Regulatory Conference Comment Clarification
ML083590214
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/19/2008
From: Allen B
FirstEnergy Nuclear Generation Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-08-382
Download: ML083590214 (2)


Text

FENOC 5501 North State Route 2 FirstEnergyNuclear Operating Company Oak Harbor, Ohio 43449 Barry S. Allen 419-321-7676 Vice President - Nuclear Fax: 419-321-7582 SAFEGUARDS INFORMATION

- WHEN SEPARATED FROM ATTACHMENT, HANDLE -

THIS DOCUMENT AS DECONTROLLED December 19, 2008 L-08-382 10 CFR 73.21 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Regulatory Conference Comment Clarification On October 27, 2008, the Nuclear Regulatory Commission (NRC) issued Inspection Report 05000346/2008201 for the Davis-Besse Nuclear Power Station, Unit 1 (DBNPS) for a security baseline inspection that concluded on-site activities on May 2, 2008. This inspection report documented a finding that appeared to have a greater than green security significance. In accordance with the guidance of the inspection report, the FirstEnergy Nuclear Operating Company (FENOC) requested a Regulatory Conference to discuss FENOC's perspectives on the facts and assumptions regarding the finding.

This Regulatory Conference was held at NRC Headquarters on December 3, 2008.

As a follow-up to this Regulatory Conference, additional information was requested by the NRC to clarify comments made by the FENOC staff and consultants during the conference. The requested information along with FENOC's response is included as Attachment 1 and Enclosures A and B. Because it was necessary to include Safeguards Information to provide an acceptable response, Attachment 1 is considered Safeguards Information per 10 CFR 73.21.

SAFEGUARDS INFORMATION

- WHEN SEPARATED FROM ATTACHMENT, HANDLE -

THIS DOCUMENT AS DECONTROLLED b/a 4l~

PtAez

SAFEGUARDS INFORMATION

- WHEN SEPARATED FROM ATTACHMENT, HANDLE -

THIS DOCUMENT AS DECONTROLLED Davis-Besse Nuclear Power Station, Unit 1 L-08-382 Page 2 of 2 There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Michael G. Parker, Manager, Davis-Besse Site Protection, at (419) 321-7253.

Sincerely, Barry S. Allen GMW Attachments:

1. Regulatory Conference Comment Clarification

Enclosures:

A. Wall Breach Test Analysis Summary, Hinman Consulting Engineers B. Excerpts from "Dynamic Entry Course: Guidebook for Dynamic Entry Techniques" cc: NRC Region III Administrator NRC Resident Inspector (w/o)

NRR Project Manager (w/o)

Utility Radiological Safety Board (w/o)

SAFEGUARDS INFORMATION

- WHEN SEPARATED FROM ATTACHMENT, HANDLE -

THIS DOCUMENT AS DECONTROLLED