ML12356A202

From kanterella
Jump to navigation Jump to search
Evacuation Time Estimate Analysis
ML12356A202
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/11/2012
From: Sawatzke B
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-12-178
Download: ML12356A202 (1)


Text

ENERGY B radle way z

Columbia Generating Station P.O. Box 968, PE08 NORTHW EST Richland, WA 99352-0968 Ph. 509.377.43001 F. 509.377.4150 bjsawatzke @energy-northwest.com 10 CFR 50.4 December 11, 2012 10 CFR 50- Appendix E,Section IV.4 G02-12-178 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397, EVACUATION TIME ESTIMATE ANALYSIS

Dear Sir or Madam:

Enclosed is the revised Columbia Generating Station Evacuation Time Estimate (ETE)

Analysis. The analysis was prepared using data from the 2010 census.

The enclosure provides the ETE.

There are no new or revised commitments in this letter.

Should you have any questions or desire additional information regarding these matters, please contact RW (AJ) Fahnestock (509) 377-8117.

Respectfully, Vice President, Nuclear Generation & Chief Nuclear Officer

Enclosure:

Columbia Generating Station Development of Evacuation Time Estimates cc:

NRC Region IV Administrator NRC NRR Project Manager NRC Sr. Resident Inspector / 988C AJ Rapacz, BPA / 1399 WA Horin - Winston & Strawn Director - Spent Fuel Storage & Transportation, NMSS