UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 28, 2008 Mr. John Conway Senior Vice President - Station Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 770000 San Francisco, CA 94177-0001
SUBJECT:
DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 - CLOSEOUT OF GENERIC LETrER 2007-01, "INACCESSIBLE OR UNDERGROUND POWER CABLE FAILURES THAT DISABLE ACCIDENT MITIGATION SYSTEMS OR CAUSE PLANT TRANSIENTS" (TAC NOS. MD4321 AND MD4322)
Dear Mr. Conway:
On February 7, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2007-01 "Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070360665). GL 2007-01 requested that licensees provide the following information within 90 days of the date of the GL:
(1)
A history of inaccessible or underground power cable failures for all cables that are within the scope of Section 50.65 of Title 10 of the Code of Federal Regulations (10 CFR 50.65, the Maintenance Rule) and for all voltage levels including the cable type, cable manufacturer, date of failure, type of service, voltage class, years of service, and the root causes for the failure; and (2)
A description of all inspection, testing, and monitoring programs to detect the degradation of inaccessible or underground power cables that support emergency diesel generators (EDGs), offsite power, emergency service water (ESW), service water, component cooling water, and other systems that are within the scope of 10 CFR 50.65 (the Maintenance Rule).
In your letter dated May 2, 2007 (ADAMS Accession No. ML071290050), you provided the information requested in GL 2007-01 including:
(1)
A history of inaccessible or underground power cable failures for all cables that are within the scope of 10 CFR 50.65 (the Maintenance Rule) and for all voltage levels including the cable type, cable manufacturer, date of failure, type of service, voltage class, years of service, and the root causes for the failure; and (2)
A description of all inspection, testing, and monitoring programs to detect the degradation of inaccessible or underground power cables that support EDGs, offsite power, ESW, service water, component cooling water, and other systems that are within the scope of 10 CFR 50.65 (the Maintenance Rule).
J. Conway
- 2 The NRC staff has reviewed the submitted information and has concluded that for Diablo Canyon Power Plant, Unit Nos. 1 and 2, your response is adequate. Based on this review, your response to GL 2007-01 is considered closed and no further action is requested of you at this time.
If you have any questions regarding this letter, please feel free to contact me at (301) 415-1445.
Sincerely, r~ll_
1\\
~\\'l lJUQ/~
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 cc: See next page
Diablo Canyon Power Plant, Units 1 and 2 cc:
Sierra Club San Lucia Chapter ATTN: Andrew Christie P.O. Box 15755 San Luis Obispo, CA 93406 Chairman San Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite 0430 San Luis Obispo, CA 93408 Mr. Truman Burns Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, CA 94102 Diablo Canyon Independent Safety Committee Attn: Robert R. Wellington, Esq.
Legal Counsel 857 Cass Street, Suite 0 Monterey, CA 93940 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 612 E.Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Jennifer Post, Esq.
Pacific Gas & Electric Company P.O. Box 7442 San Francisco, CA 94120 (9/2008)
City Editor The Tribune 3825 South Higuera Street P.O. Box 112 San LUis, Obispo, CA 94306-0112 Director, Radiologic Health Branch State Department of Health Services P.O. Box 997414, MS 7610 Sacramento, CA 95899-7414 Mr. James R. Becker Site Vice President Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Jennifer Tang Field Representative United States Senator Barbara Boxer 1700 Montgomery Street, Suite 240 San Francisco, CA 94111 Additional Distribution via ListServ
October 28, 2008 J. Conway
- 2 The NRC staff has reviewed the submitted information and has concluded that for Diablo Canyon Power Plant, Unit Nos. 1 and 2, your response is adequate. Based on this review, your response to GL 2007-01 is considered closed and no further action is requested of you at this time.
If you have any questions regarding this letter, please feel free to contact me at (301) 415-1445.
Sincerely,
~wa~:t:anager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 cc: See next page DISTRIBUTION:
PUBLIC RidsOgcRp LPLIV RlF RidsAcrsAcnw&mMailCenter RidsNrrDorlLpl4 RidsRgn4MailCenter RidsNrrLAGLappert RidsNrrDeEeeb (GWilson)
RidsNrrPMAWang RidsNrrDorlDPR ADAMS Accession Number: ML082900274
- See previous concurrence NRR-106 OFFICE NRRlLPL4/PM NRRlLPL4/LA EEEB:BC NRRlLPL4/BC NRRlLPL4/PM NAME AWang (*)
GLappert (*)
GWilson (*)
MMarkley 01/11'""'\\.
AWang"'~~Ao.J DATE 10/17/08 10/16/08 10/22/08 (o('t6(o~