Inspection Date for Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures - Callaway Plant
ML023360136
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/02/2002
From: Troy Pruett
Plant Support Branch Region IV
To: Randolph G
Union Electric Co
References
Download: ML023360136 (4)


Text

December 2, 2002 Garry L. Randolph, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, Missouri 65251

SUBJECT:

INSPECTION DATE FOR TEMPORARY INSTRUCTION 2515/148, INSPECTION OF NUCLEAR REACTOR SAFEGUARDS INTERIM COMPENSATORY MEASURES - CALLAWAY PLANT

Dear Mr. Randolph:

In the mid-cycle assessment letter transmitted on August 26, 2002, the NRC indicated that a follow-up letter would be needed to describe the dates for implementing the temporary instruction that would be used to verify compliance with the NRC Security Order issued on February 25, 2002.

Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures, was issued August 28, 2002. The NRC has scheduled an inspection using this temporary instruction, at your facility February 10-17, 2003.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If you have questions about this inspection, please contact me at 817/860-8182.

Sincerely,

/RA/

T. W. Pruett, Chief Plant Support Branch Division of Reactor Safety Docket: 50-483 License: NPF-30

Union Electric Company cc:

Professional Nuclear Consulting, Inc.

19041 Raines Drive Derwood, Maryland 20855 John ONeill, Esq.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W.

Washington, D.C. 20037 Mark A. Reidmeyer, Regional Regulatory Affairs Supervisor Regulatory Affairs AmerenUE P.O. Box 620 Fulton, Missouri 65251 Manager - Electric Department Missouri Public Service Commission 301 W. High P.O. Box 360 Jefferson City, Missouri 65102 Ronald A. Kucera, Deputy Director for Public Policy Department of Natural Resources 205 Jefferson Street Jefferson City, Missouri 65101 Otto L. Maynard, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, Kansas 66839 Dan I. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, Missouri 63130 Lee Fritz, Presiding Commissioner Callaway County Courthouse 10 East Fifth Street Fulton, Missouri 65251

Union Electric Company J. V. Laux, Manager Quality Assurance AmerenUE P.O. Box 620 Fulton, Missouri 65251 Jerry Uhlmann, Director State Emergency Management Agency P.O. Box 116 Jefferson City, Missouri 65101 Scott Clardy, Director Section for Environmental Public Health P.O. Box 570 Jefferson City, Missouri 65102-0570 John D. Blosser, Manager Regulatory Affairs AmerenUE P.O. Box 620 Fulton, Missouri 65251

Union Electric Company Electronic distribution by RIV:

Regional Administrator (EWM)

DRP Director (ATH)

DRS Director (DDC)

Senior Resident Inspector (MSP)

Branch Chief, DRP/B (DNG)

Senior Project Engineer, DRP/B (RAK1)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (NBH)

Scott Morris (SAM1)

CWY Site Secretary (DVY)

DOCUMENT NAME: R:\_CW\2002\ICM-CW.WPD RIV:DRS\PSB C:PSB GPick:nlh TWPruett

/RA/ /RA/

11/29/02 11/29/02 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax