 Issue dateTitleTopic
ML08346017331 December 2008Issuance of Amendment No. 202 and 203 Increase the Completion Times for Required Actions Related to Technical Specifications 3.5.2, the ECCS, and 3.6.6, CS & CS (Tac MD7512 & MD7513)Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Fuel cladding
ML11166A15131 December 2008Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat ShockVeliger
Biofouling
DCL-10-083, Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat Shock31 December 2008Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat ShockVeliger
Biofouling
ML11166A16931 December 2008CEC-1304 Schedule 3 Part a, Environmental Information Related to Water Supply and Water/Wastewater Discharge Annual Report
DCL-10-083, CEC-1304 Schedule 3 Part a, Environmental Information Related to Water Supply and Water/Wastewater Discharge Annual Report31 December 2008CEC-1304 Schedule 3 Part a, Environmental Information Related to Water Supply and Water/Wastewater Discharge Annual Report
ML08366020430 December 2008IR 05000275-08-008; 05000323-08-008; 11/10/08 - 11/20/08; Diablo Canyon Power Plant: Identification and Resolution of ProblemsBoric Acid
Significance Determination Process
ML08329060923 December 2008Issuance of Amendment Nos. 201 and 202, Adoption of Changes to Standard Technical Specifications Under Technical Specifications Task Force (TSTF)-448Safe Shutdown
Surveillance Frequency Control Program
Safeguards Contingency Plan
Earthquake
Control of Heavy Loads
Recently irradiated fuel
DCL-08-547, Notification of Intent to Perform Seawater System Rhodamine Dye Testing at Pacific Gas & Electric, Company23 December 2008Notification of Intent to Perform Seawater System Rhodamine Dye Testing at Pacific Gas & Electric, Company
ML08345003522 December 2008Humbolt Bay Power Plant, Unit 3 - Approval to Use Effective Dose Equivalent Weighting Factors for External Radiation ExposureDeep Dose Equivalent
ML08317065219 December 2008Evaluation of the Request for an Extension of Enforcement Policy for Fire Protection Issues During Transition to National Fire Protection Standard NFPA 805Enforcement Discretion
Probabilistic Risk Assessment
Operator Manual Action
Fire Protection Program
ML09072051617 December 2008Email from Pacific Gas and Electric Regarding Seismic Action Plan (ME0174 and ME0175)
ML08354026117 December 2008Shoreline Fault Characterization Schedule
ML08354026617 December 2008Shoreline Fault StudyEarthquake
DCL-08-106, Response to NRC RAI Regarding License Amendment Request 08-02, Revision to Technical Specifications 3.7.5, 'Auxiliary Feedwater System,' and 3.7.6, 'Condensate Storage Tank and Fire Water Storage Tank16 December 2008Response to NRC RAI Regarding License Amendment Request 08-02, Revision to Technical Specifications 3.7.5, 'Auxiliary Feedwater System,' and 3.7.6, 'Condensate Storage Tank and Fire Water Storage Tank
ML0834304895 December 2008Humbold Bay, Unit 3, Weighting Factors RAI Response Email
ML0834305175 December 2008Humbold Bay, Unit 3, Weighting Factors RAI Response, SE InputDeep Dose Equivalent
ML0834002824 December 2008Acceptance Review E-mail
DCL-08-103, ASME Section XI Inservice Inspection Program Relief Request NDE-Leak Path for the Unit 1, Fifteenth Refueling Outage, Third Ten-Year Inspection Interval to Allow Use of the Rules of the NRC First Revised Order, EA-03-009.4 December 2008ASME Section XI Inservice Inspection Program Relief Request NDE-Leak Path for the Unit 1, Fifteenth Refueling Outage, Third Ten-Year Inspection Interval to Allow Use of the Rules of the NRC First Revised Order, EA-03-009.Boric Acid
TAC:ME02004 December 2008
DCL-2008-557, National Marine Fisheries Service Marine Mammal and Marine Turtle Report for Dead Californian Sea Lion Discovered in Diablo Canyon Power Plant Intake Structure26 November 2008National Marine Fisheries Service Marine Mammal and Marine Turtle Report for Dead Californian Sea Lion Discovered in Diablo Canyon Power Plant Intake Structure
ML09082014026 November 2008Yong Li Preliminary Conclusions Regarding New Shoreline FaultEarthquake
DCL-08-100, Supplement to License Amendment Request 07-03, Revision to Technical Specification 3.7.10, Control Room Ventilation System (CRVS)25 November 2008Supplement to License Amendment Request 07-03, Revision to Technical Specification 3.7.10, Control Room Ventilation System (CRVS)Recently irradiated fuel
TAC:MD770725 November 2008
ML09070052521 November 2008Summary of Conference Call Held on November 21, 2009 Prepared by Pacific Gas and Electric CompanyEarthquake
ML09069029421 November 2008Meeting Slide, Spectra 6.5 Slide from Pacific Gas and Electric Regarding License Amendment Request Re AFW System and CST, Diablo Canyon Power Plant, Unit Nos. 1 and 2
ML09069024221 November 2008Email from Pacific Gas and Electric Regarding Spectra 6.5 Slide, License Amendment Request Re AFW System and CST
