Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML083460173 | 31 December 2008 | Issuance of Amendment No. 202 and 203 Increase the Completion Times for Required Actions Related to Technical Specifications 3.5.2, the ECCS, and 3.6.6, CS & CS (Tac MD7512 & MD7513) | Internal Flooding Probabilistic Risk Assessment Large early release frequency Fuel cladding |
ML11166A151 | 31 December 2008 | Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat Shock | Veliger Biofouling |
DCL-10-083, Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat Shock | 31 December 2008 | Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat Shock | Veliger Biofouling |
ML11166A169 | 31 December 2008 | CEC-1304 Schedule 3 Part a, Environmental Information Related to Water Supply and Water/Wastewater Discharge Annual Report | |
DCL-10-083, CEC-1304 Schedule 3 Part a, Environmental Information Related to Water Supply and Water/Wastewater Discharge Annual Report | 31 December 2008 | CEC-1304 Schedule 3 Part a, Environmental Information Related to Water Supply and Water/Wastewater Discharge Annual Report | |
ML083660204 | 30 December 2008 | IR 05000275-08-008; 05000323-08-008; 11/10/08 - 11/20/08; Diablo Canyon Power Plant: Identification and Resolution of Problems | Boric Acid Significance Determination Process |
ML083290609 | 23 December 2008 | Issuance of Amendment Nos. 201 and 202, Adoption of Changes to Standard Technical Specifications Under Technical Specifications Task Force (TSTF)-448 | Safe Shutdown Surveillance Frequency Control Program Safeguards Contingency Plan Earthquake Control of Heavy Loads Recently irradiated fuel |
DCL-08-547, Notification of Intent to Perform Seawater System Rhodamine Dye Testing at Pacific Gas & Electric, Company | 23 December 2008 | Notification of Intent to Perform Seawater System Rhodamine Dye Testing at Pacific Gas & Electric, Company | |
ML083450035 | 22 December 2008 | Humbolt Bay Power Plant, Unit 3 - Approval to Use Effective Dose Equivalent Weighting Factors for External Radiation Exposure | Deep Dose Equivalent |
ML083170652 | 19 December 2008 | Evaluation of the Request for an Extension of Enforcement Policy for Fire Protection Issues During Transition to National Fire Protection Standard NFPA 805 | Enforcement Discretion Probabilistic Risk Assessment Operator Manual Action Fire Protection Program |
ML090720516 | 17 December 2008 | Email from Pacific Gas and Electric Regarding Seismic Action Plan (ME0174 and ME0175) | |
ML083540261 | 17 December 2008 | Shoreline Fault Characterization Schedule | |
ML083540266 | 17 December 2008 | Shoreline Fault Study | Earthquake |
DCL-08-106, Response to NRC RAI Regarding License Amendment Request 08-02, Revision to Technical Specifications 3.7.5, 'Auxiliary Feedwater System,' and 3.7.6, 'Condensate Storage Tank and Fire Water Storage Tank | 16 December 2008 | Response to NRC RAI Regarding License Amendment Request 08-02, Revision to Technical Specifications 3.7.5, 'Auxiliary Feedwater System,' and 3.7.6, 'Condensate Storage Tank and Fire Water Storage Tank | |
ML083430489 | 5 December 2008 | Humbold Bay, Unit 3, Weighting Factors RAI Response Email | |
ML083430517 | 5 December 2008 | Humbold Bay, Unit 3, Weighting Factors RAI Response, SE Input | Deep Dose Equivalent |
ML083400282 | 4 December 2008 | Acceptance Review E-mail | |
DCL-08-103, ASME Section XI Inservice Inspection Program Relief Request NDE-Leak Path for the Unit 1, Fifteenth Refueling Outage, Third Ten-Year Inspection Interval to Allow Use of the Rules of the NRC First Revised Order, EA-03-009. | 4 December 2008 | ASME Section XI Inservice Inspection Program Relief Request NDE-Leak Path for the Unit 1, Fifteenth Refueling Outage, Third Ten-Year Inspection Interval to Allow Use of the Rules of the NRC First Revised Order, EA-03-009. | Boric Acid |
TAC:ME0200 | 4 December 2008 | ||
DCL-2008-557, National Marine Fisheries Service Marine Mammal and Marine Turtle Report for Dead Californian Sea Lion Discovered in Diablo Canyon Power Plant Intake Structure | 26 November 2008 | National Marine Fisheries Service Marine Mammal and Marine Turtle Report for Dead Californian Sea Lion Discovered in Diablo Canyon Power Plant Intake Structure | |
ML090820140 | 26 November 2008 | Yong Li Preliminary Conclusions Regarding New Shoreline Fault | Earthquake |
DCL-08-100, Supplement to License Amendment Request 07-03, Revision to Technical Specification 3.7.10, Control Room Ventilation System (CRVS) | 25 November 2008 | Supplement to License Amendment Request 07-03, Revision to Technical Specification 3.7.10, Control Room Ventilation System (CRVS) | Recently irradiated fuel |
TAC:MD7707 | 25 November 2008 | ||
ML090700525 | 21 November 2008 | Summary of Conference Call Held on November 21, 2009 Prepared by Pacific Gas and Electric Company | Earthquake |
ML090690294 | 21 November 2008 | Meeting Slide, Spectra 6.5 Slide from Pacific Gas and Electric Regarding License Amendment Request Re AFW System and CST, Diablo Canyon Power Plant, Unit Nos. 1 and 2 | |
