Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML02358018923 December 2002Notice of Enforcement Discretion for Union Electric Regarding Callaway Plant (NOED 02-4-004)Enforcement Discretion
ULNRC-04783, Response to Information Requested 30 Days After the Next Refueling Outage by NRC Bulletins 2001-01, 2002,01, & 2002-0220 December 2002Response to Information Requested 30 Days After the Next Refueling Outage by NRC Bulletins 2001-01, 2002,01, & 2002-02Boric Acid
Foreign Material Exclusion
Pressure Boundary Leakage
ULNRC-04787, Core Operating Limits Report20 December 2002Core Operating Limits Report
PNO-IV-02-077, A - Union Electric Co., Update - Automatic Reactor Trip While Reducing Power Due to Condensate Pump Failure19 December 2002PNO-IV-02-077A - Union Electric Co., Update - Automatic Reactor Trip While Reducing Power Due to Condensate Pump FailureEnforcement Discretion
Power change
ML02346003312 December 2002Summary of Meeting with Strategic Teaming & Resource Sharing-Integrated Regulatory Affairs Group for Callaway, Comanche Peak, Diablo Canyon, South Texas, Wolf Creek & Palo Verde
ML02354025212 December 2002November 2002 Monthly Operating Report for Callaway Unit 1
ML02344014010 December 2002Clarifying Information for Radiological Emergency Response Plan Change Submitted May 6, 2002 for Callaway Plant
ML0234001853 December 2002NRC Plans to Administer Generic Fundamentals Section of Written Operator Licensing Examination on 02/05/2003Generic Fundamentals Examination
ML0233601362 December 2002Inspection Date for Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures - Callaway Plant
ML02333045727 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
ML02338053627 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
ML02326014821 November 2002RAI, Bulletin 2002-01 Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity, 15-Day & 60-Day ResponsesBoric Acid
VT-2
Pressure Boundary Leakage
ULNRC-04778, Special Report 2002-04 Inservice Inspection Results for Steam Generator Tube Inspections - Number of Tubes Plugged or Repaired21 November 2002Special Report 2002-04 Inservice Inspection Results for Steam Generator Tube Inspections - Number of Tubes Plugged or Repaired
ULNRC-04776, C-3 Classified Inservice Inspection Results for Steam Generator Tube Inspections19 November 2002C-3 Classified Inservice Inspection Results for Steam Generator Tube Inspections
ML02317001213 November 2002Response to NRC Bulletin 2002-02 Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs.
ML0231200247 November 2002Meeting Handouts - Meeting with Strategic Teaming and Resources Sharing - Integrated Regulatory Affairs GroupMissed surveillance
Recently irradiated fuel
ML0228805234 November 2002Withholding from Public Disclosure, Steam Generator Tube Surveillance Program, TAC MB6478, CAW-02-1558
ML0232401962 November 2002October 2002 Monthly Operating Report for Callaway Plant Unit 1
ML0230905411 November 2002Generic Fundamentals Examination ResultsGeneric Fundamentals Examination
TAC:MB653430 October 2002
ULNRC-04768, Amerenue - Revision to Request for Relief from ASME Section III Requirements Regarding Non-Destructive Examination of Welds Performed Under Site Repair/Replacement Program for Callaway, Unit 130 October 2002Amerenue - Revision to Request for Relief from ASME Section III Requirements Regarding Non-Destructive Examination of Welds Performed Under Site Repair/Replacement Program for Callaway, Unit 1Non-Destructive Examination
ULNRC-04765, Operating License Appendix B Report Unanticipated Cooling Tower Basin Ph Excursion25 October 2002Operating License Appendix B Report Unanticipated Cooling Tower Basin Ph ExcursionUltimate heat sink
Grab sample
ML02311010325 October 2002Comment from D. R. Woodlan on DG-1099, Anchoring Components and Structural Supports in Concrete.Backfit
ML02302030922 October 2002Emergency Plan Implementing Procedure EIP-ZZ-00231 Rev. 015, Response to Severe Thunderstom/High Winds/Tornado Watches & WarningsHigh winds
Tornado Missile Protection
Press Release-IV-02-044, Michael Peck Named NRC Senior Resident Inspector at Callaway18 October 2002Press Release-IV-02-044: Michael Peck Named NRC Senior Resident Inspector at Callaway
ML02301057817 October 2002Response to NRC Letter Dated 09/19/02
ULNRC-04760, Request for Relief from ASME Section III Requirements Regarding Non-Destructive Examination of Welds Performed Under Site Repair/Replacement Program17 October 2002Request for Relief from ASME Section III Requirements Regarding Non-Destructive Examination of Welds Performed Under Site Repair/Replacement ProgramNondestructive Examination
IR 05000483/200200515 October 2002IR 05000483-02-005; on 07/07-10/05/2002; Union Electric Co; Callaway Plant Integrated Resident & Regional ReportUltimate heat sink
Fire Barrier
Temporary Modification
Significance Determination Process
Siren
ULNRC-04751, 10CFR50.46 Annual Report ECCS Evaluation Model Revisions14 October 200210CFR50.46 Annual Report ECCS Evaluation Model Revisions
ML02294016314 October 2002Emergency Plan Implementing Procedure EIP-ZZ-00231, Revision 014High winds
Tornado Missile Protection
ML02316025811 October 2002Callaway Meeting Summary Two Performance Deficiencies Previously Identified & InspectedCondition Adverse to Quality
Foreign Material Exclusion
ULNRC-04754, September 2002 Monthly Operating Report for Callaway Plant Unit 111 October 2002September 2002 Monthly Operating Report for Callaway Plant Unit 1
TAC:MB647811 October 2002
ML02282059911 October 2002Notice of Consideration/Issuance of Amendment to Change Technical Specification 5.5.9
ML02274009010 October 2002STARS-Meeting with Strategic Teaming and Resource Sharing-Integrated Regulatory Affairs Group (Stars-IRAG) for the Licrensees of Callaway, Comanche Peak, Diablo Canyon, Palo Verde, South Texas and Wolf Creek Plants
ML0229001198 October 2002Transmittal of Replacement Page 3.3-17 of the Technical Specification for Amendment 151
ML0229002247 October 2002Tech Spec Pages to Amendment 151, Tech Spec Bases and FSAR Ch 16 Tech Spec
ULNRC-04745, Application for Amendment to License NPF-30, to Revise Technical Specification 5.5.93 October 2002Application for Amendment to License NPF-30, to Revise Technical Specification 5.5.9Shutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Operating Basis Earthquake
Pressure and Temperature Limits Report
Annual Radiological Environmental Operating Report
Process Control Program
Deep Dose Equivalent
ULNRC-04743, Revision to SG Water Level Low Low LCO Applicability & Allowable Values in TS 3.3.1 & 3.3.23 October 2002Revision to SG Water Level Low Low LCO Applicability & Allowable Values in TS 3.3.1 & 3.3.2Safe Shutdown
Anticipated operational occurrence
Probabilistic Risk Assessment
ULNRC-04742, Revision to Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2.3 October 2002Revision to Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2.Shutdown Margin
Anticipated operational occurrence
Probabilistic Risk Assessment
IR 05000483/20020091 October 2002IR 05000483-02-009, Errata to 08/12/2002-08/16/2002 Supplemental Inspection Report