Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
TAC:MD7069 | 30 December 2008 | ||
ML083470652 | 30 December 2008 | Summary of Periodic Meeting with Firstenergy Nuclear Operating Company (FENOC) Staff on Licensing Action Status | |
ML083590148 | 24 December 2008 | Meeting Notice, Significant Licensee Meeting with Firstenergy Nuclear Operating Company (FENOC) Regarding Beaver Valley, Perry, and Davis-Besse Nuclear Generating Stations | |
ML083590161 | 24 December 2008 | Letter to Firstenergy Nuclear Operating Company (FENOC) Regarding Public Meeting Notice Regarding Beaver Valley, Perry and Davis-Besse Nuclear Generating Stations, Fleet Performance Review | |
ML092860052 | 23 December 2008 | Preliminary Post-Trial Brief of David Geisen | Boric Acid |
ML083450120 | 19 December 2008 | Safety Evaluation for Emergency Action Levels | |
TAC:MD7913 | 19 December 2008 | ||
L-08-382, Regulatory Conference Comment Clarification | 19 December 2008 | Regulatory Conference Comment Clarification | |
ML11126A083 | 18 December 2008 | Drawing No. LR-M038C, Revision 2, Piping & Instrument Diagram Gaseous Radioactive Waste System. Job Code 12501 | |
ML102510772 | 18 December 2008 | Drawing M-038C, Rev. 13, Piping & Instrument Diagram Gaseous Radioactive Waste System | |
L-08-317, Core Operating Limits, and Pressure and Temperature Limits Report | 16 December 2008 | Core Operating Limits, and Pressure and Temperature Limits Report | Shutdown Margin Hydrostatic Pressure and Temperature Limits Report |
L-08-354, Relocation of Relief Request RR-A18, Snubber Examination and Test Requirements | 16 December 2008 | Relocation of Relief Request RR-A18, Snubber Examination and Test Requirements | |
L-08-378, Implementation of Improved Technical Specification Amendment No. 279 | 16 December 2008 | Implementation of Improved Technical Specification Amendment No. 279 | |
ML083470432 | 11 December 2008 | Local Outreach Initiative Letter - Davis-Besse - Ottawa County | |
M091103, SRM-M091103B - Briefing on Fire Protection Lessons Learned from Shearon Harris | 10 December 2008 | SRM-M091103B - Briefing on Fire Protection Lessons Learned from Shearon Harris | |
ML083470257 | 10 December 2008 | Official Hearing Itmo David Geisen, Wednesday, December 10, 2008, Pages 1392-1677 | Boric Acid Finite Element Analysis Pressure Boundary Leakage |
ML093441258 | 10 December 2008 | SRM-M091103B - Briefing on Fire Protection Lessons Learned from Shearon Harris | |
ML083450682 | 8 December 2008 | Official Transcript of Hearing, in the Matter of David Geisen, Monday, December 8, 2008, Pages 793-1005 | Boric Acid Hydrostatic Nondestructive Examination Stolen |
ML083450161 | 4 December 2008 | GFE Annual Registration Letter - 2009 Examinations | Generic Fundamentals Examination |
ML11301A222 | 1 December 2008 | Reference: Combined Heat and Power Effective Energy Solutions for a Sustainable Future | |
L-08-357, Submittal of 2008 Confirmatory Order Independent Assessment Report of Engineering Programs Effectiveness | 21 November 2008 | Submittal of 2008 Confirmatory Order Independent Assessment Report of Engineering Programs Effectiveness | |
Press Release-08-214, NRC Licensing Board to Webcast Portion of Hearing on Davis-Besse Enforcement Case | 21 November 2008 | Press Release-08-214: NRC Licensing Board to Webcast Portion of Hearing on Davis-Besse Enforcement Case | |
ML082900683 | 20 November 2008 | Table A-DOC Attachment - Administrative Changes - to Davis-Besse Amend. ITS with Beyond Scope Issues | Shutdown Margin Offsite Dose Calculation Manual Post Accident Monitoring Hydrostatic Incorporated by reference Pressure and Temperature Limits Report Pressure Boundary Leakage Offsite Circuit |
ML083020031 | 20 November 2008 | Application to Use Weighting Factors for External Exposure | Deep Dose Equivalent |
ML082910125 | 20 November 2008 | ITSB R-Relocated Specifications - to Davis Besse Amendment Beyond Scope Issues | Safe Shutdown Boric Acid Shutdown Margin |
ML082900882 | 20 November 2008 | ITSB LA-Removed Details - Attachment to Davis-Besse Beyond Scope Issues | Shutdown Margin Power Operated Valves |
ML082900780 | 20 November 2008 | ITSB L-Less Restrictive Changes - Attachment to Davis-Besse Amendment Beyond Scope Issues | Boric Acid Shutdown Margin High Radiation Area Locked High Radiation Area Pressure and Temperature Limits Report Annual Radiological Environmental Operating Report Offsite Circuit |
