Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML13015A272 | 31 December 2012 | NEDO-33685, Rev 2, Digital I&C-ISG-06 Compliance for Columbia Generating Station Numac Power Range Neutron Monitoring Retrofit Plus Option III Stability Trip Function. | Anticipated operational occurrence Commercial Grade Dedication MELLLA |
ML13015A273 | 31 December 2012 | NEDO-33698, Rev 2, Columbia Generating Station Power Range Neutron Monitoring System Design Report on Computer Integrity, Test and Calibration, and Fault Detection | Temporary Modification |
ML12325A175 | 28 December 2012 | Letter, Exemption from 10 CFR 50.36a(a)(2) Submittal Date Requirements for the 2012 Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
NRC-2012-0322, FRN, Exemption from 10 CFR 50.36a(a)(2) Submittal Date Requirements for the 2012 Radioactive Effluent Release Report | 21 December 2012 | FRN, Exemption from 10 CFR 50.36a(a)(2) Submittal Date Requirements for the 2012 Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
ML12325A180 | 21 December 2012 | FRN, Exemption from 10 CFR 50.36a(a)(2) Submittal Date Requirements for the 2012 Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
GO2-12-187, Guarantee of Payment of Deferred Premium | 20 December 2012 | Guarantee of Payment of Deferred Premium | |
ML12345A358 | 18 December 2012 | Request for Withholding Information from Public Disclosure, 9/26/12 Affidavit Executed by E.Schrull, GEH-Hitachi, GEH 10/5/12 Responses to Nrc/De/Eicb 9/5/12 Request for Additional Information | |
ML12229A471 | 18 December 2012 | Request for Withholding Information from Public Disclosure, 6/29/12 and 10/22/12 Affidavits Executed by E. Schrull, GEH-Hitachi, NEDC-33751P, Revisions 2 and 3 | |
ML12345A366 | 18 December 2012 | Request for Withholding Information from Public Disclosure, Affidavit Dated 11/1/12 Executed by E. Schrull, GEH-Hitachi, NEDC-33789P, Revision 0 | |
GO2-12-183, & Independent Fuel Storage Installation, Submittal of Decommissioning Cost Estimate and Decommissioning Funding Plan | 17 December 2012 | & Independent Fuel Storage Installation, Submittal of Decommissioning Cost Estimate and Decommissioning Funding Plan | Decommissioning Funding Plan Annual Radiological Environmental Operating Report |
ML12348A136 | 13 December 2012 | Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers | |
ML12352A123 | 13 December 2012 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML12347A059 | 12 December 2012 | Generic Fundamentals Section of the Written Operator Licensing Exam | Generic Fundamentals Examination |
ML12347A308 | 12 December 2012 | Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology | |
ML12356A202 | 11 December 2012 | Evacuation Time Estimate Analysis | |
ML13255A457 | 4 December 2012 | Email from J. Piziali, EPA to D. Doyle, NRR NRC- Columbia Generating Station License Renewal Information | |
ML12328A079 | 30 November 2012 | NEDO-33789, Revision 0, Numac Power Range Neutron Monitoring Components 268X1331TCG001, 268X1332TCG001, G002 268X1333TCG001, Qualification Summary for Energy Northwest (Enw) Columbia Generating Station (Cgs), Attachment 5 | |
GO2-12-171, Proposed Alternative to Utilize Code Case N-795, Alternative Requirements for BWR Class 1 System Leakage Test Pressure Following Repair/Replacement Activities, Section XI, Division 1 | 27 November 2012 | Proposed Alternative to Utilize Code Case N-795, Alternative Requirements for BWR Class 1 System Leakage Test Pressure Following Repair/Replacement Activities, Section XI, Division 1 | VT-2 |
TAC:MF0319 | 27 November 2012 | ||
ML12306A333 | 16 November 2012 | Summary of 10/18/12 Pre-licensing Meeting to Discuss Future License Amendment Request to Address Impacts of Remediation Activities Undertaken by Department of Energy in the Owner-Controlled Area at Columbia Generating Station | |
ML13255A456 | 15 November 2012 | Email from K. Richards, NRR to Ridsnrrdra Resources on Exemption from the Requirements in 10 CFR 50.36a for a 12-Month Report Frequency | Annual Radioactive Effluent Release Report |
GO2-12-168, Response to Request for Additional Information Regarding 10 CFR 50.54(P)(2) Changes to the Security Plan | 15 November 2012 | Response to Request for Additional Information Regarding 10 CFR 50.54(P)(2) Changes to the Security Plan | |
GO2-12-166, Withdrawal of Change to Delete Revision Bars from the Footer for License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License | 14 November 2012 | Withdrawal of Change to Delete Revision Bars from the Footer for License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License | |
ML12229A482 | 13 November 2012 | Request for Withholding Information from Public Disclosure, 6/27/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33756P, Revision 0 | |
ML12229A490 | 13 November 2012 | Request for Withholding Information from Public Disclosure, 6/12/12 Affidavit Executed by E. Schrull, GEH-Hitachi, Letter GE-MS-CT-106244-JC14 | |
