request to Implement Prnm/Arts/MelllaMELLLA
Affidavit
GO2-12-164, Flooding Walkdown Report12 November 2012Flooding Walkdown ReportFukushima Dai-Ichi
ML12319A47710 November 2012Flood Protection Final Report in Response to 10 CFR 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.3: FloodingSafe Shutdown
Unanalyzed Condition
Ultimate heat sink
Hydrostatic
Fukushima Dai-Ichi
Earthquake
ML12311A5066 November 2012Federal Register Notice: IA-12-044 - Order Prohibiting Involvement in NRC-Licensed ActivitiesFitness for Duty
Exemption Request
NRC-2012-0279, Federal Register Notice: IA-12-044 - Order Prohibiting Involvement in NRC-Licensed Activities6 November 2012Federal Register Notice: IA-12-044 - Order Prohibiting Involvement in NRC-Licensed ActivitiesFitness for Duty
Exemption Request
ML12307A3996 November 2012Order Prohibiting Involvement in NRC-Licensed Activities (NRC Investigation Report 4-2011-055)Fitness for Duty
Exemption Request
ML12356A20431 October 2012Kld TR-497, Rev. 1, Development of Evacuation Time Estimates, Final Report, Cover Through Page 6-7
ML12328A07831 October 2012NEDO-33751, Revision 3, Columbia Generating Station Power Range Neutron Monitoring System Reliability Analysis, Attachment 3
GO2-12-178, Kld TR-497, Rev. 1, Development of Evacuation Time Estimates, Final Report, Page 8-1 Through H-2431 October 2012Kld TR-497, Rev. 1, Development of Evacuation Time Estimates, Final Report, Page 8-1 Through H-24
ML12356A20531 October 2012Kld TR-497, Rev. 1, Development of Evacuation Time Estimates, Final Report, Page 7-1 Through 7-25
ML12356A20331 October 2012Kld TR-497, Rev. 1, Development of Evacuation Time Estimates, Final Report, Page J-1 Through N-19
GO2-12-165, Initial Seismic Walkdown Summary Report, Enclosure 230 October 2012Initial Seismic Walkdown Summary Report, Enclosure 2Safe Shutdown
Unanalyzed Condition
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
B.5.b Mitigating Strategies
Earthquake
Scaffolding
GO2-12-156, Energy Northwest'S Response to the March 12, 2012 Information Request - Communications Assessment30 October 2012Energy Northwest'S Response to the March 12, 2012 Information Request - Communications AssessmentSafe Shutdown Earthquake
FLEX
Fukushima Dai-Ichi
B.5.b Mitigating Strategies
Earthquake
TAC:MF000230 October 2012
IR 05000397/201200429 October 2012IR 05000397-12-004, on 06/23/2012 to 09/21/2012, Columbia Generating Station, Integrated Resident & Regional ReportHigh Radiation Area
Ultimate heat sink
Internal Flooding
Functionality Assessment
Significance Determination Process
Operability Determination
Maintenance Rule Program
Fuel cladding
Offsite Circuit
Fire Protection Program
Scaffolding
Substantial potential for overexposure
Overexposure
ML12300A31926 October 2012EN-12-048, Individual Order Prohibiting Involvement in NRC-Licensed Activities - Columbia Generating Station (IA-12-044)Fitness for Duty
GO2-12-149, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events25 October 2012Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External EventsFLEX
ML12311A02025 October 2012Initial Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Hardened Containment VentsSpent Fuel Pool Instrumentation
Containment Hardened Vent
GO2-12-152, Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System25 October 2012Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power SystemQualified Offsite Circuit
Open Phase Condition
Offsite Circuit