ML082900600 | 20 November 2008 | Issuance of Amendment 279 for the Conversion to the Improved TSs with Beyond Scope Issues | Safe Shutdown Unanalyzed Condition Time of Discovery Shutdown Margin High Radiation Area Ultimate heat sink Mission time Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Post Accident Monitoring Hydrostatic Probabilistic Risk Assessment Nondestructive Examination Pressure and Temperature Limits Report Annual Radiological Environmental Operating Report Process Control Program Pressure Boundary Leakage Offsite Circuit Fire Protection Program Power change Unidentified leakage Power Uprate |
ML082910112 | 20 November 2008 | ITSB M - More Restrictive Changes - to Davis Besse Amendment Beyond Scope Issues | Reactor Vessel Water Level High Radiation Area Annual Radiological Environmental Operating Report |
ML082900630 | 20 November 2008 | List of Acronyms to Davis-Besse Amend. Re; ITS with Beyond Scope Issues | Shutdown Margin Offsite Dose Calculation Manual Anticipated operational occurrence Post Accident Monitoring Probabilistic Risk Assessment Pressure and Temperature Limits Report |
ML083230495 | 18 November 2008 | Notice of Closed Meeting to Discuss Firstenergy'S Assessment of the Results of Davis-Besse Force-on Force Exercises and Recent Security Performance | |
ML083190017 | 12 November 2008 | Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 | |
ML083190370 | 12 November 2008 | Davis-Besse (Geisen) David Geisen - Unopposed NRC Staff Motion for a Page Limit Extension | |
ML083190511 | 12 November 2008 | Davis-Besse (Geisen) David Geisen-NRC Staff Supplemental Disclosure Letter | |
L-08-329, and Perry Nuclear Power Plant, Unit 1 Actions Required by Confirmatory Order EA-07-199 | 12 November 2008 | and Perry Nuclear Power Plant, Unit 1 Actions Required by Confirmatory Order EA-07-199 | |
ML083120770 | 7 November 2008 | (Geisen) - Interrogatories, E-mail Notification to the Board and Counsel for Mr. Geisen That Staff Will Not Be Propounding Any Additional or Replacement Interrogatories Pursuant to Board'S November 5, 2008 Memorandum and Order | |
ML102510794 | 6 November 2008 | Drawing M-043, Revision 34, Piping 7 Instrument Diagram Auxiliary Building Chilled Water System. | |
ML11126A074 | 6 November 2008 | Drawing No. LR-M043, Revision 1, Piping & Instrument Diagram Auxiliary Building Chilled Water System. | |
ML091630201 | 4 November 2008 | Opposition of David Geisen to the NRC Staff'S Motion to Compel Discovery | Boric Acid Probabilistic Risk Assessment VT-2 Condition Adverse to Quality |
IR 05000346/2008404 | 31 October 2008 | IR 05000346-08-404, (Drs), on 09/15/2008 - 09/19/2008, for Davis-Besse | Significance Determination Process Affidavit |
ML090700074 | 31 October 2008 | Discovery Letter, L. Clark, OGC to A. Wise, Geisen | |
IR 05000346/2008201 | 27 October 2008 | IR 05000346-08-201, on 05/02/2008, Davis-Besse Nuclear Power Plant - Security Inspection | Significance Determination Process |
ML083020155 | 27 October 2008 | IR 05000346-08-201, on 05/02/2008, Davis-Besse Nuclear Power Plant - Security Inspection | |
ML101750112 | 27 October 2008 | Condensate Backwash Line Leak - Groundwater Well Sampling Week of 10/27/08 W/ Map | |
ML082880524 | 27 October 2008 | Closeout of Generic Letter 2007-01 Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients | |
IR 05000346/2008004 | 23 October 2008 | EA-03-0214, EA-07-0199, IR 05000346-08-004, on 7/1/2008 - 9/30/2008, Davis-Besse Nuclear Power Station, Post Maintenance Testing | High winds Ultimate heat sink Weld Overlay Past operability Temporary Modification Tornado-Generated Missile Significance Determination Process Biofouling Fire Protection Program Scaffolding Substantial potential for an overexposure Operability Assessment Power Uprate Measurement Uncertainty Recapture Overexposure |
ML082960642 | 22 October 2008 | EAL - RAIs | |
ML082960198 | 22 October 2008 | E-mail - RAI for Davis-Besse EAL Submittal | |
ML083030141 | 21 October 2008 | Engine Systems, Inc., Transmittal of 10CFR21-0095, Rev. 0 Reporting of Defects and Non-Compliance, Ingersoll-Rand Series 89 Air Start Motors, P/N 8367694-ESI | |
L-08-338, Copy of Improved Technical Specifications (ITS) | 21 October 2008 | Copy of Improved Technical Specifications (ITS) | Time of Discovery Shutdown Margin High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Post Accident Monitoring Hydrostatic Nondestructive Examination Pressure and Temperature Limits Report Annual Radiological Environmental Operating Report Process Control Program Pressure Boundary Leakage Offsite Circuit Fire Protection Program Power change Unidentified leakage Power Uprate |