MONTHYEARULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 IR 05000483/20230042024-01-19019 January 2024 Integrated Inspection Report 05000483/2023004 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23317A0012024-01-12012 January 2024 Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML24011A1492024-01-11011 January 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information (05000483/2024011) ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ML23346A0392023-12-14014 December 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Relief from Requirements of ASME Code, Section Xl, Examination and Testing Unbonded Post-Tensioning System ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification 05000483/LER-2023-001, Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications2023-11-29029 November 2023 Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) IR 05000483/20230102023-11-15015 November 2023 NRC License Renewal Phase 1 Inspection Report 05000483 2023010 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23297A2502023-11-0606 November 2023 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (EPID L-2022-LLA-0176) - Letter IR 05000483/20240122023-10-24024 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000483/2024012) ML23293A2652023-10-24024 October 2023 3rd Quarter 2023 Integrated Inspection Report ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23270B9662023-09-27027 September 2023 10 CFR 50.55a(z)(I) Request for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23261C3852023-09-25025 September 2023 Safety Evaluation for Operating Quality Assurance Manual Revision 36A ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23206A1992023-09-15015 September 2023 Regulatory Audit Summary Regarding License Amendment and Regulatory Exemptions Request for Fuel Transition to Framatome Gaia Fuel (Epids L-2022-LLA-0150 and L-2022-LLE-0030) IR 05000483/20234012023-09-13013 September 2023 NRC Security Baseline Inspection Report 05000483/2023401 ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20230052023-08-23023 August 2023 Updated Inspection Plan for Callaway Nuclear Power Plant, Unit 1 (Report 05000483/2023005) - Mid Cycle Letter 2023 ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ML23215A1972023-08-0303 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications IR 05000483/20230022023-07-10010 July 2023 Integrated Inspection Report 05000483/2023002 ML23174A1272023-06-23023 June 2023 Cw FFD Document Request List 2023 ML23171A9942023-06-22022 June 2023 Acceptance of Request for Approval of Operating Quality Assurance Manual Revision 36a ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) IR 05000483/20230112023-06-15015 June 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000483/2023011 ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ML23158A1462023-06-13013 June 2023 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000483/2023010) ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ML23093A0952023-05-10010 May 2023 Issuance of Amendment No. 232 Regarding Technical Specification Changes for Spent Fuel Storage ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ML23129A7942023-05-0909 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) ML23122A3172023-05-0808 May 2023 Review of the Spring 2022 Steam Generator Tube Inservice Inspections ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure 2024-01-29
[Table view] |
Text
December 23, 2002 Garry L. Randolph, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, Missouri 65251
SUBJECT:
NOTICE OF ENFORCEMENT DISCRETION FOR UNION ELECTRIC REGARDING CALLAWAY PLANT (NOED 02-4-004)
By letter dated December 18, 2002, you requested that the NRC exercise discretion not to enforce compliance with the actions required in Technical Specification 3.7.5, Action C.1. That letter documented information previously discussed with the NRC in a telephone conversation on December 16, 2002, at 3:45 p.m. (CST). You stated that as of December 17, 2002, at 5:01 a.m. (CST) the plant would not be in compliance with Technical Specification 3.7.5, which required that the plant be in Mode 4 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. You requested that a Notice of Enforcement Discretion (NOED) be issued pursuant to the NRC's policy regarding exercise of discretion for an operating facility, set out in Section VII.c, of the "General Statement of Policy and Procedures for NRC Enforcement Actions" (Enforcement Policy), NUREG-1600, and be effective for the period 5:01 a.m. (CST) December 17, 2002, through 5:01 a.m. (CST)
December 19, 2002. We understand that the condition causing the request for this NOED was corrected causing you to exit from Technical Specification 3.7.5 and from this NOED at 8:14 a.m. on December 17.
Participants in the December 16, 2002, telephone conversation included Ellis Merschoff, Regional Administrator, Region IV; Arthur Howell lll, Director, Division of Reactor Projects, RIV; Dwight Chamberlain, Director, Division of Reactor Safety, RIV; Francis Brush, Acting Chief, Project Branch B, Division of Reactor Projects, RIV; David Loveless, Senior Reactor Analyst, Division of Reactor Safety, RIV; Michael Peck, Senior Resident Inspector at Callaway Plant, RIV; William H. Ruland, Director, Project Directorate IV, Division of Licensing Project Management, Office of Nuclear Reactor Regulation; Jack Donohew, Senior Project Manager, Division of Licensing Project Management, Office of Nuclear Reactor Regulation; and Ronald D. Affolter, Vice President - Nuclear, Callaway Plant, and members of his staff.
According to your staff, on December 14, 2002, at 5:01 a.m. (CST) the Callaway Plant turbine-driven auxiliary feedwater pump was declared inoperable when it tripped during an auxiliary feedwater initiation on low steam generator water level. Investigations identified that the pump governor stem was binding which resulted in an overspeed trip. The schedule for repair of the governor and postmaintenance testing would potentially exceed the Technical Specification 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time by up to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
The safety basis submitted by Union Electric included compensatory measures and an evaluation of the potential impact on public health and safety and the environment. The safety basis submitted indicated that the proposed enforcement discretion did not involve a net
Union Electric Co. increase in radiological risk and would not be a potential detriment to public health and safety.