ML12229A480 | 13 November 2012 | Request for Withholding Information from Public Disclosure, 6/7/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33754P, Revision 0 | |
ML12229A476 | 13 November 2012 | Request for Withholding Information from Public Disclosure, 6/7/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33753P, Revision 0 | |
ML12328A112 | 13 November 2012 | Seismic Walkdown Report | Fukushima Dai-Ichi |
ML12229A483 | 13 November 2012 | Request for Withholding Information from Public Disclosure, 6/7/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33758P, Revision 0 | |
ML12229A468 | 13 November 2012 | Request for Withholding Information from Public Disclosure, 6/4/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33750P, Revision 0 | |
ML12192A481 | 13 November 2012 | Request for Withholding Information from Public Disclosure, Affidavits Dated 11/16/11 and 7/26/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33696P, Revisions 0 and 1 | |
GO2-12-162, Response to Request for Additional Information Regarding License Amendment Request to Implement Prnm/Arts/Mellla | 12 November 2012 | Response to Request for Additional Information Regarding License Amendment Request to Implement Prnm/Arts/Mellla | MELLLA Affidavit |
GO2-12-164, Flooding Walkdown Report | 12 November 2012 | Flooding Walkdown Report | Fukushima Dai-Ichi |
ML12319A477 | 10 November 2012 | Flood Protection Final Report in Response to 10 CFR 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.3: Flooding | Safe Shutdown Unanalyzed Condition Ultimate heat sink Hydrostatic Fukushima Dai-Ichi Earthquake |
ML12311A506 | 6 November 2012 | Federal Register Notice: IA-12-044 - Order Prohibiting Involvement in NRC-Licensed Activities | Fitness for Duty Exemption Request |
NRC-2012-0279, Federal Register Notice: IA-12-044 - Order Prohibiting Involvement in NRC-Licensed Activities | 6 November 2012 | Federal Register Notice: IA-12-044 - Order Prohibiting Involvement in NRC-Licensed Activities | Fitness for Duty Exemption Request |
ML12307A399 | 6 November 2012 | Order Prohibiting Involvement in NRC-Licensed Activities (NRC Investigation Report 4-2011-055) | Fitness for Duty Exemption Request |
ML12356A204 | 31 October 2012 | Kld TR-497, Rev. 1, Development of Evacuation Time Estimates, Final Report, Cover Through Page 6-7 | |
ML12328A078 | 31 October 2012 | NEDO-33751, Revision 3, Columbia Generating Station Power Range Neutron Monitoring System Reliability Analysis, Attachment 3 | |
GO2-12-178, Kld TR-497, Rev. 1, Development of Evacuation Time Estimates, Final Report, Page 8-1 Through H-24 | 31 October 2012 | Kld TR-497, Rev. 1, Development of Evacuation Time Estimates, Final Report, Page 8-1 Through H-24 | |
ML12356A205 | 31 October 2012 | Kld TR-497, Rev. 1, Development of Evacuation Time Estimates, Final Report, Page 7-1 Through 7-25 | |
ML12356A203 | 31 October 2012 | Kld TR-497, Rev. 1, Development of Evacuation Time Estimates, Final Report, Page J-1 Through N-19 | |
GO2-12-165, Initial Seismic Walkdown Summary Report, Enclosure 2 | 30 October 2012 | Initial Seismic Walkdown Summary Report, Enclosure 2 | Safe Shutdown Unanalyzed Condition Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi B.5.b Mitigating Strategies Earthquake Scaffolding |
GO2-12-156, Energy Northwest'S Response to the March 12, 2012 Information Request - Communications Assessment | 30 October 2012 | Energy Northwest'S Response to the March 12, 2012 Information Request - Communications Assessment | Safe Shutdown Earthquake FLEX Fukushima Dai-Ichi B.5.b Mitigating Strategies Earthquake |
TAC:MF0002 | 30 October 2012 | ||
IR 05000397/2012004 | 29 October 2012 | IR 05000397-12-004, on 06/23/2012 to 09/21/2012, Columbia Generating Station, Integrated Resident & Regional Report | High Radiation Area Ultimate heat sink Internal Flooding Functionality Assessment Significance Determination Process Operability Determination Maintenance Rule Program Fuel cladding Offsite Circuit Fire Protection Program Scaffolding Substantial potential for overexposure Overexposure |
ML12300A319 | 26 October 2012 | EN-12-048, Individual Order Prohibiting Involvement in NRC-Licensed Activities - Columbia Generating Station (IA-12-044) | Fitness for Duty |
GO2-12-149, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | 25 October 2012 | Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | FLEX |
ML12311A020 | 25 October 2012 | Initial Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Hardened Containment Vents | Spent Fuel Pool Instrumentation Containment Hardened Vent |
GO2-12-152, Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System | 25 October 2012 | Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System | Qualified Offsite Circuit Open Phase Condition Offsite Circuit |