ML09069020921 November 2008Meeting Slides, Summary of Preliminary Findings from the Usgs/Pg&E Hazard Studies for the Central Coastal California Region, Diablo Canyon Power Plant, Unit Nos. 1 and 2, from Pacific Gas & ElectricEarthquake
ML09069019820 November 2008Email from Pacific Gas & Electric Regarding Preliminary Data for Seismic Discussion
DCL-08-097, Submittal of Revision 4 to Emergency Plan Update19 November 2008Submittal of Revision 4 to Emergency Plan UpdateReactor Vessel Water Level
Fuel cladding
Minimum staff
DCL-08-096, Emergency Plan Implementing Procedure Update19 November 2008Emergency Plan Implementing Procedure Update
DCL-08-099, Response to Request for Additional Information, Application to Use Weighting Factors for Effective Dose Equivalent18 November 2008Response to Request for Additional Information, Application to Use Weighting Factors for Effective Dose Equivalent
DCL-08-098, Supplement Response to Request for Additional Information on License Amendment Request 07-05, Revision to Technical Specification 3.5.2 - Increase in Completion Time for Emergency Core Cooling System from 72 Hours to 14.18 November 2008Supplement Response to Request for Additional Information on License Amendment Request 07-05, Revision to Technical Specification 3.5.2 - Increase in Completion Time for Emergency Core Cooling System from 72 Hours to 14.Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Severe Accident Management Guideline
Earthquake
ML08317043010 November 2008Closure of Investigation (OI 4-2008-028)
DCL-08-093, Response to NRC Request for Additional Information Regarding License Amendment Request 08-02, Revision to Technical Specifications 3.7.5, 'Auxiliary Feedwater System,' and 3.7.6, 'Condensate Storage Tank and Fire Water..6 November 2008Response to NRC Request for Additional Information Regarding License Amendment Request 08-02, Revision to Technical Specifications 3.7.5, 'Auxiliary Feedwater System,' and 3.7.6, 'Condensate Storage Tank and Fire Water..
ML0906904324 November 2008Unit Nos.1 and 2 - Email Request for Additional Information Re License Amendment Request
IR 05000275/20080043 November 2008IR 05000275-08-004, 05000323-08-004; 7/1/08 - 9/30/08; Diablo Canyon Power Plant Units 1 and 2; Equipment Alignment, Fire Protection, and Operability EvaluationsBoric Acid
Water Inventory Control
Temporary Modification
Significance Determination Process
Operability Determination
Pressure Boundary Leakage
Fire Protection Program
Operability Assessment
Unidentified leakage
DCL-08-094, Response to Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors3 November 2008Response to Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water ReactorsLoop seal
Mission time
ML08241026230 October 2008Issuance of Amendment Nos. 200 and 201, Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk-Informed Initiative 5b)High winds
Shutdown Margin
High Radiation Area
Hydrostatic
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
Recently irradiated fuel
Offsite Circuit
Backfit
Power change
ML08290027428 October 2008Closeout of Generic Letter 2007 - 01 Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients
TAC:MD432128 October 2008
ML08297053823 October 2008M081023-Affirmation Session: I. SECY-08-0120 - Pacific Gas and Electric Co. (Diablo Canyon Isfsi), Docket No. 72-26-ISFSI, Decision on the Merits of San Luis Obispo Mothers for Peace'S Contention 2
ML08280034222 October 2008Audit of Pacific Gas and Electric Company'S Management of Regulatory Commitments (TACs MD9667 and MD9668)Weld Overlay
TAC:MD966722 October 2008
ML11166A26521 October 2008Environmental Engineering Procedure - Storm Water Management
DCL-10-083, Diablo Canyon, Units 1 &2, Environmental Engineering Procedure - Storm Water Management21 October 2008Diablo Canyon, Units 1 &2, Environmental Engineering Procedure - Storm Water Management
ML08295008020 October 2008E-mail, Humbolt and Diablo Canyon Rais for Use of Weighting Factors for EdeDeep Dose Equivalent
DCL-08-549, Third Quarter 2008 Report on Discharge Monitoring at Diablo Canyon Power Plant16 October 2008Third Quarter 2008 Report on Discharge Monitoring at Diablo Canyon Power Plant
DCL-08-088, Request for Extension of Enforcement Discretion and Revised Submittal Date for 10 CFR 50.48(c) (NFPA 805) License Amendment Request15 October 2008Request for Extension of Enforcement Discretion and Revised Submittal Date for 10 CFR 50.48(c) (NFPA 805) License Amendment RequestSafe Shutdown
Enforcement Discretion
Probabilistic Risk Assessment
Operator Manual Action
Fire Protection Program
TAC:ME007515 October 2008
DCL-08-090, Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems14 October 2008Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray SystemsMission time
Past operability