November 13, 2002 Mr. Garry L. Randolph Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251
SUBJECT:
CALLAWAY PLANT, UNIT 1 - RESPONSE TO NRC BULLETIN 2002-02, "REACTOR PRESSURE VESSEL HEAD AND VESSEL HEAD PENETRATION NOZZLE INSPECTION PROGRAMS" (TAC NO. MB5878)
Dear Mr. Randolph:
On August 9, 2002, the U.S. Nuclear Regulatory Commission (NRC) issued Bulletin 2002-02, "Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs."
The Bulletin requested addressees to provide information related to their reactor pressure vessel (RPV) head and vessel head penetration (VHP) nozzle inspection programs for their respective facilities, including a summary discussion of inspection program plans to supplement their required visual inspections with non-visual nondestructive examination methods, or justification for reliance on visual examinations as the primary method to detect degradation.
Addressees were requested to respond to Item 1 of the Bulletin within 30 days of its issuance, or within 15 days of its issuance, to provide an alternative course of action, including the basis for acceptability of the proposed action.
By letter dated September 11, 2002 (ULNRC-04731), you provided a response to Item 1 of the Bulletin, providing your plans to perform RPV head and VHP nozzle inspections at the Callaway Plant. The response also indicated that the plant is in the category of plants considered to have low susceptibility to RPV head and VHP cracking, based on a susceptibility ranking of less than 8 effective degradation years (EDY). Specifically, you stated that Callaway had approximately 2.5 EDY, in accordance with the Electric Power Research Institute (EPRI) Materials Reliability Program (MRP) Report MRP-48.
The NRC staff has reviewed your response to Item 1 of the Bulletin. In that response, you stated that your immediate inspection plan is to perform a 100% bare metal visual examination of the RPV head (i.e., 100% of the carbon steel surface and 100% of the interface area between the head penetrations and the carbon steel on top of the head) during refueling outage No. 12. The staff finds that this inspection plan is adequate for providing reasonable assurance that existing regulatory requirements are met.
The staff notes that your justification for reliance on visual examinations and long-term inspection plans relies on the EPRI MRP inspection plan for pressurized water reactor RPV upper head penetrations. The staff has not completed its review of the MRP inspection plan and, as such, has not made a determination on the adequacy of the program for ensuring applicable regulatory requirements are met. Therefore, the staffs assessment of your justification and the adequacy of your long-term inspection program plans will be determined upon completion of the staffs review of the MRP proposed inspection plan.
Mr. Garry L. Randolph Also, as stated in Item 2 of the Bulletin, you are requested to report to the Commission your inspection scope and results within 30 days after plant restart following the inspection of the RPV head and VHP nozzles.
If you have any questions on this issue or this letter, contact me at (301) 415-1307.
Sincerely,
/RA/
Jack Donohew, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-483 cc: See next page
Mr. Garry L. Randolph Also, as stated in Item 2 of the Bulletin, you are requested to report to the Commission your inspection scope and results within 30 days after plant restart following the inspection of the RPV head and VHP nozzles.
If you have any questions on this issue or this letter, contact me at (301) 415-1307.
Sincerely,
/RA/
Jack Donohew, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-483 cc: See next page DISTRIBUTION:
PUBLIC PDIV-2 Reading RidsNrrDlpmLpdiv (WRuland)
SDembek RidsNrrPMJDonohew RidsNrrLAEPeyton RidsOgcRp RidsAcrsAcnwMailCenter RidsRgn4MailCenter WReckley BPham DGraves, RIV LMarsh AHiser MMarshall TTate SBloom TChan AMendiola ACCESSION NO.: ML023170012 OFFICE PDIV-2/PM PDIV-2/LA LPM EMCB/SC PDIV-2/SC NAME JDonohew:rkb EPeyton TTate TChan SDembek DATE 11/8/2002 11/8/02 11/8/02 11/8/02 11/12/02 DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML023170012.wpd OFFICIAL RECORD COPY
Callaway Plant, Unit 1 cc:
Professional Nuclear Consulting, Inc.
19041 Raines Drive Derwood, MD 20855 John ONeill, Esq.
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W.
Washington, D.C. 20037 Mr. Mark A. Reidmeyer, Regional Regulatory Affairs Supervisor Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 U.S. Nuclear Regulatory Commission Resident Inspector Office 8201 NRC Road Steedman, MO 65077-1302 Mr. J. V. Laux, Manager Quality Assurance AmerenUE P.O. Box 620 Fulton, MO 65251 Manager - Electric Department Missouri Public Service Commission 301 W. High P.O. Box 360 Jefferson City, MO 65102 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Mr. Ronald A. Kucera, Deputy Director for Public Policy Department of Natural Resources 205 Jefferson Street Jefferson City, MO 65101 Mr. Otto L. Maynard President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KA 66839 Mr. Dan I. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, MO 63130 Mr. Lee Fritz Presiding Commissioner Callaway County Court House 10 East Fifth Street Fulton, MO 65151 Mr. David E. Shafer Superintendent Licensing Regulatory Affairs AmerenUE P.O. Box 66149, MC 470 St. Louis, MO 63166-6149 Mr. John D. Blosser, Manager Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 Mr. Scott Clardy, Director Section for Environmental Public Health P.O. Box 570 Jefferson City, Missouri 65102-0570