ML090690242 | 21 November 2008 | Email from Pacific Gas and Electric Regarding Spectra 6.5 Slide, License Amendment Request Re AFW System and CST | |
ML090690209 | 21 November 2008 | Meeting Slides, Summary of Preliminary Findings from the Usgs/Pg&E Hazard Studies for the Central Coastal California Region, Diablo Canyon Power Plant, Unit Nos. 1 and 2, from Pacific Gas & Electric | Earthquake |
ML090690198 | 20 November 2008 | Email from Pacific Gas & Electric Regarding Preliminary Data for Seismic Discussion | |
DCL-08-097, Submittal of Revision 4 to Emergency Plan Update | 19 November 2008 | Submittal of Revision 4 to Emergency Plan Update | Reactor Vessel Water Level Fuel cladding Minimum staff |
DCL-08-096, Emergency Plan Implementing Procedure Update | 19 November 2008 | Emergency Plan Implementing Procedure Update | |
DCL-08-099, Response to Request for Additional Information, Application to Use Weighting Factors for Effective Dose Equivalent | 18 November 2008 | Response to Request for Additional Information, Application to Use Weighting Factors for Effective Dose Equivalent | |
DCL-08-098, Supplement Response to Request for Additional Information on License Amendment Request 07-05, Revision to Technical Specification 3.5.2 - Increase in Completion Time for Emergency Core Cooling System from 72 Hours to 14. | 18 November 2008 | Supplement Response to Request for Additional Information on License Amendment Request 07-05, Revision to Technical Specification 3.5.2 - Increase in Completion Time for Emergency Core Cooling System from 72 Hours to 14. | Internal Flooding Probabilistic Risk Assessment Large early release frequency Severe Accident Management Guideline Earthquake |
ML083170430 | 10 November 2008 | Closure of Investigation (OI 4-2008-028) | |
DCL-08-093, Response to NRC Request for Additional Information Regarding License Amendment Request 08-02, Revision to Technical Specifications 3.7.5, 'Auxiliary Feedwater System,' and 3.7.6, 'Condensate Storage Tank and Fire Water.. | 6 November 2008 | Response to NRC Request for Additional Information Regarding License Amendment Request 08-02, Revision to Technical Specifications 3.7.5, 'Auxiliary Feedwater System,' and 3.7.6, 'Condensate Storage Tank and Fire Water.. | |
ML090690432 | 4 November 2008 | Unit Nos.1 and 2 - Email Request for Additional Information Re License Amendment Request | |
IR 05000275/2008004 | 3 November 2008 | IR 05000275-08-004, 05000323-08-004; 7/1/08 - 9/30/08; Diablo Canyon Power Plant Units 1 and 2; Equipment Alignment, Fire Protection, and Operability Evaluations | Boric Acid Water Inventory Control Temporary Modification Significance Determination Process Operability Determination Pressure Boundary Leakage Fire Protection Program Operability Assessment Unidentified leakage |
DCL-08-094, Response to Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors | 3 November 2008 | Response to Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors | Loop seal Mission time |
ML082410262 | 30 October 2008 | Issuance of Amendment Nos. 200 and 201, Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk-Informed Initiative 5b) | High winds Shutdown Margin High Radiation Area Hydrostatic Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency Recently irradiated fuel Offsite Circuit Backfit Power change |
ML082900274 | 28 October 2008 | Closeout of Generic Letter 2007 - 01 Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients | |
TAC:MD4321 | 28 October 2008 | ||
ML082970538 | 23 October 2008 | M081023-Affirmation Session: I. SECY-08-0120 - Pacific Gas and Electric Co. (Diablo Canyon Isfsi), Docket No. 72-26-ISFSI, Decision on the Merits of San Luis Obispo Mothers for Peace'S Contention 2 | |
ML082800342 | 22 October 2008 | Audit of Pacific Gas and Electric Company'S Management of Regulatory Commitments (TACs MD9667 and MD9668) | Weld Overlay |
TAC:MD9667 | 22 October 2008 | ||
ML11166A265 | 21 October 2008 | Environmental Engineering Procedure - Storm Water Management | |
DCL-10-083, Diablo Canyon, Units 1 &2, Environmental Engineering Procedure - Storm Water Management | 21 October 2008 | Diablo Canyon, Units 1 &2, Environmental Engineering Procedure - Storm Water Management | |
ML082950080 | 20 October 2008 | E-mail, Humbolt and Diablo Canyon Rais for Use of Weighting Factors for Ede | Deep Dose Equivalent |
DCL-08-549, Third Quarter 2008 Report on Discharge Monitoring at Diablo Canyon Power Plant | 16 October 2008 | Third Quarter 2008 Report on Discharge Monitoring at Diablo Canyon Power Plant | |
DCL-08-088, Request for Extension of Enforcement Discretion and Revised Submittal Date for 10 CFR 50.48(c) (NFPA 805) License Amendment Request | 15 October 2008 | Request for Extension of Enforcement Discretion and Revised Submittal Date for 10 CFR 50.48(c) (NFPA 805) License Amendment Request | Safe Shutdown Enforcement Discretion Probabilistic Risk Assessment Operator Manual Action Fire Protection Program |
TAC:ME0075 | 15 October 2008 | ||
DCL-08-090, Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | 14 October 2008 | Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | Mission time Past operability |