This assessment was based on your implementation of the proposed compensatory measures, and that proceeding to Mode 4 would provide no decrease in core damage frequency and would increase the risk due to the potential for interfacing systems loss of coolant accidents while cooling down. Your compensatory measures included: (1) no other planned maintenance or testing would be performed that would render other risk-related systems inoperable; and (2) access to and activities in the switchyard would be restricted to operator rounds.
We evaluated your request and agreed that maintaining the plant stable in Mode 3 for an additional 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> was preferable to the potential for a plant transient that could occur during a plant cooldown. Also, we agreed that your compensatory measures, risk analysis, and basis considerations were appropriate to demonstrate that the additional 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> would not involve a net increase in radiological risk and would not be a potential detriment to public health and safety.
We reviewed your letter dated December 18, 2002, in which you documented the subjects discussed in the telephone conversations of December 16, 2002. The letter accurately reflected the discussions regarding the description of the event, the basis for no net increase in radiological risk, the justification for the duration of the potential noncompliance including apparent root cause, the basis for the determination that the potential noncompliance was not a potential detriment to public health and safety and that no significant hazard consideration was involved, the environmental evaluation, the compensatory measures proposed, as well as the review and approval by your onsite review committee, and your basis for the type of Notice of Enforcement Discretion requested.
On the basis of our evaluation of your request, including the compensatory measures described above, we concluded that an NOED was warranted because we were clearly satisfied that this action had no adverse radiological impact on public health and safety. Additionally, we determined that the request satisfied the NRCs policy for enforcement discretion as specified in Section B.2.1.1.a of NRC Inspection Manual Chapter 9900. Therefore, it is our intention to exercise discretion not to enforce compliance with Technical Specification 3.7.5, Action C.1, for the inoperable turbine-driven auxiliary feedwater pump for the period from December 17, 2002, at 5:01 a.m. (CST) until December 19, 2002, at 5:01 a.m. (CST). This letter documents our telephone conversation of December 16, 2002, at 6:16 p.m. (CST) when we orally issued this enforcement discretion, and our review of your written request dated December 18, 2002.
However, as stated in the Enforcement Policy, action will be taken, to the extent that violations were involved, for the root cause or causes that led to the request for this NOED.
Sincerely,
/RA/
Ellis W. Merschoff Regional Administrator Docket: 50-483 License: NPF-30
Union Electric Co. Professional Nuclear Consulting, Inc.
19041 Raines Drive Derwood, Maryland 20855 John ONeill, Esq.
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W.
Washington, D.C. 20037 Mark A. Reidmeyer, Regional Regulatory Affairs Supervisor Regulatory Affairs AmerenUE P.O. Box 620 Fulton, Missouri 65251 Manager - Electric Department Missouri Public Service Commission 301 W. High P.O. Box 360 Jefferson City, Missouri 65102 Ronald A. Kucera, Deputy Director for Public Policy Department of Natural Resources 205 Jefferson Street Jefferson City, Missouri 65101 Otto L. Maynard, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, Kansas 66839 Dan I. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, Missouri 63130 Lee Fritz, Presiding Commissioner Callaway County Courthouse 10 East Fifth Street Fulton, Missouri 65251
Union Electric Co. J. V. Laux, Manager Quality Assurance AmerenUE P.O. Box 620 Fulton, Missouri 65251 Jerry Uhlmann, Director State Emergency Management Agency P.O. Box 116 Jefferson City, Missouri 65101 Scott Clardy, Director Section for Environmental Public Health P.O. Box 570 Jefferson City, Missouri 65102-0570 John D. Blosser, Manager Regulatory Affairs AmerenUE P.O. Box 620 Fulton, Missouri 65251
Union Electric Co. Electronic distribution by RIV:
Regional Administrator (EWM)
DRP Director (ATH)
DRS Director (DDC)
Senior Resident Inspector (MSP)
Branch Chief, DRP/B (DNG)
Senior Project Engineer, DRP/B (RAK1)
Staff Chief, DRP/TSS (PHH)
RITS Coordinator (NBH)
W. Kane, DEDR (WFK)
W. Ruland, Director, Project Directorate IV, NRR (WHR)
G. Shukla, Project Manager, NRR, PDIV-2 (GSS)
B. Sheron, Associate Director for Project Licensing & Technical Analysis, NRR (BWS)
W. Borchardt, Associate Director for Inspection & Programs, NRR (RWB1)
J. Zwolinski, Director, DLPM, NRR (JAZ)
F. Congel, Director, Office of Enforcement (FJC)
S. Morris, OEDO, RIV Coordinator (SAM1)
G. Sanborn, D:ACES, Region IV (GFS)
OEWEB NOED R:\_NOED\CW02-4-004 RIV:C:DRP/B D:DRP PDIV D:ACES DRA RA DNGraves;tbh ATHowell WHRuland GFSanborn TPGwynn EWMerschoff
/RA/ /RA/ E-DNGraves GMVasquez /RA/ /RA/
12/20/02 12/20/02 12/23/02 12/20/02 12/23/02 12/23/02 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax